{"id":"1f2bbec1-0b76-46f4-a5c6-6eb2a61ee986","slug":"edgecore-mesa-north-campus","name":"EdgeCore Mesa (North Campus, Elliot Road Technology Corridor)","aliases":["EdgeCore Mesa North Campus","EdgeCore Eastmark"],"locationId":"672b6e97-cace-46c4-a79b-ddd5c5c988d1","lat":null,"lng":null,"locationPrecision":null,"landStatus":"private","lifecycleState":"permitted","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"WECC","waterSourceNotes":null,"servingUtility":null,"acreage":84,"totalBuildingSqft":null,"streetAddress":null,"notes":"Campus at Elliot Road and Everton Terrace in the Eastmark/Elliot Road Technology Corridor; expansion adds ~44 acres to a 40-acre facility, taking capacity from >200 MW to >450 MW. Mesa Planning & Zoning approved a scaled-back plan (two ~618K sq ft buildings) in early 2025 with generator-testing and mural conditions. Firm energization schedule not disclosed.","keyFacts":[{"label":"450 MW+ Metro Phoenix expansion / land (primary EdgeCore)","value":"On May 20, 2025 EdgeCore Digital Infrastructure announced acquisition of an additional 43.87 acres in Mesa and expanded capacity designed to deliver 450 MW+ to hyperscale customers, stating the parcel more than doubles buildable acreage EdgeCore controls in Mesa. CEO Lee Kestler said that since establishing the first Mesa campus in April 2023 the company had constructed and commissioned 206 MW at the site, and that the new land enables another 250+ MW of data center space ([EdgeCore, May 20 2025](https://edgecore.com/resources/press-releases/edgecore-digital-infrastructure-announces-expansion-of-its-metro-phoenix-data-center-market-to-over-450-mw))","sourceUrl":"https://edgecore.com/resources/press-releases/edgecore-digital-infrastructure-announces-expansion-of-its-metro-phoenix-data-center-market-to-over-450-mw"},{"label":"SRP power delivery timing (primary EdgeCore)","value":"EdgeCore states affordable power via Salt River Project (SRP) is already available at its first Mesa campus for the operational data center and is slated for delivery to two buildings under construction upon completion in 2025 and 2026. SRP GM/CEO Jim Pratt is quoted congratulating the expansion and noting EdgeCore's water-conservation commitment ([EdgeCore, May 20 2025](https://edgecore.com/resources/press-releases/edgecore-digital-infrastructure-announces-expansion-of-its-metro-phoenix-data-center-market-to-over-450-mw))","sourceUrl":"https://edgecore.com/resources/press-releases/edgecore-digital-infrastructure-announces-expansion-of-its-metro-phoenix-data-center-market-to-over-450-mw"},{"label":"Air-cooled design / certifications (primary EdgeCore)","value":"EdgeCore describes Mesa data centers as air-cooled with an ultra-efficient closed-loop chilled water system requiring nearly no water to recharge, designed to meet LEED BD+C v4 Silver standards, with PH01 receiving Green Globes for Existing Buildings certification in 2023 and PH02/PH03 (under construction at announcement) awarded Designed to Earn ENERGY STAR certifications ([EdgeCore, May 20 2025](https://edgecore.com/resources/press-releases/edgecore-digital-infrastructure-announces-expansion-of-its-metro-phoenix-data-center-market-to-over-450-mw))","sourceUrl":"https://edgecore.com/resources/press-releases/edgecore-digital-infrastructure-announces-expansion-of-its-metro-phoenix-data-center-market-to-over-450-mw"}],"reviewStatus":"reviewed","sources":[{"url":"https://www.aztechcouncil.org/edgecore-data-center-mesa-planning-zoning/","date":"2025-03-12","title":"EdgeCore's massive data center campus in Mesa clears checkpoint","publisher":"Arizona Technology Council"},{"url":"https://www.datacenterdynamics.com/en/news/edgecore-expands-mesa-data-center-campus-in-arizona/","date":"2025-05-21","title":"EdgeCore expands Mesa data center campus in Arizona","publisher":"Data Center Dynamics"},{"url":"https://edgecore.com/resources/press-releases/edgecore-digital-infrastructure-announces-expansion-of-its-metro-phoenix-data-center-market-to-over-450-mw","date":"2025-05-20","title":"EdgeCore Digital Infrastructure Announces Expansion of Its Metro Phoenix Data Center Market to Over 450 MW","publisher":"EdgeCore Digital Infrastructure"}],"reviewNote":null,"createdAt":"2026-08-17T20:24:45.390Z","updatedAt":"2026-09-29T05:52:57.134Z","location":{"id":"672b6e97-cace-46c4-a79b-ddd5c5c988d1","name":"Mesa","slug":"mesa-arizona","kind":"city","parentLocationId":"559f49c3-1532-4c6f-b055-4d83a05fb88b","region":"Southwest","lat":33.4151005,"lng":-111.831455,"reviewStatus":"reviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-17T20:24:40.374Z","updatedAt":"2026-08-21T03:20:12.226Z"},"parties":[{"id":"19c1f586-4517-417e-8c1f-f81c4245d2a8","dataCenterId":"1f2bbec1-0b76-46f4-a5c6-6eb2a61ee986","companyId":null,"externalName":"EdgeCore