{"id":"6db978fa-8c95-4c64-96a1-0a4271e38943","slug":"coreweave-core-scientific-muskogee-oklahoma","name":"Core Scientific / CoreWeave Muskogee HPC Campus","aliases":[],"locationId":"8a69ab06-60f0-4b10-9ad9-74b6543df3ba","lat":null,"lng":null,"landStatus":"private","lifecycleState":"under_construction","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"SPP","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Core Scientific, CoreWeave and Port Muskogee broke ground in November 2024 on an initial 100 MW HPC data center for Nvidia GPU hosting under a CoreWeave lease. In 2025 Core Scientific outlined scaling the Muskogee campus to roughly 1.5 GW gross (about 1.0 GW leasable). CoreWeave's total contracted HPC hosting with Core Scientific across six sites is about 590 MW with a stated contract value near $8.7 billion.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.datacenterdynamics.com/en/news/coreweave-and-core-scientific-break-ground-on-100mw-data-center-in-muskogee-oklahoma/","title":"DCD: CoreWeave and Core Scientific break ground in Muskogee"},{"url":"https://www.okcommerce.gov/core-scientific-and-port-muskogee-break-ground-on-100-mw-hpc-data-center/","title":"Oklahoma Commerce: Muskogee 100 MW HPC groundbreaking"},{"url":"https://blockspace.media/insight/core-scientific-jumps-7-in-morning-markets-as-data-center-firm-announces-440-mw-expansion-at-oklahoma-site/","title":"Blockspace: Core Scientific Oklahoma expansion"}],"reviewNote":null,"createdAt":"2026-08-19T00:48:11.445Z","updatedAt":"2026-08-19T00:48:11.827Z","location":{"id":"8a69ab06-60f0-4b10-9ad9-74b6543df3ba","name":"Muskogee","slug":"muskogee-oklahoma","kind":"city","parentLocationId":"5c9ee5c6-ac0d-46a0-9c2f-4bd362bc53d8","region":null,"lat":35.6630196,"lng":-95.3927706,"reviewStatus":"unreviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-18T04:00:41.687Z","updatedAt":"2026-08-18T15:06:02.439Z"},"parties":[{"id":"0d1b6097-0cd2-4799-b17c-fd00e93009cb","dataCenterId":"6db978fa-8c95-4c64-96a1-0a4271e38943","companyId":"9c495c76-08a8-4b58-85d8-45072060a018","externalName":null,"role":"developer","structureNotes":"Site developer and operator","createdAt":"2026-08-19T00:48:15.093Z","company":{"id":"9c495c76-08a8-4b58-85d8-45072060a018","name":"Core Scientific","slug":"core-scientific"}},{"id":"a8457180-75df-43a7-9906-636bb937efbd","dataCenterId":"6db978fa-8c95-4c64-96a1-0a4271e38943","companyId":null,"externalName":"CoreWeave","role":"tenant","structureNotes":"HPC hosting lessee for Nvidia GPU compute","createdAt":"2026-08-19T00:48:16.314Z","company":null},{"id":"da521fdf-d6b7-46e0-b833-d64e8f014692","dataCenterId":"6db978fa-8c95-4c64-96a1-0a4271e38943","companyId":null,"externalName":"Port Muskogee","role":"land_owner","structureNotes":"Industrial park / port authority partner","createdAt":"2026-08-19T00:48:17.458Z","company":null},{"id":"971ff8b6-476c-467e-8417-0e28e6f1ff2f","dataCenterId":"6db978fa-8c95-4c64-96a1-0a4271e38943","companyId":"a9609061-00fd-4d9b-9b2d-ce2d772ab825","externalName":null,"role":"chip_supplier","structureNotes":"GPUs hosted for CoreWeave","createdAt":"2026-08-19T01:32:58.083Z","company":{"id":"a9609061-00fd-4d9b-9b2d-ce2d772ab825","name":"NVIDIA","slug":"nvidia"}}],"capacityClaims":[{"id":"6fde0130-41e7-4fe5-9702-bfd6bab16425","dataCenterId":"6db978fa-8c95-4c64-96a1-0a4271e38943","series":"announced","valueGw":1.5,"asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://blockspace.media/insight/core-scientific-jumps-7-in-morning-markets-as-data-center-firm-announces-440-mw-expansion-at-oklahoma-site/","sourceType":"journalist_report","evidenceTier":"claimed","supersedesId":null,"note":"Plan to scale campus to ~1.5 GW gross (~1.0 GW leasable)","createdAt":"2026-08-19T00:48:13.411Z"},{"id":"af39be87-048d-4d48-8d97-53f77dfd20a3","dataCenterId":"6db978fa-8c95-4c64-96a1-0a4271e38943","series":"under_construction","valueGw":0.07,"asOf":"2024-11-18T00:00:00.000Z","sourceUrl":"https://investors.corescientific.com/news-events/press-releases/detail/99/core-scientific-and-port-muskogee-break-ground-on-100-mw-hpc-data-center","sourceType":"company_filing","evidenceTier":"verified","supersedesId":null,"note":"~70 