{"id":"1f2bbec1-0b76-46f4-a5c6-6eb2a61ee986","slug":"edgecore-mesa-north-campus","name":"EdgeCore Mesa (North Campus, Elliot Road Technology Corridor)","aliases":["EdgeCore Mesa North Campus","EdgeCore Eastmark"],"locationId":"672b6e97-cace-46c4-a79b-ddd5c5c988d1","lat":null,"lng":null,"locationPrecision":null,"landStatus":"private","lifecycleState":"permitted","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":null,"expectedEnergizationPrecision":null,"expectedEnergizationMilestone":null,"dedicatedSubstation":null,"gridOperator":"WECC","waterSourceNotes":null,"servingUtility":null,"acreage":84,"totalBuildingSqft":null,"streetAddress":null,"notes":"Campus at Elliot Road and Everton Terrace in the Eastmark/Elliot Road Technology Corridor; expansion adds ~44 acres to a 40-acre facility, taking capacity from >200 MW to >450 MW. Mesa Planning & Zoning approved a scaled-back plan (two ~618K sq ft buildings) in early 2025 with generator-testing and mural conditions. Firm energization schedule not disclosed.","keyFacts":[{"label":"Expansion (company-claimed, May 2025)","value":"Added 43.87 acres in Mesa; 450 MW+ planned; 206 MW built and commissioned since Apr 2023."},{"label":"Power (company-claimed)","value":"Salt River Project power at the first campus; two more buildings due 2025 and 2026"},{"label":"Cooling (company-claimed)","value":"Air-cooled with closed-loop chilled water; LEED Silver design target"}],"reviewStatus":"reviewed","sources":[{"url":"https://www.aztechcouncil.org/edgecore-data-center-mesa-planning-zoning/","date":"2025-03-12","title":"EdgeCore's massive data center campus in Mesa clears checkpoint","publisher":"Arizona Technology Council"},{"url":"https://www.datacenterdynamics.com/en/news/edgecore-expands-mesa-data-center-campus-in-arizona/","date":"2025-05-21","title":"EdgeCore expands Mesa data center campus in Arizona","publisher":"Data Center Dynamics"},{"url":"https://edgecore.com/resources/press-releases/edgecore-digital-infrastructure-announces-expansion-of-its-metro-phoenix-data-center-market-to-over-450-mw","date":"2025-05-20","title":"EdgeCore Digital Infrastructure Announces Expansion of Its Metro Phoenix Data Center Market to Over 450 MW","publisher":"EdgeCore Digital Infrastructure"}],"reviewNote":null,"createdAt":"2026-08-17T20:24:45.390Z","updatedAt":"2026-10-12T23:55:27.114Z","location":{"id":"672b6e97-cace-46c4-a79b-ddd5c5c988d1","name":"Mesa","slug":"mesa-arizona","kind":"city","parentLocationId":"559f49c3-1532-4c6f-b055-4d83a05fb88b","region":"Southwest","lat":33.4151005,"lng":-111.831455,"reviewStatus":"reviewed","aliases":["Mesa, AZ","Mesa, Arizona","Mesa Arizona","Mesa AZ"],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-17T20:24:40.374Z","updatedAt":"2026-11-02T18:32:15.604Z"},"parties":[{"id":"19c1f586-4517-417e-8c1f-f81c4245d2a8","dataCenterId":"1f2bbec1-0b76-46f4-a5c6-6eb2a61ee986","companyId":null,"externalName":"EdgeCore Digital Infrastructure","role":"developer","structureNotes":null,"createdAt":"2026-08-17T20:24:46.741Z","company":null},{"id":"aa6d9f36-5bcc-4e0a-ae07-278d20e65fb3","dataCenterId":"1f2bbec1-0b76-46f4-a5c6-6eb2a61ee986","companyId":null,"externalName":"Salt River Project (SRP)","role":"utility","structureNotes":"Mesa/Eastmark corridor; specific service agreement not