{"id":"e5d8beeb-01ca-44d3-a044-c1d6ae9fcfe9","slug":"edgeconnex-cedar-creek-texas","name":"EdgeConneX Cedar Creek Campus (CoreWeave AUS02)","aliases":["EdgeConneX Cedar Creek","EdgeConneX AUS02","CoreWeave Cedar Creek","EdgeConneX Bastrop County campus","EdgeConneX AUS01 Cedar Creek","6752 FM 535 Cedar Creek","8001 Wolf Lane Cedar Creek","EdgeConneX Wolf Lane campus"],"locationId":"daf11db5-886e-412c-8bed-ef30c5026087","lat":30.0802,"lng":-97.49329,"locationPrecision":"city","landStatus":"private","lifecycleState":"under_construction","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":"2026-08-01T00:00:00.000Z","dedicatedSubstation":null,"gridOperator":"ERCOT","waterSourceNotes":"Local reporting says Cedar Creek EdgeConneX facilities are expected to use closed-loop cooling designed to reduce water consumption ([Texas Reporter](https://texreporter.com/2026/09/02/four-cedar-creek-data-centers-represent-2-8-billion-development/)).","servingUtility":null,"acreage":130,"totalBuildingSqft":null,"streetAddress":null,"notes":"EdgeConneX data center campus in Cedar Creek, Bastrop County, Texas (AUS01 address published as 6752 FM 535 / Wolf Lane area). Community Impact (Jul 24, 2026) reports CoreWeave Inc. as the registered qualifying occupant of the first building, with construction ongoing and an expected August 2026 opening; Bastrop County approved a 10-year 75% tax abatement later assigned to CoreWeave; Texas Comptroller certified the first building as a qualifying large data center project (Jul 11, 2025). EdgeConneX Austin materials list AUS01 at 96 MW first building on a 130-acre master-planned site, AUS02-04 further phases (one 48 MW and two 96 MW buildings), and combined Austin sites at 240 MW. DCD reported AUS02 as a two-story ~578,000 sq ft building with ~$440M estimated cost. A separate EdgeConneX second Cedar Creek campus at 6682 FM 535 (EDCAUS11-14, ~$2.8B in TDLR filings per Texas Reporter) is distinct from this Wolf Lane campus. Campus-wide MW beyond EdgeConneX's published Austin phasing is not taken as a single verified total here.","keyFacts":[{"label":"Developer / landlord","value":"EdgeConneX ([EdgeConneX](https://www.edgeconnex.com/locations/americas/austin-texas/); [Community Impact](https://communityimpact.com/bastrop-cedar-creek/development/ai-cloud-company-coreweave-to-fill-440m-cedar-creek-data-center/))"},{"label":"Named occupant (Building 1)","value":"CoreWeave (Texas records / county abatement assignment) ([Community Impact](https://communityimpact.com/bastrop-cedar-creek/development/ai-cloud-company-coreweave-to-fill-440m-cedar-creek-data-center/); [Data Center Dynamics](https://www.datacenterdynamics.com/en/news/coreweave-to-lease-capacity-from-edgeconnex-at-data-center-campus-in-cedar-creek-texas/))"},{"label":"Location / address","value":"Cedar Creek, Bastrop County, Texas; EdgeConneX publishes AUS01 at 6752 FM 535, Cedar Creek, TX 78612 (Wolf Lane area) ([EdgeConneX](https://www.edgeconnex.com/locations/americas/austin-texas/); [Community Impact](https://communityimpact.com/bastrop-cedar-creek/development/ai-cloud-company-coreweave-to-fill-440m-cedar-creek-data-center/))"},{"label":"Lifecycle / timeline","value":"Under construction; Community Impact (Jul 2026) reported first building expected to open August 2026; EdgeConneX datasheet framed AUS01 first phase planned to arrive by 2027 ([Community Impact](https://communityimpact.com/bastrop-cedar-creek/development/ai-cloud-company-coreweave-to-fill-440m-cedar-creek-data-center/); [EdgeConneX Austin Data Sheet](https://www.edgeconnex.com/wp-content/uploads/2025/01/Austin-Data-Sheet-April-2025.pdf))"},{"label":"Published