{"id":"405e9627-7a7b-4bf2-8ae1-275248cdb27e","slug":"crusoe-childress-texas","name":"Crusoe Childress Campus","aliases":[],"locationId":"81180bd0-68b8-42ee-a428-8210b3182a82","lat":34.4265,"lng":-100.2038,"locationPrecision":"city","landStatus":"private","lifecycleState":"announced","powerSourceMix":"solar_storage","interconnectionQueueStatus":"Grid connected, on land the power partner owns: the 270 acre campus belongs to Lancium, which secures the power interconnect and runs energy orchestration, while Crusoe designs, builds and operates the data center. Behind-the-meter solar and storage sit alongside the grid supply. The announcement does not state the interconnect's approval status.","interconnectionQueueId":null,"expectedEnergizationDate":null,"expectedEnergizationPrecision":null,"expectedEnergizationMilestone":null,"dedicatedSubstation":null,"gridOperator":"ERCOT","waterSourceNotes":"Closed-loop, non-evaporative liquid cooling to reduce water use.","servingUtility":null,"acreage":270,"totalBuildingSqft":null,"streetAddress":null,"notes":"Crusoe and Lancium announced (July 2026) a 1.4 GW AI data center campus in Childress, Texas on a 270-acre Lancium-owned site, mirroring their Abilene model: Crusoe develops/operates the data centers and Lancium manages behind-the-meter energy. Powered by behind-the-meter solar and storage with a 1 GW ERCOT-approved interconnect; closed-loop cooling. Construction expected to begin Q3 2026; no capacity energized yet.","keyFacts":[{"label":"Partners","value":"Crusoe builds and operates; Lancium owns the land, interconnect and energy infrastructure"},{"label":"Capacity (company-claimed)","value":"1.0 GW grid-connected AI campus on 270 acres in Childress, TX, for an undisclosed hyperscaler"},{"label":"Construction start (targeted)","value":"Q3 2026"},{"label":"Cooling (company-claimed)","value":"Closed-loop, non-evaporative liquid cooling, plus energy storage"},{"label":"Jobs (company-claimed)","value":"Thousands of construction jobs; 100+ long-term positions"}],"reviewStatus":"reviewed","sources":[{"url":"https://www.datacenterdynamics.com/en/news/crusoe-to-develop-14gw-data-center-campus-in-childress-texas/","title":"Crusoe to develop 1.4GW data center campus in Childress, Texas","sourceName":"DataCenterDynamics"},{"url":"https://www.crusoe.ai/resources/newsroom/crusoe-and-lancium-announce-1-gigawatt-ai-data-center-campus-in-childress-texas","title":"Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas","sourceName":"Crusoe"},{"url":"https://lancium.com/2026/07/15/crusoe-and-lancium-announce-1-0-gigawatt-ai-data-center-campus-in-childress-texas/","title":"Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas","sourceName":"Lancium"}],"reviewNote":null,"createdAt":"2026-08-17T18:12:30.228Z","updatedAt":"2026-10-12T23:55:24.809Z","location":{"id":"81180bd0-68b8-42ee-a428-8210b3182a82","name":"Childress","slug":"childress-texas","kind":"city","parentLocationId":"45f67762-10f4-4255-be84-45c73efe25f9","region":"Texas","lat":34.4265,"lng":-100.2038,"reviewStatus":"reviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-17T18:12:29.850Z","updatedAt":"2026-08-21T18:01:25.719Z"},"parties":[{"id":"76c3aa75-b5c7-4121-947a-f63914e0e14c","dataCenterId":"405e9627-7a7b-4bf2-8ae1-275248cdb27e","companyId":"f9f75eb1-d7f4-44e5-9ecb-e6c69bd327b1","externalName":"Crusoe Energy","role":"developer","structureNotes":"Develops and operates the data center campus.","createdAt":"2026-08-17T18:12:31.839Z","company":{"id":"f9f75eb1-d7f4-44e5-9ecb-e6c69bd327b1","name":"Crusoe","slug":"crusoe"}},{"id":"16657dac-ba4e-4aed-baf8-0421e9703d74","dataCenterId":"405e9627-7a7b-4bf2-8ae1-275248cdb27e","companyId":null,"externalName":"Lancium","role":"utility","structureNotes":"Owns the 270-acre site and develops/manages behind-the-meter energy