{"id":"0402b2da-aad8-4d33-a8dd-6d531b7a407a","slug":"cyrusone-dfw10-whitney-thad-hill-bosque-texas","name":"CyrusOne DFW10 Whitney / Thad Hill Powered Land","aliases":["Thad Hill Energy Center powered land","CyrusOne DFW10-Whitney","DFW17"],"locationId":"d21d777b-6958-4055-a9a9-3c75a3933835","lat":null,"lng":null,"locationPrecision":null,"landStatus":"greenfield","lifecycleState":"under_construction","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"ERCOT","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"CyrusOne is building a hyperscale campus (DFW10/DFW17 buildings) on 'powered land' adjacent to Calpine's ~250 MW Thad Hill Energy Center in Bosque County near Whitney; a 190 MW Phase-1 power agreement expanded toward a ~400 MW commitment. Backed by GIP/BlackRock and KKR; end tenant not disclosed. Phase 1 targeted Q4 2026.","keyFacts":[{"label":"190 MW Phase 1 Powered Land / Q4 2026 target (primary)","value":"On Jul 30, 2025, Calpine and CyrusOne announced a 190 MW agreement for a new data center adjacent to Calpine's Thad Hill Energy Center in Bosque County, Texas (campus named DFW10), securing power, grid connection, and land. The release says the facility was under construction and expected operational by Q4 2026, with first-phase footprint more than 190,000 sq ft and the project framed as a $1.2 billion infrastructure investment. CyrusOne is described as backed by GIP (part of BlackRock) and KKR ([Calpine, Jul 30 2025](https://www.calpine.com/calpine-and-cyrusone-announce-thad-hill-energy-center-powered-land-to-support-hyperscale-data-center-development-in-texas/))","sourceUrl":"https://www.calpine.com/calpine-and-cyrusone-announce-thad-hill-energy-center-powered-land-to-support-hyperscale-data-center-development-in-texas/"},{"label":"Calpine PLC / up to 400 MW Bosque capability (primary)","value":"The July 2025 Calpine release states Calpine's ~9,000 MW ERCOT generation and wholesale/retail platform would be capable of delivering up to 400 MW to data centers located in Bosque, Texas, under its Powered Land Capabilities suite, and positions the deal as supporting ERCOT grid-emergency response capability at the CyrusOne campus ([Calpine, Jul 30 2025](https://www.calpine.com/calpine-and-cyrusone-announce-thad-hill-energy-center-powered-land-to-support-hyperscale-data-center-development-in-texas/))","sourceUrl":"https://www.calpine.com/calpine-and-cyrusone-announce-thad-hill-energy-center-powered-land-to-support-hyperscale-data-center-development-in-texas/"},{"label":"Phase 2 adds 210 MW to 400 MW total (primary)","value":"On Nov 3, 2025, CyrusOne and Calpine announced Phase 2 of the powered-land agreement, adding 210 MW to the original 190 MW for a completed 400 MW power, grid-connection, and land package serving the Thad Hill-adjacent CyrusOne facility still targeted for Q4 2026 energization. Quotes emphasize coordinated operations to curtail in scarcity periods for ERCOT reliability ([CyrusOne, Nov 3 2025](https://www.cyrusone.com/resources/press-releases/calpine-and-cyrusone-announce-phase-2-of-powered-land-agreement-to-support-hyperscale-data-center-at-thad-hill-energy-center-in-texas))","sourceUrl":"https://www.cyrusone.com/resources/press-releases/calpine-and-cyrusone-announce-phase-2-of-powered-land-agreement-to-support-hyperscale-data-center-at-thad-hill-energy-center-in-texas"}],"reviewStatus":"reviewed","sources":[{"url":"https://www.power-eng.com/gas/calpine-lands-190-mw-agreement-for-new-hyperscale-data-center-in-texas/","date":"2025-07-30","title":"Calpine