power phasing (EdgeConneX Austin)","value":"AUS01: 96 MW first building on a 130-acre master-planned site (datasheet also cites 336 MW initial potential); AUS02-04: further phases including one 48 MW and two 96 MW buildings; combined Austin sites listed at 240 MW ([EdgeConneX](https://www.edgeconnex.com/locations/americas/austin-texas/); [EdgeConneX Austin Data Sheet](https://www.edgeconnex.com/wp-content/uploads/2025/01/Austin-Data-Sheet-April-2025.pdf))"},{"label":"Building 1 project cost (reported)","value":"$440 million estimated cost; DCD cited ~578,000 sq ft two-story AUS02 building in TDLR context ([Community Impact](https://communityimpact.com/bastrop-cedar-creek/development/ai-cloud-company-coreweave-to-fill-440m-cedar-creek-data-center/); [Data Center Dynamics](https://www.datacenterdynamics.com/en/news/coreweave-to-lease-capacity-from-edgeconnex-at-data-center-campus-in-cedar-creek-texas/))"},{"label":"Tax treatment (Building 1)","value":"Bastrop County 10-year 75% property tax abatement approved Dec 2024 and assigned to CoreWeave Oct 2025; Texas Comptroller certified qualifying large data center project Jul 11, 2025 (20-year sales/use tax exemption on qualifying purchases) ([Community Impact](https://communityimpact.com/bastrop-cedar-creek/development/ai-cloud-company-coreweave-to-fill-440m-cedar-creek-data-center/))"},{"label":"Campus scope notes","value":"Community Impact described the first of up to 19 potential EdgeConneX buildings across Cedar Creek sites; DCD reported the Wolf Lane campus planned for four buildings once completed. A separate EdgeConneX campus at 6682 FM 535 (EDCAUS11-14) carries ~$2.8B combined estimated construction cost in TDLR filings per Texas Reporter and is distinct from this Wolf Lane row ([Community Impact](https://communityimpact.com/bastrop-cedar-creek/development/ai-cloud-company-coreweave-to-fill-440m-cedar-creek-data-center/); [Data Center Dynamics](https://www.datacenterdynamics.com/en/news/coreweave-to-lease-capacity-from-edgeconnex-at-data-center-campus-in-cedar-creek-texas/); [Texas Reporter](https://texreporter.com/2026/09/02/four-cedar-creek-data-centers-represent-2-8-billion-development/))"},{"label":"Naming note (AUS01 vs AUS02)","value":"EdgeConneX materials label the 6752 FM 535 site AUS01 (96 MW first building). Community Impact / DCD describe CoreWeave as Building 1 / AUS02 occupant at the same Cedar Creek / Wolf Lane campus. Treat AUS labels carefully until primary materials align the building ID with the CoreWeave lease ([EdgeConneX](https://www.edgeconnex.com/locations/americas/austin-texas/); [Community Impact](https://communityimpact.com/bastrop-cedar-creek/development/ai-cloud-company-coreweave-to-fill-440m-cedar-creek-data-center/); [Data Center Dynamics](https://www.datacenterdynamics.com/en/news/coreweave-to-lease-capacity-from-edgeconnex-at-data-center-campus-in-cedar-creek-texas/))"}],"reviewStatus":"reviewed","sources":[{"url":"https://communityimpact.com/bastrop-cedar-creek/development/ai-cloud-company-coreweave-to-fill-440m-cedar-creek-data-center/","title":"AI cloud company CoreWeave to fill $440M Cedar Creek data center","sourceName":"Community Impact"},{"url":"https://www.edgeconnex.com/locations/americas/austin-texas/","title":"EdgeConneX Austin Data Center | Colocation & Connectivity","sourceName":"EdgeConneX"},{"url":"https://www.edgeconnex.com/wp-content/uploads/2025/01/Austin-Data-Sheet-April-2025.pdf","title":"EdgeConneX Austin Data Sheet (April 2025)","sourceName":"EdgeConneX"},{"url":"https://www.datacenterdynamics.com/en/news/coreweave-to-lease-capacity-from-edgeconnex-at-data-center-campus-in-cedar-creek-texas/","title":"CoreWeave