infrastructure.","createdAt":"2026-08-17T18:12:32.662Z","company":null},{"id":"a29555b5-5e35-41fc-8133-d12f94f0f88b","dataCenterId":"405e9627-7a7b-4bf2-8ae1-275248cdb27e","companyId":null,"externalName":"ERCOT","role":"grid_operator","structureNotes":"1 GW interconnect fully approved by ERCOT.","createdAt":"2026-08-17T18:12:33.424Z","company":null}],"capacityClaims":[{"id":"b7434d0b-d7e0-45a1-b060-819c587b4038","dataCenterId":"405e9627-7a7b-4bf2-8ae1-275248cdb27e","series":"announced","valueGw":1.4,"asOf":"2026-07-15T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/crusoe-to-develop-14gw-data-center-campus-in-childress-texas/","sourceType":"journalist_report","evidenceTier":"claimed","supersedesId":null,"note":"DataCenterDynamics reports 1.4 GW; Crusoe/Lancium press release frames the initial announcement as 1.0 GW. 270-acre site.","createdAt":"2026-08-17T18:12:30.909Z"},{"id":"13afa868-ef26-40ce-bf48-30a59337d2bd","dataCenterId":"405e9627-7a7b-4bf2-8ae1-275248cdb27e","series":"announced","valueGw":1,"asOf":"2026-07-01T00:00:00.000Z","sourceUrl":"https://www.crusoe.ai/resources/newsroom/crusoe-and-lancium-announce-1-gigawatt-ai-data-center-campus-in-childress-texas","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"1.0 GW grid-connected per the July 15 2026 Crusoe/Lancium announcement (DCD headlines up to 1.4 GW); purpose-built for an unnamed leading hyperscaler.","createdAt":"2026-08-19T01:33:42.313Z"},{"id":"14e4a312-7062-47fe-9c52-90fca4c83f1a","dataCenterId":"405e9627-7a7b-4bf2-8ae1-275248cdb27e","series":"energized","valueGw":0,"asOf":"2026-07-15T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/crusoe-to-develop-14gw-data-center-campus-in-childress-texas/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Crusoe/Lancium 1.0-1.4 GW campus announced July 15 2026, construction expected Q3 2026 on Lancium's 270-acre site. Nothing built or energized; no operational IT load.","createdAt":"2026-08-17T18:33:35.174Z"}],"financialClaims":[],"metricClaims":[{"id":"34fda771-31f7-47eb-9ff6-667423ea8fc7","dataCenterId":"405e9627-7a7b-4bf2-8ae1-275248cdb27e","metricType":"cooling_type","valueNumeric":null,"valueText":"Closed-loop, non-evaporative liquid cooling","unit":null,"grantingJurisdiction":null,"asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://www.crusoe.ai/resources/newsroom/crusoe-and-lancium-announce-1-gigawatt-ai-data-center-campus-in-childress-texas","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":null,"createdAt":"2026-08-19T01:33:44.395Z"},{"id":"0edcc500-d468-4226-9348-e7ae3523b890","dataCenterId":"405e9627-7a7b-4bf2-8ae1-275248cdb27e","metricType":"jobs_construction","valueNumeric":null,"valueText":"Thousands of local construction jobs","unit":null,"grantingJurisdiction":null,"asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://www.globenewswire.com/news-release/2026/07/15/3327869/0/en/crusoe-and-lancium-announce-1-0-gigawatt-ai-data-center-campus-in-childress-texas.html","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":null,"createdAt":"2026-08-19T01:33:44.009Z"},{"id":"57a23ea9-ccde-48ca-b666-13abdffb2d84","dataCenterId":"405e9627-7a7b-4bf2-8ae1-275248cdb27e","metricType":"jobs_permanent","valueNumeric":100,"valueText":"More than 100 long-term positions","unit":null,"grantingJurisdiction":null,"asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://www.globenewswire.com/news-release/2026/07/15/3327869/0/en/crusoe-and-lancium-announce-1-0-gigawatt-ai-data-center-campus-in-childress-texas.html","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":null,"createdAt":"2026-08-19T01:33:43.615Z"}],"powerProjects":[{"id":"25a57dcd-8804-4dad-9b51-f4bd6955bdc6","dataCenterId":"405e9627-7a7b-4bf2-8ae1-275248cdb27e","name":"Behind-the-meter solar + battery storage (Lancium)","type":"solar_storage","capacityGw":null,"lifecycleState":"announced","sourceUrl":"https://www.crusoe.ai/resources/newsroom/crusoe-and-lancium-announce-1-gigawatt-ai-data-center-campus-in-childress-texas","evidenceTier":"claimed","note":"Lancium develops/manages behind-the-meter solar and storage; specific generation capacity not disclosed. 