{"id":"720c5a47-de2f-4387-bf19-da401da0655e","slug":"bdx-cgk4-ai-data-center-park","name":"BDx CGK4 AI Data Center Park (West Java)","aliases":["BDx CGK4","CGK4 AI Data Center Park","BDx AI Campus 2 CGK4","BDx Jatiluhur AI campus","CGK4 West Java","BDx Purwakarta AI DC","BDx Indonesia CGK4"],"locationId":"b00816d8-a434-4310-aff6-31616b4b3ae4","lat":-6.53,"lng":107.38,"locationPrecision":"city","landStatus":null,"lifecycleState":"partially_energized","powerSourceMix":null,"interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"PT PLN (Persero)","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"BDx Indonesia's CGK4 AI data-center park in West Java (a BDx / Indosat / Lintasarta JV), from which Lintasarta runs its Deka GPU / GPU Merdeka service on 8x NVIDIA H100 SXM per server. 500 MW total scalable campus target (announced); Phase 1 completed/operational; power density up to 120 kW/rack. A 30 MVA PLN supply covers the CGK3A + CGK4 portfolio, not CGK4 alone.","keyFacts":[{"label":"640 MW CGK4 groundbreaking / PLN power (primary)","value":"On Sept 22, 2026, BDx announced groundbreaking on AI Campus 2 (CGK4), a 640 MW AI data center campus in Jatiluhur, West Java, backed by 845 MVA of grid capacity from PLN, with development expected over about three years and sequential building commissioning ([PR Newswire / BDx, Sept 22 2026](https://www.prnewswire.com/apac/news-releases/bdx-breaks-ground-on-640mw-ai-data-center-in-west-java-backed-by-845mva-of-secured-grid-power-302885578.html))","sourceUrl":"https://www.prnewswire.com/apac/news-releases/bdx-breaks-ground-on-640mw-ai-data-center-in-west-java-backed-by-845mva-of-secured-grid-power-302885578.html"},{"label":"Building 1 120 MW / early 2027 (primary)","value":"BDx says construction has begun on Building 1, the first of six planned buildings, delivering 120 MW of IT capacity in phases, with the first contracted phase expected to enter service in early 2027. Design uses direct-to-chip liquid cooling engineered for up to 500 kW per rack ([PR Newswire / BDx, Sept 22 2026](https://www.prnewswire.com/apac/news-releases/bdx-breaks-ground-on-640mw-ai-data-center-in-west-java-backed-by-845mva-of-secured-grid-power-302885578.html))","sourceUrl":"https://www.prnewswire.com/apac/news-releases/bdx-breaks-ground-on-640mw-ai-data-center-in-west-java-backed-by-845mva-of-secured-grid-power-302885578.html"},{"label":"NVIDIA DGX-Ready / hydro pathway (primary)","value":"BDx states CGK4 achieved NVIDIA DGX-Ready Colocation Data Center certification in April 2025, is about five kilometers from Jatiluhur Dam, and is pursuing lower-carbon pathways including a hydroelectric arrangement with PJT alongside PLN grid power ([PR Newswire / BDx, Sept 22 2026](https://www.prnewswire.com/apac/news-releases/bdx-breaks-ground-on-640mw-ai-data-center-in-west-java-backed-by-845mva-of-secured-grid-power-302885578.html))","sourceUrl":"https://www.prnewswire.com/apac/news-releases/bdx-breaks-ground-on-640mw-ai-data-center-in-west-java-backed-by-845mva-of-secured-grid-power-302885578.html"},{"label":"Indonesia AI campus platform / financing (primary)","value":"BDx frames CGK4 as part of an Indonesia AI campus platform with AI Campus 1 (CGK3/3A), AI Campus 2 (CGK4), and AI Campus 3 (CGK5), citing 1.2 GVA+ secured grid capacity across AI-ready campuses and support from a US$320 million loan facility secured in 2026 ([PR Newswire / BDx, Sept 22 2026](https://www.prnewswire.com/apac/news-releases/bdx-breaks-ground-on-640mw-ai-data-center-in-west-java-backed-by-845mva-of-secured-grid-power-302885578.html))","sourceUrl":"https://www.prnewswire.com/apac/news-releases/bdx-breaks-ground-on-640mw-ai-data-center-in-west-java-backed-by-845mva-of-secured-grid-power-302885578.html"},{"label":"Six-building / 500 kW-per-rack design (primary)","value":"BDx's