to lease capacity from EdgeConneX at data center campus in Cedar Creek, Texas","sourceName":"Data Center Dynamics"},{"url":"https://texreporter.com/2026/09/02/four-cedar-creek-data-centers-represent-2-8-billion-development/","title":"Four Cedar Creek data centers represent $2.8 billion development","sourceName":"Texas Reporter"}],"reviewNote":null,"createdAt":"2026-09-27T05:17:41.796Z","updatedAt":"2026-09-28T02:44:14.468Z","location":{"id":"daf11db5-886e-412c-8bed-ef30c5026087","name":"Cedar Creek","slug":"cedar-creek-texas","kind":"city","parentLocationId":"8a4662f7-58a3-4e1b-b3bb-072027a27ccf","region":"Texas","lat":30.0802,"lng":-97.49329,"reviewStatus":"reviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-19T04:03:22.634Z","updatedAt":"2026-08-29T19:36:19.165Z"},"parties":[{"id":"664dce79-7b73-42d2-8d64-d432d15fe952","dataCenterId":"e5d8beeb-01ca-44d3-a044-c1d6ae9fcfe9","companyId":"09b19842-f22b-4352-bb21-f8bfe05e6ef6","externalName":null,"role":"developer","structureNotes":"Campus developer / landlord for the Cedar Creek multi-building project.","createdAt":"2026-09-27T05:17:42.565Z","company":{"id":"09b19842-f22b-4352-bb21-f8bfe05e6ef6","name":"EdgeConneX","slug":"edgeconnex"}},{"id":"f83d33ff-5fc5-4b98-93e1-3a31912d8b54","dataCenterId":"e5d8beeb-01ca-44d3-a044-c1d6ae9fcfe9","companyId":"da8eb3b3-8b7c-41f0-96cc-9f700a57bfca","externalName":null,"role":"tenant","structureNotes":"Named qualifying occupant of Building 1 in Texas/county records per Community Impact.","createdAt":"2026-09-27T05:17:43.327Z","company":{"id":"da8eb3b3-8b7c-41f0-96cc-9f700a57bfca","name":"CoreWeave","slug":"coreweave"}},{"id":"21e9067e-9865-4b20-879f-88658e796614","dataCenterId":"e5d8beeb-01ca-44d3-a044-c1d6ae9fcfe9","companyId":null,"externalName":"ERCOT","role":"grid_operator","structureNotes":"Campus sits in the ERCOT footprint (registry gridOperator).","createdAt":"2026-09-27T12:41:22.864Z","company":null}],"capacityClaims":[{"id":"69832677-d75b-4ccc-933a-a1f1508c1545","dataCenterId":"e5d8beeb-01ca-44d3-a044-c1d6ae9fcfe9","series":"announced","valueGw":0.096,"asOf":"2025-04-01T00:00:00.000Z","sourceUrl":"https://www.edgeconnex.com/wp-content/uploads/2025/01/Austin-Data-Sheet-April-2025.pdf","sourceType":"company","evidenceTier":"claimed","supersedesId":null,"note":"EdgeConneX Austin datasheet: AUS01 96 MW first building. Not equated here to CoreWeave leased critical IT without a primary lease MW figure.","createdAt":"2026-09-27T12:41:19.631Z"}],"financialClaims":[{"id":"c27f0e04-0769-4c21-aa78-2319607242d0","dataCenterId":"e5d8beeb-01ca-44d3-a044-c1d6ae9fcfe9","kind":"capex","label":"Building 1 estimated project cost (reported)","valueUsd":"440000000","capUsd":null,"conditions":"Community Impact / DCD: ~$440M estimated cost for the first Cedar Creek building associated with CoreWeave occupancy.","asOf":"2026-07-24T00:00:00.000Z","sourceUrl":"https://communityimpact.com/bastrop-cedar-creek/development/ai-cloud-company-coreweave-to-fill-440m-cedar-creek-data-center/","sourceType":"journalist_report","evidenceTier":"reported","createdAt":"2026-09-27T12:41:20.183Z"}],"metricClaims":[{"id":"651ae94e-3844-4e12-9094-39d4b852bc71","dataCenterId":"e5d8beeb-01ca-44d3-a044-c1d6ae9fcfe9","metricType":"capex_usd","valueNumeric":440000000,"valueText":null,"unit":null,"grantingJurisdiction":null,"asOf":"2026-07-24T00:00:00.000Z","sourceUrl":"https://communityimpact.com/bastrop-cedar-creek/development/ai-cloud-company-coreweave-to-fill-440m-cedar-creek-data-center/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":null,"createdAt":"2026-09-27T12:41:20.928Z"},{"id":"70246efd-5758-45eb-b302-f5a31eaf66d4","dataCenterId":"e5d8beeb-01ca-44d3-a044-c1d6ae9fcfe9","metricType":"cooling_type","valueNumeric":null,"valueText":"closed-loop (local reporting for Cedar Creek EdgeConneX facilities)","unit":null,"grantingJurisdiction":null,"asOf":"2026-09-02T00:00:00.000Z","sourceUrl":"https://texreporter.com/2026/09/02/four-cedar-creek-data-centers-represent-2-8-billion-development/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":null,"createdAt":"2026-09-27T12:41:21.695Z"}],"powerProjects":[],"facilities":[],"incidents":[],"events":[{"id":"8d5ff8dc-a6c7-433f-a441-5bd7fddaa941","dataCenterId":"e5d8beeb-01ca-44d3-a044-c1d6ae9fcfe9","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"grid_operator: ERCOT","occurredAt":"2026-09-27T12:41:23.249Z","createdAt":"2026-09-27T12:41:23.249Z"},{"id":"9866b5fe-3a6e-4457-8067-958132f69e6e","dataCenterId":"e5d8beeb-01ca-44d3-a044-c1d6ae9fcfe9","eventType":"claim_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"metric:cooling_type","occurredAt":"2026-09-27T12:41:22.079Z","createdAt":"2026-09-27T12:41:22.079Z"},{"id":"21275ab6-4456-470f-89c9-429606b83600","dataCenterId":"e5d8beeb-01ca-44d3-a044-c1d6ae9fcfe9","eventType":"claim_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"metric:capex_usd=440000000","occurredAt":"2026-09-27T12:41:21.316Z","createdAt":"2026-09-27T12:41:21.316Z"},{"id":"767bbdb4-6960-44f4-865d-6f21e2e4e2cf","dataCenterId":"e5d8beeb-01ca-44d3-a044-c1d6ae9fcfe9","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: Building 1 estimated project cost (reported)","occurredAt":"2026-09-27T12:41:20.556Z","createdAt":"2026-09-27T12:41:20.556Z"},{"id":"3b1ac743-cd0b-4f0c-909b-33afc368c5b2","dataCenterId":"e5d8beeb-01ca-44d3-a044-c1d6ae9fcfe9","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"0.096","claimId":"69832677-d75b-4ccc-933a-a1f1508c1545","detail":null,"occurredAt":"2026-09-27T12:41:19.949Z","createdAt":"2026-09-27T12:41:19.949Z"},{"id":"7f30bff9-1ba8-4272-b9a5-d889a78d8141","dataCenterId":"e5d8beeb-01ca-44d3-a044-c1d6ae9fcfe9","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"0.096","claimId":"69832677-d75b-4ccc-933a-a1f1508c1545","detail":"claimed · company","occurredAt":"2026-09-27T12:41:19.791Z","createdAt":"2026-09-27T12:41:19.791Z"},{"id":"419f523f-6280-4960-8cc8-b4b8e2e6b167","dataCenterId":"e5d8beeb-01ca-44d3-a044-c1d6ae9fcfe9","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"tenant: da8eb3b3-8b7c-41f0-96cc-9f700a57bfca","occurredAt":"2026-09-27T05:17:43.708Z","createdAt":"2026-09-27T05:17:43.708Z"},{"id":"c2bbab33-c8b3-444a-966d-30159c98befd","dataCenterId":"e5d8beeb-01ca-44d3-a044-c1d6ae9fcfe9","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: 09b19842-f22b-4352-bb21-f8bfe05e6ef6","occurredAt":"2026-09-27T05:17:42.944Z","createdAt":"2026-09-27T05:17:42.944Z"}],"capacity_picture":{"announced_gw":0.096,"contracted_gw":null,"under_construction_gw":null,"energized_gw":null,"announced_minus_energized_gw":0.096,"by_series":{"announced":{"valueGw":0.096,"asOf":"2025-04-01T00:00:00.000Z","evidenceTier":"claimed","sourceUrl":"https://www.edgeconnex.com/wp-content/uploads/2025/01/Austin-Data-Sheet-April-2025.pdf"},"contracted":null,"under_construction":null,"energized":null}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"EdgeConneX Cedar Creek Campus (CoreWeave AUS02)","url":"https://registry.deploy.report/datacenters/edgeconnex-cedar-creek-texas","geo":{"@type":"GeoCoordinates","latitude":30.0802,"longitude":-97.49329},"address":{"@type":"PostalAddress","addressLocality":"Cedar Creek"}}}