{"id":"a7e192d1-9871-47ea-941d-491df0e1a677","slug":"beacon-dove-creek-tom-green-texas","name":"Dove Creek Data Center (Beacon)","aliases":["Westline TX Holdings","Beacon Dove Creek"],"locationId":"8319a86d-16b7-4adb-8395-1fbbdb3fac81","lat":31.34977,"lng":-100.63943,"locationPrecision":"exact","landStatus":"greenfield","lifecycleState":"announced","powerSourceMix":"behind_the_meter_gas","interconnectionQueueStatus":"Self-generating, with the grid relationship unstated: the TCEQ air permit application, filed by Westline TX Holdings and linked to Beacon Data Centers, covers banks of reciprocating natural gas engines to supply the site's electricity. Neither the filing coverage nor the developer says whether any of that power touches the grid.","interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"ERCOT","waterSourceNotes":"Off-grid; powered by on-site natural-gas reciprocating engines (RICE). ~1,240 acres of buildable land (est. 70% of total site). Facility sited 0.25 mi south of US 67 on FM 2335, west Tom Green County. Community concerns raised over water and power; water source not specified in permit reporting.","servingUtility":null,"acreage":1240,"totalBuildingSqft":null,"streetAddress":null,"notes":"Westline TX Holdings (linked to Beacon Data Centers) filed a TCEQ air-permit application (HAP93, 184380, PSDTX1710, GHGPSDTX275) in Aug 2026 for a multi-gigawatt data center on FM 2335 south of US 67 in Tom Green County, powered by on-site natural-gas reciprocating engines. Exact planned MW/GW is not publicly stated; Tom Green County commissioners rejected a moratorium and a public hearing was requested.","keyFacts":[{"label":"TCEQ air applications / behind-the-meter RICE (primary TCEQ)","value":"TCEQ's plain-language summary for Westline TX Holdings LLC (permits 184380, GHGPSDTX275, PSDTX1710) describes the Westline 2335 facility as a data center and energy facility on South FM 2335 about 0.25 miles south of US 67 near San Angelo in Tom Green County. It states the data center would not rely on the grid and would use onsite natural-gas reciprocating engines (RICE), with diesel emergency generators for outages ([TCEQ plain language summary, permit 184380](https://www.tceq.texas.gov/downloads/permitting/air/bilingual/pending-permit-notices/184380-pls-english.pdf))","sourceUrl":"https://www.tceq.texas.gov/downloads/permitting/air/bilingual/pending-permit-notices/184380-pls-english.pdf"},{"label":"Proposed annual emissions band (primary TCEQ)","value":"The same TCEQ summary lists proposed annual emissions including about 1,177.2 tons/year CO and 419.3 tons/year NOx (plus VOC, PM, SO2, and other pollutants), with SCR and oxidation catalysts on the RICE fleet. Exact planned IT/critical load in MW is not stated in that summary ([TCEQ plain language summary, permit 184380](https://www.tceq.texas.gov/downloads/permitting/air/bilingual/pending-permit-notices/184380-pls-english.pdf))","sourceUrl":"https://www.tceq.texas.gov/downloads/permitting/air/bilingual/pending-permit-notices/184380-pls-english.pdf"},{"label":"Beacon / public-meeting request (reported San Angelo LIVE)","value":"San Angelo LIVE reported (Aug 10 2026) that State Rep. Drew Darby requested a local TCEQ public meeting on Beacon Data Centers' pending Westline Energy Infrastructure Campus air permits (HAP93, 184380, PSDTX1710, GHGPSDTX275) after constituent opposition in the Dove Creek area. Frame as reported political/regulatory process, not a final permit decision ([San Angelo LIVE, Aug 10 2026](https://www.sanangelolive.com/news/san-angelo/2026-08-10/darby-reacts-dove-creek-data-center-tceq-permit-app))","sourceUrl":"https://www.sanangelolive.com/news/san-angelo/2026-08-10/darby-reacts-dove-creek-data-center-tceq-permit-app"}],"reviewStatus":"reviewed","sources":[{"url":"https://sanangelolive.com/news/san-angelo/2026-08-10/dove-creek-data-center-has-applied-tceq-permit-heres-what-know","date":"2026-08-10","title":"Dove Creek Data Center Has Applied for a TCEQ Permit: Here's What to Know","publisher":"San Angelo LIVE"},{"url":"https://conchoobserver.com/data-center-permits-detail-proposed-air-quality-footprint/","date":"2026-08-10","title":"Data Center Permits Detail Proposed Air Quality Footprint","publisher":"Concho Observer"},{"url":"https://www.tceq.texas.gov/downloads/permitting/air/bilingual/pending-permit-notices/184380-pls-english.pdf","date":"2026-06-01","title":"Plain Language Summary - Westline TX Holdings LLC (184380)","publisher":"TCEQ"},{"url":"https://www.sanangelolive.com/news/san-angelo/2026-08-10/darby-reacts-dove-creek-data-center-tceq-permit-app","date":"2026-08-10","title":"Darby Reacts to Dove Creek Data Center TCEQ Permit App","publisher":"San Angelo