Sept 22, 2026 groundbreaking release states Building 1 is the first of six planned buildings at CGK4, delivering 120 MW of IT capacity in phases with first contracted phase expected early 2027, using direct-to-chip liquid cooling engineered for up to 500 kW per rack for current and future AI accelerators ([PR Newswire / BDx, Sept 22 2026](https://www.prnewswire.com/apac/news-releases/bdx-breaks-ground-on-640mw-ai-data-center-in-west-java-backed-by-845mva-of-secured-grid-power-302885578.html))","sourceUrl":"https://www.prnewswire.com/apac/news-releases/bdx-breaks-ground-on-640mw-ai-data-center-in-west-java-backed-by-845mva-of-secured-grid-power-302885578.html"},{"label":"West Java officials at groundbreaking (primary)","value":"BDx says West Java Governor Dedi Mulyadi and Purwakarta Regent Saepul Bahri Binzein attended the CGK4 groundbreaking alongside BDx and BDx Indonesia leadership, framing the campus as a long-term West Java AI ecosystem investment ([PR Newswire / BDx, Sept 22 2026](https://www.prnewswire.com/apac/news-releases/bdx-breaks-ground-on-640mw-ai-data-center-in-west-java-backed-by-845mva-of-secured-grid-power-302885578.html))","sourceUrl":"https://www.prnewswire.com/apac/news-releases/bdx-breaks-ground-on-640mw-ai-data-center-in-west-java-backed-by-845mva-of-secured-grid-power-302885578.html"},{"label":"I Squared Capital / SEZ framing (primary)","value":"The BDx release About section states BDx is backed by I Squared Capital, and the body notes Indonesia Special Economic Zone incentives for large-scale infrastructure investment among factors supporting campus-scale AI development with available grid capacity and domestic demand ([PR Newswire / BDx, Sept 22 2026](https://www.prnewswire.com/apac/news-releases/bdx-breaks-ground-on-640mw-ai-data-center-in-west-java-backed-by-845mva-of-secured-grid-power-302885578.html))","sourceUrl":"https://www.prnewswire.com/apac/news-releases/bdx-breaks-ground-on-640mw-ai-data-center-in-west-java-backed-by-845mva-of-secured-grid-power-302885578.html"}],"reviewStatus":"reviewed","sources":[{"url":"https://www.bdxworld.com/press-release/bdx-data-centers-launches-first-phase-of-500mw-renewable-powered-ai-campus-in-indonesia/","title":"BDx Launches First Phase of 500MW Renewable-Powered AI Campus in Indonesia","sourceName":"BDx Data Centers"},{"url":"https://www.lintasarta.net/en/news/lintasarta-presents-gpu-merdeka-an-advanced-sovereign-ai-cloud-for-indonesia-powered-by-nvidia-ai/","title":"Lintasarta Presents GPU Merdeka, powered by NVIDIA","sourceName":"Lintasarta"},{"url":"https://www.prnewswire.com/apac/news-releases/bdx-breaks-ground-on-640mw-ai-data-center-in-west-java-backed-by-845mva-of-secured-grid-power-302885578.html","date":"2026-09-22","title":"BDx Breaks Ground on 640MW AI Data Center in West Java, Backed by 845MVA of Secured Grid Power","publisher":"PR Newswire / BDx Data Centers"}],"reviewNote":null,"createdAt":"2026-08-31T01:25:50.541Z","updatedAt":"2026-09-28T12:17:26.286Z","location":{"id":"b00816d8-a434-4310-aff6-31616b4b3ae4","name":"Jatiluhur, Purwakarta, West Java, Indonesia","slug":"jatiluhur-west-java","kind":"city","parentLocationId":null,"region":null,"lat":-6.53,"lng":107.38,"reviewStatus":"unreviewed","aliases":["Jatiluhur","Purwakarta","West Java"],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-31T01:25:49.767Z","updatedAt":"2026-08-31T01:25:49.767Z"},"parties":[{"id":"cb2c660e-d1d1-4505-97eb-9a406498d41c","dataCenterId":"720c5a47-de2f-4387-bf19-da401da0655e","companyId":null,"externalName":"BDx Indonesia","role":"developer","structureNotes":"Colo host/developer (BDx / Indosat / Lintasarta JV).","createdAt":"2026-08-31T01:25:52.167Z","company":null},{"id":"2e962aeb-07ee-4338-a6d8-42d8afb4bd22","dataCenterId":"720c5a47-de2f-4387-bf19-da401da0655e","companyId":"d753b9e3-f5c6-4c5d-a819-b020b1b091de","externalName":null,"role":"operator","structureNotes":"Runs