1 GW ERCOT-approved grid interconnect.","createdAt":"2026-08-17T18:12:31.449Z"},{"id":"0bee71d3-2ae3-45e5-b3b7-553d4839fd77","dataCenterId":"405e9627-7a7b-4bf2-8ae1-275248cdb27e","name":"Behind-the-meter solar","type":"solar","capacityGw":null,"lifecycleState":"announced","sourceUrl":"https://www.globenewswire.com/news-release/2026/07/15/3327869/0/en/crusoe-and-lancium-announce-1-0-gigawatt-ai-data-center-campus-in-childress-texas.html","evidenceTier":"reported","note":"On-site solar resource developed and managed by Lancium; capacity not disclosed.","createdAt":"2026-08-19T01:33:42.856Z"},{"id":"d01e9584-eef5-4fb5-b6c3-ec4a5acbfdad","dataCenterId":"405e9627-7a7b-4bf2-8ae1-275248cdb27e","name":"On-site energy storage","type":"storage","capacityGw":null,"lifecycleState":"announced","sourceUrl":"https://www.globenewswire.com/news-release/2026/07/15/3327869/0/en/crusoe-and-lancium-announce-1-0-gigawatt-ai-data-center-campus-in-childress-texas.html","evidenceTier":"reported","note":"Behind-the-meter energy storage for grid reliability; capacity not disclosed.","createdAt":"2026-08-19T01:33:43.239Z"}],"permits":[{"id":"94efc602-7c53-4dac-ba54-3fd007574265","dataCenterId":"405e9627-7a7b-4bf2-8ae1-275248cdb27e","agency":"TCEQ","jurisdiction":"Texas","kind":"stormwater","permitType":"Construction stormwater authorization","number":"TXR1504YB","applicant":"M A Mortenson Company","status":"active","filedDate":null,"decidedDate":null,"docket":null,"regulatedEntityId":"RN112437124","sourceUrl":"https://www15.tceq.texas.gov/crpub/index.cfm?fuseaction=regent.validateRE&re_ref_num_txt=RN112437124&re_name_txt=&pgm_area=&addn_num_txt=&addn_id_status_cd=&deliv_txt=&city_name=&zip_cd=&cnty_name=","reviewStatus":"reviewed","reviewNote":"Campus link confirmed 2026-11-18: TCEQ describes this LANCIUM CHILDRESS site as about 10 miles southeast of Childress, bounded by County Road 22 and County Road BB, which matches Lancium's Clean Campus where Crusoe is building. Mortenson filed it for the site's power line and electrical work. https://baxtel.com/data-center/lancium-childress-campus \"County Road 23 & County Road BB ... Lancium owns the land and the electrical infrastructure at its Clean Campus in southeast Childress County, Texas.\"","lastCheckedAt":"2026-11-17T21:27:16.770Z","createdAt":"2026-11-17T21:13:50.114Z","updatedAt":"2026-11-18T18:51:12.795Z"},{"id":"004b94bc-04ad-4f08-9d36-468f82c419ba","dataCenterId":"405e9627-7a7b-4bf2-8ae1-275248cdb27e","agency":"TCEQ","jurisdiction":"Texas","kind":"stormwater","permitType":"Construction stormwater authorization","number":"TXR1569YD","applicant":"M A Mortenson Company","status":"cancelled","filedDate":null,"decidedDate":null,"docket":null,"regulatedEntityId":"RN112443510","sourceUrl":"https://www15.tceq.texas.gov/crpub/index.cfm?fuseaction=regent.validateRE&re_ref_num_txt=RN112443510&re_name_txt=&pgm_area=&addn_num_txt=&addn_id_status_cd=&deliv_txt=&city_name=&zip_cd=&cnty_name=","reviewStatus":"reviewed","reviewNote":"Campus link confirmed 2026-11-18: TCEQ names this site LANCIUM CHILDRESS BORROW PIT, operated by the same contractor as the Lancium Childress campus permit and bordered by the Lancium transmission line right-of-way. It is an off-site borrow pit for the campus build, and the authorization is cancelled. https://baxtel.com/campus/lancium-childress-clean-campus \"Lancium's Clean Campus in southeast Childress County, Texas, covers a reinvestment zone of about 3,720 acres south of US 287, about nine miles from Childress. Lancium owns the land