confirmed.","createdAt":"2026-08-17T20:24:47.499Z","company":null}],"capacityClaims":[{"id":"de3668a2-aa59-497c-9895-c0af60f895e0","dataCenterId":"1f2bbec1-0b76-46f4-a5c6-6eb2a61ee986","series":"announced","valueGw":0.45,"asOf":"2025-05-21T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/edgecore-expands-mesa-data-center-campus-in-arizona/","sourceType":"county_docket","evidenceTier":"reported","supersedesId":null,"note":"Expansion raises campus from >200 MW to >450 MW; tied to Mesa P&Z site-plan approval.","createdAt":"2026-08-17T20:24:46.165Z"},{"id":"12ac49e0-46e5-4c56-8bab-4b4f1ed20d63","dataCenterId":"1f2bbec1-0b76-46f4-a5c6-6eb2a61ee986","series":"energized","valueGw":0.206,"asOf":"2025-05-20T00:00:00.000Z","sourceUrl":"https://edgecore.com/edgecore-digital-infrastructure-announces-expansion-of-its-metro-phoenix-data-center-market-to-over-450-mw/","sourceType":"company_filing","evidenceTier":"verified","supersedesId":null,"note":"Existing Mesa (Elliot Road Technology Corridor) critical load per EdgeCore; first building PH01 operational","createdAt":"2026-08-19T00:15:31.509Z"}],"financialClaims":[],"metricClaims":[],"powerProjects":[],"permits":[{"id":"2fff706c-872e-4b35-b5c0-bc706b41a66a","dataCenterId":"1f2bbec1-0b76-46f4-a5c6-6eb2a61ee986","agency":"Maricopa County AQD","jurisdiction":"Arizona","kind":"air","permitType":"Air permit to operate/construct (emergency diesel generators); facility F004157, legacy 180012","number":"P0008702","applicant":"MECP1 Mesa 1, LLC","status":"unknown","filedDate":"2018-02-14T00:00:00.000Z","decidedDate":"2022-07-22T00:00:00.000Z","docket":null,"regulatedEntityId":null,"sourceUrl":"https://edms.maricopa.gov/aq/api/Document/AXPUlaZ11Xv1WMFFH%C3%89MiqDH%C3%81kTbJigztVejjXTV7xhmYFpWGb6Xs%C3%89p1%C3%81VLpXQPmhpeh7pcozKhUgxAWwarqEwLw%3D/","reviewStatus":"reviewed","reviewNote":"Campus link confirmed 2026-11-18: The Maricopa County air permit is issued for 3856 S Everton Terrace, Mesa, the address of EdgeCore's existing Mesa campus at Elliot Road and Everton Terrace. The filed revision shows an expiration date of May 31, 2023, so a later renewal likely exists; EPA ECHO lists the facility (MECP1 Mesa Intermediate 1, source AZMCA000000F004157) as operating. https://edms.maricopa.gov/aq/api/Document/AXPUlaZ11Xv1WMFFH%C3%89MiqDH%C3%81kTbJigztVejjXTV7xhmYFpWGb6Xs%C3%89p1%C3%81VLpXQPmhpeh7pcozKhUgxAWwarqEwLw%3D/ \"Permit: \"ISSUED TO MECP1 Mesa 1, LLC 3856 S Everton Terrace Mesa, AZ 85212 ... FACILITY NUMBER: F004157 ... PERMIT NUMBER: P0008702\". CommercialSearch on EdgeCore: \"The Mesa campus currently comprises nearly 1.7 million square feet and rises on a 40-acre parcel at 3856 S. Everton Terrace.\"\"","lastCheckedAt":"2026-11-17T00:00:00.000Z","createdAt":"2026-11-18T02:56:24.603Z","updatedAt":"2026-11-18T18:53:12.326Z"}],"facilities":[],"incidents":[],"events":[{"id":"d9c0eb82-0630-496a-8f05-111603ee1b9f","dataCenterId":"1f2bbec1-0b76-46f4-a5c6-6eb2a61ee986","eventType":"air_facility_recorded","series":"AZMCA000000F004157","oldValue":null,"newValue":"Operating|80% Synthetic Minor Emissions|05/09/2025|No High Priority Violation","claimId":null,"detail":"EPA's Clean Air Act records list MECP1 MESA INTERMEDIATE 1 (3856 S Everton Ter, Maricopa County, AZ) as operating, a synthetic minor source permitted at 80% or more of the major-source threshold. Its most recent Clean Air Act violation on file is dated May 9, 2025. Source: EPA ECHO facility