lands 190-MW agreement for new hyperscale data center in Texas","publisher":"Power Engineering"},{"url":"https://www.datacenterdynamics.com/en/news/cyrusone-files-to-expand-data-center-campus-outside-waco-texas/","date":"2025-12-09","title":"CyrusOne files to expand data center campus outside Waco, Texas","publisher":"DCD"},{"url":"https://www.calpine.com/calpine-and-cyrusone-announce-thad-hill-energy-center-powered-land-to-support-hyperscale-data-center-development-in-texas/","date":"2025-07-30","title":"Calpine and CyrusOne Announce Thad Hill Energy Center Powered Land to Support Hyperscale Data Center Development in Texas","publisher":"Calpine"},{"url":"https://www.cyrusone.com/resources/press-releases/calpine-and-cyrusone-announce-phase-2-of-powered-land-agreement-to-support-hyperscale-data-center-at-thad-hill-energy-center-in-texas","date":"2025-11-03","title":"Calpine and CyrusOne Announce Phase 2 of Powered Land Agreement to Support Hyperscale Data Center at Thad Hill Energy Center in Texas","publisher":"CyrusOne"}],"reviewNote":null,"createdAt":"2026-08-17T20:23:59.192Z","updatedAt":"2026-09-29T04:42:49.437Z","location":{"id":"d21d777b-6958-4055-a9a9-3c75a3933835","name":"Whitney","slug":"whitney-texas","kind":"city","parentLocationId":"45f67762-10f4-4255-be84-45c73efe25f9","region":"Texas","lat":31.951823,"lng":-97.3214012,"reviewStatus":"reviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-17T20:23:58.813Z","updatedAt":"2026-08-21T03:20:12.226Z"},"parties":[{"id":"3e65fc44-338b-4232-abdd-ee408670c58b","dataCenterId":"0402b2da-aad8-4d33-a8dd-6d531b7a407a","companyId":"b6e60bc1-3226-4272-be7b-9d742dd34c46","externalName":"CyrusOne","role":"developer","structureNotes":"Backed by GIP/BlackRock and KKR","createdAt":"2026-08-17T20:24:01.702Z","company":{"id":"b6e60bc1-3226-4272-be7b-9d742dd34c46","name":"CyrusOne","slug":"cyrusone"}},{"id":"076c9af2-7e8b-46ea-ba0f-101ca7463f84","dataCenterId":"0402b2da-aad8-4d33-a8dd-6d531b7a407a","companyId":null,"externalName":"Calpine","role":"utility","structureNotes":"Owns Thad Hill Energy Center; power + land agreement","createdAt":"2026-08-17T20:24:02.462Z","company":null},{"id":"519c58d5-9fc3-47d4-87ce-558f16cdba54","dataCenterId":"0402b2da-aad8-4d33-a8dd-6d531b7a407a","companyId":null,"externalName":"Global Infrastructure Partners (BlackRock)","role":"financier","structureNotes":"CyrusOne owner","createdAt":"2026-08-19T00:29:37.808Z","company":null},{"id":"82e25393-d609-47ed-a219-a1abfbfd535d","dataCenterId":"0402b2da-aad8-4d33-a8dd-6d531b7a407a","companyId":null,"externalName":"KKR","role":"financier","structureNotes":"CyrusOne owner","createdAt":"2026-08-19T00:29:38.990Z","company":null},{"id":"cc3e63d9-bcfa-4419-8a27-022266166178","dataCenterId":"0402b2da-aad8-4d33-a8dd-6d531b7a407a","companyId":null,"externalName":"ERCOT","role":"grid_operator","structureNotes":"Thad Hill Energy Center serves ERCOT; firm grid connection