LIVE"}],"reviewNote":null,"createdAt":"2026-08-17T20:23:46.414Z","updatedAt":"2026-09-29T07:44:44.451Z","location":{"id":"8319a86d-16b7-4adb-8395-1fbbdb3fac81","name":"San Angelo","slug":"san-angelo-texas","kind":"city","parentLocationId":"45f67762-10f4-4255-be84-45c73efe25f9","region":"Texas","lat":31.4649685,"lng":-100.4405094,"reviewStatus":"reviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-17T20:23:46.036Z","updatedAt":"2026-08-21T03:20:12.226Z"},"parties":[{"id":"02396d1c-02ba-412d-9951-f2c903178e93","dataCenterId":"a7e192d1-9871-47ea-941d-491df0e1a677","companyId":null,"externalName":"Westline TX Holdings LLC","role":"developer","structureNotes":"Associated with Beacon Data Centers","createdAt":"2026-08-17T20:23:47.174Z","company":null},{"id":"b5fdf947-8045-4803-90b8-c609a515991c","dataCenterId":"a7e192d1-9871-47ea-941d-491df0e1a677","companyId":null,"externalName":"Beacon Data Centers","role":"operator","structureNotes":null,"createdAt":"2026-08-17T20:23:47.921Z","company":null}],"capacityClaims":[{"id":"76fa64f0-33a9-4349-9928-4f153932f425","dataCenterId":"a7e192d1-9871-47ea-941d-491df0e1a677","series":"announced","valueGw":2.409,"asOf":"2026-08-01T00:00:00.000Z","sourceUrl":"https://sanangelolive.com/news/san-angelo/2026-08-10/dove-creek-data-center-has-applied-tceq-permit-heres-what-know","sourceType":"permit_filing","evidenceTier":"reported","supersedesId":null,"note":"Up to 2,409 MW of on-site gas generation per TCEQ air permit application, supplied exclusively to a co-located data center (off-grid, behind-the-meter). Permitting stage as of Aug 2026.","createdAt":"2026-08-19T00:14:23.281Z"}],"financialClaims":[],"metricClaims":[],"powerProjects":[{"id":"660d6e54-a090-49a9-beeb-cf591c746377","dataCenterId":"a7e192d1-9871-47ea-941d-491df0e1a677","name":"Dove Creek on-site gas engines","type":"gas","capacityGw":null,"lifecycleState":"announced","sourceUrl":"https://conchoobserver.com/data-center-permits-detail-proposed-air-quality-footprint/","evidenceTier":"reported","note":"PSD + GHG-PSD air-permit application filed; MW not disclosed","createdAt":"2026-08-17T20:23:46.797Z"},{"id":"48017a12-9565-4f6e-9b96-33a18033d9a5","dataCenterId":"a7e192d1-9871-47ea-941d-491df0e1a677","name":"Dove Creek Technology Campus Power Plant (Westline 2335)","type":"gas","capacityGw":2.409,"lifecycleState":"announced","sourceUrl":"https://sanangelolive.com/news/san-angelo/2026-08-10/dove-creek-data-center-has-applied-tceq-permit-heres-what-know","evidenceTier":"reported","note":"TCEQ air permit application filed Aug 2026 by Westline TX Holdings LLC (Beacon Data Centers). Banks of reciprocating natural-gas engines with SCR (NOx) and oxidation catalysts (CO/VOC). Permit apps HAP93, 184380, PSDTX1710, GHGPSDTX275. Public-hearing decision pending.","createdAt":"2026-08-19T00:14:23.821Z"}],"facilities":[],"incidents":[],"events":[{"id":"02e368e1-c0de-4ff8-93cd-d88e90370c7d","dataCenterId":"a7e192d1-9871-47ea-941d-491df0e1a677","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"2.409","claimId":"76fa64f0-33a9-4349-9928-4f153932f425","detail":null,"occurredAt":"2026-08-19T00:14:23.592Z","createdAt":"2026-08-19T00:14:23.592Z"},{"id":"65d52cd5-cee3-4eaf-a8b8-43d414bfdd63","dataCenterId":"a7e192d1-9871-47ea-941d-491df0e1a677","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"2.409","claimId":"76fa64f0-33a9-4349-9928-4f153932f425","detail":"reported · permit_filing","occurredAt":"2026-08-19T00:14:23.433Z","createdAt":"2026-08-19T00:14:23.433Z"},{"id":"217dafd4-afc4-43a4-9710-39bc1f402077","dataCenterId":"a7e192d1-9871-47ea-941d-491df0e1a677","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"operator: Beacon Data Centers","occurredAt":"2026-08-17T20:23:48.298Z","createdAt":"2026-08-17T20:23:48.298Z"},{"id":"728ee344-e663-4ee5-a950-7412e5c9851b","dataCenterId":"a7e192d1-9871-47ea-941d-491df0e1a677","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: Westline TX Holdings LLC","occurredAt":"2026-08-17T20:23:47.536Z","createdAt":"2026-08-17T20:23:47.536Z"}],"capacity_picture":{"announced_gw":2.409,"contracted_gw":null,"under_construction_gw":null,"energized_gw":null,"announced_minus_energized_gw":2.409,"by_series":{"announced":{"valueGw":2.409,"asOf":"2026-08-01T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://sanangelolive.com/news/san-angelo/2026-08-10/dove-creek-data-center-has-applied-tceq-permit-heres-what-know"},"contracted":null,"under_construction":null,"energized":null}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Dove Creek Data Center (Beacon)","url":"https://registry.deploy.report/datacenters/beacon-dove-creek-tom-green-texas","geo":{"@type":"GeoCoordinates","latitude":31.34977,"longitude":-100.63943},"address":{"@type":"PostalAddress","addressLocality":"San Angelo"}}}