AZMCA000000F004157.","occurredAt":"2026-11-18T18:54:01.975Z","createdAt":"2026-11-18T18:54:01.975Z"},{"id":"718ac6a3-6b4b-4fd7-82fd-16b1d2c9877d","dataCenterId":"1f2bbec1-0b76-46f4-a5c6-6eb2a61ee986","eventType":"permit_recorded","series":null,"oldValue":null,"newValue":"Maricopa County AQD P0008702: unknown","claimId":null,"detail":"Air permit to operate/construct (emergency diesel generators); facility F004157, legacy 180012 P0008702 recorded from https://edms.maricopa.gov/aq/api/Document/AXPUlaZ11Xv1WMFFH%C3%89MiqDH%C3%81kTbJigztVejjXTV7xhmYFpWGb6Xs%C3%89p1%C3%81VLpXQPmhpeh7pcozKhUgxAWwarqEwLw%3D/","occurredAt":"2026-11-18T02:56:24.751Z","createdAt":"2026-11-18T02:56:24.751Z"},{"id":"5908d487-7216-4276-8b23-2bf1842594be","dataCenterId":"1f2bbec1-0b76-46f4-a5c6-6eb2a61ee986","eventType":"capacity_changed","series":"energized","oldValue":null,"newValue":"0.206","claimId":"12ac49e0-46e5-4c56-8bab-4b4f1ed20d63","detail":null,"occurredAt":"2026-08-19T00:15:31.812Z","createdAt":"2026-08-19T00:15:31.812Z"},{"id":"585f2db4-eeb8-4d01-894d-dfe0c1bd4ff7","dataCenterId":"1f2bbec1-0b76-46f4-a5c6-6eb2a61ee986","eventType":"claim_recorded","series":"energized","oldValue":null,"newValue":"0.206","claimId":"12ac49e0-46e5-4c56-8bab-4b4f1ed20d63","detail":"verified · company_filing","occurredAt":"2026-08-19T00:15:31.663Z","createdAt":"2026-08-19T00:15:31.663Z"},{"id":"df981eac-ccc6-47f0-978a-d2a4b47ffe94","dataCenterId":"1f2bbec1-0b76-46f4-a5c6-6eb2a61ee986","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: Salt River Project (SRP)","occurredAt":"2026-08-17T20:24:47.873Z","createdAt":"2026-08-17T20:24:47.873Z"},{"id":"8d2e4e89-2713-45da-bc24-22d2809dd312","dataCenterId":"1f2bbec1-0b76-46f4-a5c6-6eb2a61ee986","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: EdgeCore Digital Infrastructure","occurredAt":"2026-08-17T20:24:47.116Z","createdAt":"2026-08-17T20:24:47.116Z"},{"id":"9e5d6b21-a971-4ce5-999d-7072ff2a4089","dataCenterId":"1f2bbec1-0b76-46f4-a5c6-6eb2a61ee986","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"0.45","claimId":"de3668a2-aa59-497c-9895-c0af60f895e0","detail":null,"occurredAt":"2026-08-17T20:24:46.503Z","createdAt":"2026-08-17T20:24:46.503Z"},{"id":"47058bdc-4905-4be5-bb56-40db99f1d293","dataCenterId":"1f2bbec1-0b76-46f4-a5c6-6eb2a61ee986","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"0.45","claimId":"de3668a2-aa59-497c-9895-c0af60f895e0","detail":"reported · county_docket","occurredAt":"2026-08-17T20:24:46.344Z","createdAt":"2026-08-17T20:24:46.344Z"}],"capacity_picture":{"announced_gw":0.45,"contracted_gw":null,"under_construction_gw":null,"energized_gw":0.206,"announced_minus_energized_gw":0.24400000000000002,"by_series":{"announced":{"valueGw":0.45,"asOf":"2025-05-21T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://www.datacenterdynamics.com/en/news/edgecore-expands-mesa-data-center-campus-in-arizona/"},"contracted":null,"under_construction":null,"energized":{"valueGw":0.206,"asOf":"2025-05-20T00:00:00.000Z","evidenceTier":"verified","sourceUrl":"https://edgecore.com/edgecore-digital-infrastructure-announces-expansion-of-its-metro-phoenix-data-center-market-to-over-450-mw/"}}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"EdgeCore Mesa (North Campus, Elliot Road Technology Corridor)","url":"https://registry.deploy.report/datacenters/edgecore-mesa-north-campus","address":{"@type":"PostalAddress","addressLocality":"Mesa"}}}