MW critical IT load for NVIDIA GPUs; 100 MW total (30 MW ancillary). Groundbreaking Nov 2024, operational 2026.","createdAt":"2026-08-19T01:32:55.622Z"},{"id":"17a28dbf-e745-4f26-a973-d5b3a18b290d","dataCenterId":"6db978fa-8c95-4c64-96a1-0a4271e38943","series":"under_construction","valueGw":0.1,"asOf":"2024-06-01T00:00:00.000Z","sourceUrl":"https://www.okcommerce.gov/core-scientific-and-port-muskogee-break-ground-on-100-mw-hpc-data-center/","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"Initial 100 MW HPC data center at groundbreaking","createdAt":"2026-08-19T00:48:12.562Z"}],"financialClaims":[{"id":"c3b7afe9-12f1-4222-ad5e-9a9a9cc46c32","dataCenterId":"6db978fa-8c95-4c64-96a1-0a4271e38943","kind":"capex","label":"CoreWeave HPC hosting contracts with Core Scientific (portfolio, not Muskogee alone)","valueUsd":"8700000000","capUsd":null,"conditions":"~$8.7B potential value over 12-year contracts across six sites; ~590 MW total contracted","asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/coreweave-and-core-scientific-break-ground-on-100mw-data-center-in-muskogee-oklahoma/","sourceType":"journalist_report","evidenceTier":"reported","createdAt":"2026-08-19T00:48:13.944Z"},{"id":"89553fc8-d73a-4b2c-916b-847d77f03a50","dataCenterId":"6db978fa-8c95-4c64-96a1-0a4271e38943","kind":"capex","label":"Total capital investment","valueUsd":"4000000000","capUsd":null,"conditions":"Core Scientific IR: 'more than $4 billion in capital investment'","asOf":"2024-06-01T00:00:00.000Z","sourceUrl":"https://investors.corescientific.com/news-events/press-releases/detail/99/core-scientific-and-port-muskogee-break-ground-on-100-mw-hpc-data-center","sourceType":"company_filing","evidenceTier":"verified","createdAt":"2026-08-19T01:32:56.161Z"}],"metricClaims":[{"id":"2d89930e-5404-489e-9983-71d640b4c226","dataCenterId":"6db978fa-8c95-4c64-96a1-0a4271e38943","metricType":"capex_usd","valueNumeric":8700000000,"valueText":"CoreWeave 500 MW hosting contract valued at $8.7B over 12-year terms (each with two 5-year options); Muskogee is one facility within it","unit":null,"grantingJurisdiction":null,"asOf":"2024-06-01T00:00:00.000Z","sourceUrl":"https://investors.corescientific.com/news-events/press-releases/detail/99/core-scientific-and-port-muskogee-break-ground-on-100-mw-hpc-data-center","sourceType":"company_filing","evidenceTier":"verified","supersedesId":null,"note":null,"createdAt":"2026-08-19T01:32:57.297Z"},{"id":"a9a0bde1-61fe-4c1b-8a17-b46c6c5864d5","dataCenterId":"6db978fa-8c95-4c64-96a1-0a4271e38943","metricType":"jobs_permanent","valueNumeric":150,"valueText":"150 jobs, average salaries exceeding $65,000","unit":null,"grantingJurisdiction":null,"asOf":"2024-06-01T00:00:00.000Z","sourceUrl":"https://investors.corescientific.com/news-events/press-releases/detail/99/core-scientific-and-port-muskogee-break-ground-on-100-mw-hpc-data-center","sourceType":"company_filing","evidenceTier":"verified","supersedesId":null,"note":null,"createdAt":"2026-08-19T01:32:56.919Z"}],"powerProjects":[],"facilities":[],"incidents":[],"events":[{"id":"f5200021-1554-4351-90ef-1190bfcea717","dataCenterId":"6db978fa-8c95-4c64-96a1-0a4271e38943","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"chip_supplier: a9609061-00fd-4d9b-9b2d-ce2d772ab825","occurredAt":"2026-08-19T01:32:58.461Z","createdAt":"2026-08-19T01:32:58.461Z"},{"id":"bf763311-0efd-4ee6-8686-7dae12def2a0","dataCenterId":"6db978fa-8c95-4c64-96a1-0a4271e38943","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: Total capital