Deka GPU / GPU Merdeka here.","createdAt":"2026-08-31T01:25:52.950Z","company":{"id":"d753b9e3-f5c6-4c5d-a819-b020b1b091de","name":"Lintasarta","slug":"lintasarta"}},{"id":"a1f8cfd1-533f-4eff-99ce-0780e2ed6db1","dataCenterId":"720c5a47-de2f-4387-bf19-da401da0655e","companyId":null,"externalName":"PT PLN (Persero)","role":"grid_operator","structureNotes":"30 MVA PPA across CGK3A + CGK4.","createdAt":"2026-08-31T01:25:53.721Z","company":null},{"id":"ebc5ffc5-28e0-47c0-ba4e-a47d008d8a5b","dataCenterId":"720c5a47-de2f-4387-bf19-da401da0655e","companyId":null,"externalName":"NVIDIA","role":"chip_supplier","structureNotes":"H100 SXM (DGX-Ready).","createdAt":"2026-08-31T01:25:54.574Z","company":null}],"capacityClaims":[{"id":"985a881d-2fda-45bf-b016-3d3d0805dccb","dataCenterId":"720c5a47-de2f-4387-bf19-da401da0655e","series":"announced","valueGw":0.5,"asOf":"2024-07-31T00:00:00.000Z","sourceUrl":"https://www.bdxworld.com/press-release/bdx-data-centers-launches-first-phase-of-500mw-renewable-powered-ai-campus-in-indonesia/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"500 MW total scalable campus target.","createdAt":"2026-08-31T01:25:51.628Z"}],"financialClaims":[],"metricClaims":[],"powerProjects":[],"facilities":[],"incidents":[],"events":[{"id":"9acb5a16-b259-44fb-a6c4-6be91a176de6","dataCenterId":"720c5a47-de2f-4387-bf19-da401da0655e","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"chip_supplier: NVIDIA","occurredAt":"2026-08-31T01:25:54.965Z","createdAt":"2026-08-31T01:25:54.965Z"},{"id":"c0f78f0f-a3b0-4c48-b41d-20a3bb6b21d0","dataCenterId":"720c5a47-de2f-4387-bf19-da401da0655e","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"grid_operator: PT PLN (Persero)","occurredAt":"2026-08-31T01:25:54.189Z","createdAt":"2026-08-31T01:25:54.189Z"},{"id":"9a136529-1f43-4552-acd0-e0314f61e481","dataCenterId":"720c5a47-de2f-4387-bf19-da401da0655e","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"operator: d753b9e3-f5c6-4c5d-a819-b020b1b091de","occurredAt":"2026-08-31T01:25:53.344Z","createdAt":"2026-08-31T01:25:53.344Z"},{"id":"430aeda8-68cb-453d-a534-be73c9033f14","dataCenterId":"720c5a47-de2f-4387-bf19-da401da0655e","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: BDx Indonesia","occurredAt":"2026-08-31T01:25:52.568Z","createdAt":"2026-08-31T01:25:52.568Z"},{"id":"b41547f6-81bf-4038-ac9a-d39a931f8a47","dataCenterId":"720c5a47-de2f-4387-bf19-da401da0655e","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"0.5","claimId":"985a881d-2fda-45bf-b016-3d3d0805dccb","detail":null,"occurredAt":"2026-08-31T01:25:51.938Z","createdAt":"2026-08-31T01:25:51.938Z"},{"id":"89dd3136-cb23-4b53-b6c8-dd074c345578","dataCenterId":"720c5a47-de2f-4387-bf19-da401da0655e","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"0.5","claimId":"985a881d-2fda-45bf-b016-3d3d0805dccb","detail":"reported · journalist_report","occurredAt":"2026-08-31T01:25:51.783Z","createdAt":"2026-08-31T01:25:51.783Z"}],"capacity_picture":{"announced_gw":0.5,"contracted_gw":null,"under_construction_gw":null,"energized_gw":null,"announced_minus_energized_gw":0.5,"by_series":{"announced":{"valueGw":0.5,"asOf":"2024-07-31T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://www.bdxworld.com/press-release/bdx-data-centers-launches-first-phase-of-500mw-renewable-powered-ai-campus-in-indonesia/"},"contracted":null,"under_construction":null,"energized":null}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"BDx CGK4 AI Data Center Park (West Java)","url":"https://registry.deploy.report/datacenters/bdx-cgk4-ai-data-center-park","geo":{"@type":"GeoCoordinates","latitude":-6.53,"longitude":107.38},"address":{"@type":"PostalAddress","addressLocality":"Jatiluhur, Purwakarta, West Java, Indonesia"}}}