provided","createdAt":"2026-08-19T00:29:40.130Z","company":null}],"capacityClaims":[{"id":"47a3398a-663e-4340-ae75-f27df4182925","dataCenterId":"0402b2da-aad8-4d33-a8dd-6d531b7a407a","series":"announced","valueGw":0.4,"asOf":"2025-12-09T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/cyrusone-files-to-expand-data-center-campus-outside-waco-texas/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"~400 MW total power agreement reported","createdAt":"2026-08-17T20:24:00.791Z"},{"id":"3fc159df-85c7-4d3b-a7f0-266b1d1a7d5a","dataCenterId":"0402b2da-aad8-4d33-a8dd-6d531b7a407a","series":"announced","valueGw":0.19,"asOf":"2025-07-30T00:00:00.000Z","sourceUrl":"https://www.calpine.com/calpine-and-cyrusone-announce-thad-hill-energy-center-powered-land-to-support-hyperscale-data-center-development-in-texas/","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"Phase 1: 190 MW power supply, >190,000 sq ft, DFW10 building.","createdAt":"2026-08-19T00:29:35.063Z"},{"id":"308de30d-969c-4b47-a591-f0f02ee9eb67","dataCenterId":"0402b2da-aad8-4d33-a8dd-6d531b7a407a","series":"contracted","valueGw":0.4,"asOf":"2025-11-03T00:00:00.000Z","sourceUrl":"https://www.prnewswire.com/news-releases/calpine-and-cyrusone-announce-phase-2-of-powered-land-agreement-to-support-hyperscale-data-center-at-thad-hill-energy-center-in-texas-302602881.html","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"Total 400 MW Calpine powered-land agreement: 190 MW Phase 1 (Jul 2025) plus 210 MW added in Phase 2 (Nov 2025), from the adjacent Thad Hill Energy Center.","createdAt":"2026-08-19T00:29:34.229Z"},{"id":"ed5d3b6b-9003-4131-96a0-30a7bd9e5ed2","dataCenterId":"0402b2da-aad8-4d33-a8dd-6d531b7a407a","series":"contracted","valueGw":0.19,"asOf":"2025-07-30T00:00:00.000Z","sourceUrl":"https://www.power-eng.com/gas/calpine-lands-190-mw-agreement-for-new-hyperscale-data-center-in-texas/","sourceType":"utility_filing","evidenceTier":"reported","supersedesId":null,"note":"Phase-1 power agreement 190 MW","createdAt":"2026-08-17T20:23:59.952Z"},{"id":"71317657-d530-4d37-90ce-230e90400906","dataCenterId":"0402b2da-aad8-4d33-a8dd-6d531b7a407a","series":"under_construction","valueGw":0.144,"asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://hoodline.com/2025/12/tiny-whitney-braces-as-cyrusone-drops-400-megawatt-data-center-bombshell/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Initial IT load ~144 MW across >700,000 sq ft build-out; campus could ultimately reach ~400 MW. Operational expected Q4 2026.","createdAt":"2026-08-19T00:29:35.751Z"}],"financialClaims":[{"id":"035fd11a-90e4-4e71-8fb4-dbe363c98c81","dataCenterId":"0402b2da-aad8-4d33-a8dd-6d531b7a407a","kind":"capex","label":"DFW10 campus investment","valueUsd":"1200000000","capUsd":null,"conditions":null,"asOf":"2025-07-30T00:00:00.000Z","sourceUrl":"https://www.calpine.com/calpine-and-cyrusone-announce-thad-hill-energy-center-powered-land-to-support-hyperscale-data-center-development-in-texas/","sourceType":"press_release","evidenceTier":"reported","createdAt":"2026-08-19T00:29:36.275Z"}],"metricClaims":[{"id":"70ea8d37-3462-4971-babe-bb690ce5ce71","dataCenterId":"0402b2da-aad8-4d33-a8dd-6d531b7a407a","metricType":"capex_usd","valueNumeric":1200000000,"valueText":"$1.2 billion infrastructure