investment","occurredAt":"2026-08-19T01:32:56.539Z","createdAt":"2026-08-19T01:32:56.539Z"},{"id":"22fab5aa-6440-4b0b-a465-80b14dac3113","dataCenterId":"6db978fa-8c95-4c64-96a1-0a4271e38943","eventType":"capacity_changed","series":"under_construction","oldValue":"0.1","newValue":"0.07","claimId":"af39be87-048d-4d48-8d97-53f77dfd20a3","detail":null,"occurredAt":"2026-08-19T01:32:55.933Z","createdAt":"2026-08-19T01:32:55.933Z"},{"id":"774786a1-befd-4247-b502-027bf0f93946","dataCenterId":"6db978fa-8c95-4c64-96a1-0a4271e38943","eventType":"claim_recorded","series":"under_construction","oldValue":null,"newValue":"0.07","claimId":"af39be87-048d-4d48-8d97-53f77dfd20a3","detail":"verified · company_filing","occurredAt":"2026-08-19T01:32:55.780Z","createdAt":"2026-08-19T01:32:55.780Z"},{"id":"7c1fe8e6-7196-4749-9693-9807d062b319","dataCenterId":"6db978fa-8c95-4c64-96a1-0a4271e38943","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"land_owner: Port Muskogee","occurredAt":"2026-08-19T00:48:17.841Z","createdAt":"2026-08-19T00:48:17.841Z"},{"id":"f0792c28-e99e-4036-945e-397150634da0","dataCenterId":"6db978fa-8c95-4c64-96a1-0a4271e38943","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"tenant: CoreWeave","occurredAt":"2026-08-19T00:48:16.691Z","createdAt":"2026-08-19T00:48:16.691Z"},{"id":"ea079705-96b3-4581-8e19-9c96fcd136cd","dataCenterId":"6db978fa-8c95-4c64-96a1-0a4271e38943","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: 9c495c76-08a8-4b58-85d8-45072060a018","occurredAt":"2026-08-19T00:48:15.475Z","createdAt":"2026-08-19T00:48:15.475Z"},{"id":"57c807e3-73ef-4cc4-87f5-5d4e7f4d171b","dataCenterId":"6db978fa-8c95-4c64-96a1-0a4271e38943","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: CoreWeave HPC hosting contracts with Core Scientific (portfolio, not Muskogee alone)","occurredAt":"2026-08-19T00:48:14.326Z","createdAt":"2026-08-19T00:48:14.326Z"},{"id":"6530a0b8-f9ea-43aa-8edb-e8801ed74130","dataCenterId":"6db978fa-8c95-4c64-96a1-0a4271e38943","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"1.5","claimId":"6fde0130-41e7-4fe5-9702-bfd6bab16425","detail":null,"occurredAt":"2026-08-19T00:48:13.716Z","createdAt":"2026-08-19T00:48:13.716Z"},{"id":"bb0240ea-94a8-422a-9c03-1cf56a8bbc18","dataCenterId":"6db978fa-8c95-4c64-96a1-0a4271e38943","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"1.5","claimId":"6fde0130-41e7-4fe5-9702-bfd6bab16425","detail":"claimed · journalist_report","occurredAt":"2026-08-19T00:48:13.565Z","createdAt":"2026-08-19T00:48:13.565Z"},{"id":"b873f551-1b34-4e47-846b-091e170a1487","dataCenterId":"6db978fa-8c95-4c64-96a1-0a4271e38943","eventType":"capacity_changed","series":"under_construction","oldValue":null,"newValue":"0.1","claimId":"17a28dbf-e745-4f26-a973-d5b3a18b290d","detail":null,"occurredAt":"2026-08-19T00:48:12.871Z","createdAt":"2026-08-19T00:48:12.871Z"},{"id":"e1e4332a-ddb5-46b3-b037-176e5823981b","dataCenterId":"6db978fa-8c95-4c64-96a1-0a4271e38943","eventType":"claim_recorded","series":"under_construction","oldValue":null,"newValue":"0.1","claimId":"17a28dbf-e745-4f26-a973-d5b3a18b290d","detail":"reported · press_release","occurredAt":"2026-08-19T00:48:12.716Z","createdAt":"2026-08-19T00:48:12.716Z"}],"capacity_picture":{"announced_gw":1.5,"contracted_gw":null,"under_construction_gw":0.07,"energized_gw":null,"announced_minus_energized_gw":1.5,"by_series":{"announced":{"valueGw":1.5,"asOf":"2025-06-01T00:00:00.000Z","evidenceTier":"claimed","sourceUrl":"https://blockspace.media/insight/core-scientific-jumps-7-in-morning-markets-as-data-center-firm-announces-440-mw-expansion-at-oklahoma-site/"},"contracted":null,"under_construction":{"valueGw":0.07,"asOf":"2024-11-18T00:00:00.000Z","evidenceTier":"verified","sourceUrl":"https://investors.corescientific.com/news-events/press-releases/detail/99/core-scientific-and-port-muskogee-break-ground-on-100-mw-hpc-data-center"},"energized":null}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Core Scientific / CoreWeave Muskogee HPC Campus","url":"https://registry.deploy.report/datacenters/coreweave-core-scientific-muskogee-oklahoma","address":{"@type":"PostalAddress","addressLocality":"Muskogee"}}}