and the electrical infrastructure, and data center operators build on it. Crusoe is building the first three buildings, known as Project Hyper, on about 270 acres along County Road 23\"","lastCheckedAt":"2026-11-17T21:27:16.770Z","createdAt":"2026-11-17T21:13:50.534Z","updatedAt":"2026-11-18T18:51:13.172Z"},{"id":"ea1f76dc-a560-4862-9918-b9ac6a8a1a35","dataCenterId":"405e9627-7a7b-4bf2-8ae1-275248cdb27e","agency":"TCEQ","jurisdiction":"Texas","kind":"wastewater","permitType":"Wastewater general permit","number":"WQG100077","applicant":"Lancium Childress LLC","status":"active","filedDate":null,"decidedDate":null,"docket":null,"regulatedEntityId":"RN112510391","sourceUrl":"https://www15.tceq.texas.gov/crpub/index.cfm?fuseaction=regent.validateRE&re_ref_num_txt=RN112510391&re_name_txt=&pgm_area=&addn_num_txt=&addn_id_status_cd=&deliv_txt=&city_name=&zip_cd=&cnty_name=","reviewStatus":"reviewed","reviewNote":"Campus link confirmed 2026-11-18: TCEQ lists this permit at LANCIUM CHILDRESS CLEAN CAMPUS (564 CR 22, Childress), owned by Lancium Childress LLC, and Crusoe's Childress campus is built on Lancium's Childress Clean Campus land. https://baxtel.com/campus/lancium-childress-clean-campus \"Lancium's Clean Campus in southeast Childress County, Texas, covers a reinvestment zone of about 3,720 acres south of US 287, about nine miles from Childress. Lancium owns the land and the electrical infrastructure, and data center operators build on it. Crusoe is building the first three buildings, known as Project Hyper, on about 270 acres along County Road 23\"","lastCheckedAt":"2026-11-17T21:27:16.770Z","createdAt":"2026-11-17T21:13:51.041Z","updatedAt":"2026-11-18T18:51:12.415Z"}],"facilities":[{"slug":"crusoe-childress-tx","name":"Crusoe Childress AI Data Center Campus","status":"planned","criticalItMw":null,"facilityType":"hyperscale"},{"slug":"crusoe-childress-tx-campus","name":"Crusoe Childress Campus","status":"planned","criticalItMw":1000,"facilityType":"hyperscale"}],"incidents":[],"events":[{"id":"6f55c7e6-eb7c-4a4b-afe3-ebfb145bda1d","dataCenterId":"405e9627-7a7b-4bf2-8ae1-275248cdb27e","eventType":"permit_status_changed","series":null,"oldValue":"unknown","newValue":"cancelled","claimId":null,"detail":"TCEQ TXR1569YD: unknown to cancelled (Central Registry, 2026-11-17)","occurredAt":"2026-11-17T21:27:18.420Z","createdAt":"2026-11-17T21:27:18.420Z"},{"id":"5a7315d8-b33c-494b-a4d9-a69f6f2e235e","dataCenterId":"405e9627-7a7b-4bf2-8ae1-275248cdb27e","eventType":"permit_recorded","series":null,"oldValue":null,"newValue":"TCEQ WQG100077: active","claimId":null,"detail":"Wastewater general permit WQG100077 recorded from https://www15.tceq.texas.gov/crpub/index.cfm?fuseaction=regent.validateRE&re_ref_num_txt=RN112510391&re_name_txt=&pgm_area=&addn_num_txt=&addn_id_status_cd=&deliv_txt=&city_name=&zip_cd=&cnty_name=","occurredAt":"2026-11-17T21:13:51.329Z","createdAt":"2026-11-17T21:13:51.329Z"},{"id":"8d3fd5e4-ff80-4798-8350-2a16b97b91b8","dataCenterId":"405e9627-7a7b-4bf2-8ae1-275248cdb27e","eventType":"permit_recorded","series":null,"oldValue":null,"newValue":"TCEQ TXR1569YD: unknown","claimId":null,"detail":"Construction stormwater authorization TXR1569YD recorded from https://www15.tceq.texas.gov/crpub/index.cfm?fuseaction=regent.validateRE&re_ref_num_txt=RN112443510&re_name_txt=&pgm_area=&addn_num_txt=&addn_id_status_cd=&deliv_txt=&city_name=&zip_cd=&cnty_name=","occurredAt":"2026-11-17T21:13:50.798Z","createdAt":"2026-11-17T21:13:50.798Z"},{"id":"e5c77582-49b9-4df7-a71e-8880357ee43c","dataCenterId":"405e9627-7a7b-4bf2-8ae1-275248cdb27e","eventType":"permit_recorded","series":null,"oldValue":null,"newValue":"TCEQ TXR1504YB: active","claimId":null,"detail":"Construction stormwater authorization TXR1504YB recorded from