investment","unit":null,"grantingJurisdiction":null,"asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://www.calpine.com/calpine-and-cyrusone-announce-thad-hill-energy-center-powered-land-to-support-hyperscale-data-center-development-in-texas/","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":null,"createdAt":"2026-08-19T00:29:37.052Z"}],"powerProjects":[{"id":"e9fcd180-a3aa-4d12-a59d-cdf6cf1301e1","dataCenterId":"0402b2da-aad8-4d33-a8dd-6d531b7a407a","name":"Thad Hill Energy Center","type":"gas","capacityGw":0.25,"lifecycleState":"energized","sourceUrl":"https://www.calpine.com/calpine-and-cyrusone-announce-thad-hill-energy-center-powered-land-to-support-hyperscale-data-center-development-in-texas/","evidenceTier":"reported","note":"Existing ~250 MW Calpine combined-cycle plant","createdAt":"2026-08-17T20:24:01.327Z"}],"facilities":[],"incidents":[],"events":[{"id":"ec409ece-bbad-4e57-9768-6dba68c584a3","dataCenterId":"0402b2da-aad8-4d33-a8dd-6d531b7a407a","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"grid_operator: ERCOT","occurredAt":"2026-08-19T00:29:40.521Z","createdAt":"2026-08-19T00:29:40.521Z"},{"id":"5212c55f-66d6-4999-abfd-2b686514d28c","dataCenterId":"0402b2da-aad8-4d33-a8dd-6d531b7a407a","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"financier: KKR","occurredAt":"2026-08-19T00:29:39.369Z","createdAt":"2026-08-19T00:29:39.369Z"},{"id":"7ebde735-59de-46ed-bfc5-97db5bb426d8","dataCenterId":"0402b2da-aad8-4d33-a8dd-6d531b7a407a","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"financier: Global Infrastructure Partners (BlackRock)","occurredAt":"2026-08-19T00:29:38.242Z","createdAt":"2026-08-19T00:29:38.242Z"},{"id":"6409aecb-fca3-40a4-82b1-ba45020ac4fc","dataCenterId":"0402b2da-aad8-4d33-a8dd-6d531b7a407a","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: DFW10 campus investment","occurredAt":"2026-08-19T00:29:36.655Z","createdAt":"2026-08-19T00:29:36.655Z"},{"id":"66fe57a1-bb86-4bc5-bda6-56db3b4a4215","dataCenterId":"0402b2da-aad8-4d33-a8dd-6d531b7a407a","eventType":"capacity_changed","series":"under_construction","oldValue":null,"newValue":"0.144","claimId":"71317657-d530-4d37-90ce-230e90400906","detail":null,"occurredAt":"2026-08-19T00:29:36.050Z","createdAt":"2026-08-19T00:29:36.050Z"},{"id":"1304fa6e-472c-4bbc-9b73-df2a801f87ca","dataCenterId":"0402b2da-aad8-4d33-a8dd-6d531b7a407a","eventType":"claim_recorded","series":"under_construction","oldValue":null,"newValue":"0.144","claimId":"71317657-d530-4d37-90ce-230e90400906","detail":"reported · journalist_report","occurredAt":"2026-08-19T00:29:35.900Z","createdAt":"2026-08-19T00:29:35.900Z"},{"id":"14a94e8b-1ece-4651-aae5-f33bba2dccb6","dataCenterId":"0402b2da-aad8-4d33-a8dd-6d531b7a407a","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"0.19","claimId":"3fc159df-85c7-4d3b-a7f0-266b1d1a7d5a","detail":"reported · press_release","occurredAt":"2026-08-19T00:29:35.216Z","createdAt":"2026-08-19T00:29:35.216Z"},{"id":"5a2aea95-4878-4630-a713-d54b7713c32c","dataCenterId":"0402b2da-aad8-4d33-a8dd-6d531b7a407a","eventType":"capacity_changed","series":"contracted","oldValue":"0.19","newValue":"0.4","claimId":"308de30d-969c-4b47-a591-f0f02ee9eb67","detail":null,"occurredAt":"2026-08-19T00:29:34.532Z","createdAt":"2026-08-19T00:29:34.532Z"},{"id":"f3eb5bea-0d4e-46d9-bb10-9d145782f714","dataCenterId":"0402b2da-aad8-4d33-a8dd-6d531b7a407a","eventType":"claim_recorded","series":"contracted","oldValue":null,"newValue":"0.4","claimId":"308de30d-969c-4b47-a591-f0f02ee9eb67","detail":"reported · press_release","occurredAt":"2026-08-19T00:29:34.379Z","createdAt":"2026-08-19T00:29:34.379Z"},{"id":"b6f2874c-af7f-4c2e-95f3-178ccb3a6f92","dataCenterId":"0402b2da-aad8-4d33-a8dd-6d531b7a407a","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: Calpine","occurredAt":"2026-08-17T20:24:02.845Z","createdAt":"2026-08-17T20:24:02.845Z"},{"id":"17edd07c-c076-4993-8954-cc546feef0f4","dataCenterId":"0402b2da-aad8-4d33-a8dd-6d531b7a407a","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: CyrusOne","occurredAt":"2026-08-17T20:24:02.083Z","createdAt":"2026-08-17T20:24:02.083Z"},{"id":"33ab4a2b-7290-4ffb-922d-5522fd5f2204","dataCenterId":"0402b2da-aad8-4d33-a8dd-6d531b7a407a","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"0.4","claimId":"47a3398a-663e-4340-ae75-f27df4182925","detail":null,"occurredAt":"2026-08-17T20:24:01.096Z","createdAt":"2026-08-17T20:24:01.096Z"},{"id":"5a7604c9-224f-4e8b-bc15-532467702a43","dataCenterId":"0402b2da-aad8-4d33-a8dd-6d531b7a407a","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"0.4","claimId":"47a3398a-663e-4340-ae75-f27df4182925","detail":"reported · journalist_report","occurredAt":"2026-08-17T20:24:00.944Z","createdAt":"2026-08-17T20:24:00.944Z"},{"id":"53338070-d445-415c-acf7-7c069b521a57","dataCenterId":"0402b2da-aad8-4d33-a8dd-6d531b7a407a","eventType":"capacity_changed","series":"contracted","oldValue":null,"newValue":"0.19","claimId":"ed5d3b6b-9003-4131-96a0-30a7bd9e5ed2","detail":null,"occurredAt":"2026-08-17T20:24:00.256Z","createdAt":"2026-08-17T20:24:00.256Z"},{"id":"7c986f7e-272c-4bae-b34c-6d0caf7d94db","dataCenterId":"0402b2da-aad8-4d33-a8dd-6d531b7a407a","eventType":"claim_recorded","series":"contracted","oldValue":null,"newValue":"0.19","claimId":"ed5d3b6b-9003-4131-96a0-30a7bd9e5ed2","detail":"reported · utility_filing","occurredAt":"2026-08-17T20:24:00.107Z","createdAt":"2026-08-17T20:24:00.107Z"}],"capacity_picture":{"announced_gw":0.4,"contracted_gw":0.4,"under_construction_gw":0.144,"energized_gw":null,"announced_minus_energized_gw":0.4,"by_series":{"announced":{"valueGw":0.4,"asOf":"2025-12-09T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://www.datacenterdynamics.com/en/news/cyrusone-files-to-expand-data-center-campus-outside-waco-texas/"},"contracted":{"valueGw":0.4,"asOf":"2025-11-03T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://www.prnewswire.com/news-releases/calpine-and-cyrusone-announce-phase-2-of-powered-land-agreement-to-support-hyperscale-data-center-at-thad-hill-energy-center-in-texas-302602881.html"},"under_construction":{"valueGw":0.144,"asOf":"2026-06-01T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://hoodline.com/2025/12/tiny-whitney-braces-as-cyrusone-drops-400-megawatt-data-center-bombshell/"},"energized":null}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"CyrusOne DFW10 Whitney / Thad Hill Powered Land","url":"https://registry.deploy.report/datacenters/cyrusone-dfw10-whitney-thad-hill-bosque-texas","address":{"@type":"PostalAddress","addressLocality":"Whitney"}}}