Digital Infrastructure","role":"developer","structureNotes":null,"createdAt":"2026-08-17T20:24:46.741Z","company":null},{"id":"aa6d9f36-5bcc-4e0a-ae07-278d20e65fb3","dataCenterId":"1f2bbec1-0b76-46f4-a5c6-6eb2a61ee986","companyId":null,"externalName":"Salt River Project (SRP)","role":"utility","structureNotes":"Mesa/Eastmark corridor; specific service agreement not confirmed.","createdAt":"2026-08-17T20:24:47.499Z","company":null}],"capacityClaims":[{"id":"de3668a2-aa59-497c-9895-c0af60f895e0","dataCenterId":"1f2bbec1-0b76-46f4-a5c6-6eb2a61ee986","series":"announced","valueGw":0.45,"asOf":"2025-05-21T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/edgecore-expands-mesa-data-center-campus-in-arizona/","sourceType":"county_docket","evidenceTier":"reported","supersedesId":null,"note":"Expansion raises campus from >200 MW to >450 MW; tied to Mesa P&Z site-plan approval.","createdAt":"2026-08-17T20:24:46.165Z"},{"id":"12ac49e0-46e5-4c56-8bab-4b4f1ed20d63","dataCenterId":"1f2bbec1-0b76-46f4-a5c6-6eb2a61ee986","series":"energized","valueGw":0.206,"asOf":"2025-05-20T00:00:00.000Z","sourceUrl":"https://edgecore.com/edgecore-digital-infrastructure-announces-expansion-of-its-metro-phoenix-data-center-market-to-over-450-mw/","sourceType":"company_filing","evidenceTier":"verified","supersedesId":null,"note":"Existing Mesa (Elliot Road Technology Corridor) critical load per EdgeCore; first building PH01 operational","createdAt":"2026-08-19T00:15:31.509Z"}],"financialClaims":[],"metricClaims":[],"powerProjects":[],"facilities":[],"incidents":[],"events":[{"id":"5908d487-7216-4276-8b23-2bf1842594be","dataCenterId":"1f2bbec1-0b76-46f4-a5c6-6eb2a61ee986","eventType":"capacity_changed","series":"energized","oldValue":null,"newValue":"0.206","claimId":"12ac49e0-46e5-4c56-8bab-4b4f1ed20d63","detail":null,"occurredAt":"2026-08-19T00:15:31.812Z","createdAt":"2026-08-19T00:15:31.812Z"},{"id":"585f2db4-eeb8-4d01-894d-dfe0c1bd4ff7","dataCenterId":"1f2bbec1-0b76-46f4-a5c6-6eb2a61ee986","eventType":"claim_recorded","series":"energized","oldValue":null,"newValue":"0.206","claimId":"12ac49e0-46e5-4c56-8bab-4b4f1ed20d63","detail":"verified · company_filing","occurredAt":"2026-08-19T00:15:31.663Z","createdAt":"2026-08-19T00:15:31.663Z"},{"id":"df981eac-ccc6-47f0-978a-d2a4b47ffe94","dataCenterId":"1f2bbec1-0b76-46f4-a5c6-6eb2a61ee986","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: Salt River Project (SRP)","occurredAt":"2026-08-17T20:24:47.873Z","createdAt":"2026-08-17T20:24:47.873Z"},{"id":"8d2e4e89-2713-45da-bc24-22d2809dd312","dataCenterId":"1f2bbec1-0b76-46f4-a5c6-6eb2a61ee986","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: EdgeCore Digital Infrastructure","occurredAt":"2026-08-17T20:24:47.116Z","createdAt":"2026-08-17T20:24:47.116Z"},{"id":"9e5d6b21-a971-4ce5-999d-7072ff2a4089","dataCenterId":"1f2bbec1-0b76-46f4-a5c6-6eb2a61ee986","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"0.45","claimId":"de3668a2-aa59-497c-9895-c0af60f895e0","detail":null,"occurredAt":"2026-08-17T20:24:46.503Z","createdAt":"2026-08-17T20:24:46.503Z"},{"id":"47058bdc-4905-4be5-bb56-40db99f1d293","dataCenterId":"1f2bbec1-0b76-46f4-a5c6-6eb2a61ee986","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"0.45","claimId":"de3668a2-aa59-497c-9895-c0af60f895e0","detail":"reported · county_docket","occurredAt":"2026-08-17T20:24:46.344Z","createdAt":"2026-08-17T20:24:46.344Z"}],"capacity_picture":{"announced_gw":0.45,"contracted_gw":null,"under_construction_gw":null,"energized_gw":0.206,"announced_minus_energized_gw":0.24400000000000002,"by_series":{"announced":{"valueGw":0.45,"asOf":"2025-05-21T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://www.datacenterdynamics.com/en/news/edgecore-expands-mesa-data-center-campus-in-arizona/"},"contracted":null,"under_construction":null,"energized":{"valueGw":0.206,"asOf":"2025-05-20T00:00:00.000Z","evidenceTier":"verified","sourceUrl":"https://edgecore.com/edgecore-digital-infrastructure-announces-expansion-of-its-metro-phoenix-data-center-market-to-over-450-mw/"}}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"EdgeCore Mesa (North Campus, Elliot Road Technology Corridor)","url":"https://registry.deploy.report/datacenters/edgecore-mesa-north-campus","address":{"@type":"PostalAddress","addressLocality":"Mesa"}}}