https://www15.tceq.texas.gov/crpub/index.cfm?fuseaction=regent.validateRE&re_ref_num_txt=RN112437124&re_name_txt=&pgm_area=&addn_num_txt=&addn_id_status_cd=&deliv_txt=&city_name=&zip_cd=&cnty_name=","occurredAt":"2026-11-17T21:13:50.375Z","createdAt":"2026-11-17T21:13:50.375Z"},{"id":"1702cc00-ce6e-46eb-abe8-75da49abacbc","dataCenterId":"405e9627-7a7b-4bf2-8ae1-275248cdb27e","eventType":"capacity_changed","series":"announced","oldValue":"1.4","newValue":"1","claimId":"13afa868-ef26-40ce-bf48-30a59337d2bd","detail":null,"occurredAt":"2026-08-19T01:33:42.623Z","createdAt":"2026-08-19T01:33:42.623Z"},{"id":"4aec04ad-34a1-4821-b7ec-bf2bac22e556","dataCenterId":"405e9627-7a7b-4bf2-8ae1-275248cdb27e","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"1","claimId":"13afa868-ef26-40ce-bf48-30a59337d2bd","detail":"reported · press_release","occurredAt":"2026-08-19T01:33:42.464Z","createdAt":"2026-08-19T01:33:42.464Z"},{"id":"64de0408-f639-4015-b933-c28eeb81538a","dataCenterId":"405e9627-7a7b-4bf2-8ae1-275248cdb27e","eventType":"capacity_changed","series":"energized","oldValue":null,"newValue":"0","claimId":"14e4a312-7062-47fe-9c52-90fca4c83f1a","detail":null,"occurredAt":"2026-08-17T18:33:35.476Z","createdAt":"2026-08-17T18:33:35.476Z"},{"id":"e3f01d5b-a6cf-4a2f-848d-94c386b02b86","dataCenterId":"405e9627-7a7b-4bf2-8ae1-275248cdb27e","eventType":"claim_recorded","series":"energized","oldValue":null,"newValue":"0","claimId":"14e4a312-7062-47fe-9c52-90fca4c83f1a","detail":"reported · journalist_report","occurredAt":"2026-08-17T18:33:35.328Z","createdAt":"2026-08-17T18:33:35.328Z"},{"id":"cb2ccb24-1986-4845-a34f-68c5543b3ee0","dataCenterId":"405e9627-7a7b-4bf2-8ae1-275248cdb27e","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"grid_operator: ERCOT","occurredAt":"2026-08-17T18:12:33.804Z","createdAt":"2026-08-17T18:12:33.804Z"},{"id":"d1797d57-cef3-403d-9c9e-6ff69bf50d31","dataCenterId":"405e9627-7a7b-4bf2-8ae1-275248cdb27e","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: Lancium","occurredAt":"2026-08-17T18:12:33.036Z","createdAt":"2026-08-17T18:12:33.036Z"},{"id":"b51c3441-8a13-4b65-be40-0b95898553fe","dataCenterId":"405e9627-7a7b-4bf2-8ae1-275248cdb27e","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: Crusoe Energy","occurredAt":"2026-08-17T18:12:32.279Z","createdAt":"2026-08-17T18:12:32.279Z"},{"id":"40b63982-fd65-4344-ab9f-f16547a82f0b","dataCenterId":"405e9627-7a7b-4bf2-8ae1-275248cdb27e","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"1.4","claimId":"b7434d0b-d7e0-45a1-b060-819c587b4038","detail":null,"occurredAt":"2026-08-17T18:12:31.215Z","createdAt":"2026-08-17T18:12:31.215Z"},{"id":"dee5e0f5-c7ef-4b1d-ab72-0622c32c9821","dataCenterId":"405e9627-7a7b-4bf2-8ae1-275248cdb27e","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"1.4","claimId":"b7434d0b-d7e0-45a1-b060-819c587b4038","detail":"claimed · journalist_report","occurredAt":"2026-08-17T18:12:31.062Z","createdAt":"2026-08-17T18:12:31.062Z"}],"capacity_picture":{"announced_gw":1,"contracted_gw":null,"under_construction_gw":null,"energized_gw":0,"announced_minus_energized_gw":1,"by_series":{"announced":{"valueGw":1,"asOf":"2026-07-01T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://www.crusoe.ai/resources/newsroom/crusoe-and-lancium-announce-1-gigawatt-ai-data-center-campus-in-childress-texas"},"contracted":null,"under_construction":null,"energized":{"valueGw":0,"asOf":"2026-07-15T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://www.datacenterdynamics.com/en/news/crusoe-to-develop-14gw-data-center-campus-in-childress-texas/"}}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Crusoe Childress Campus","url":"https://registry.deploy.report/datacenters/crusoe-childress-texas","geo":{"@type":"GeoCoordinates","latitude":34.4265,"longitude":-100.2038},"address":{"@type":"PostalAddress","addressLocality":"Childress"}}}