{"id":"723b1b3b-1564-4932-acea-7c32d83bc2c2","slug":"edgecore-reno-data-center-campus","name":"EdgeCore Reno Data Center Campus (Tahoe-Reno Industrial Center)","aliases":["EdgeCore Reno campus"],"locationId":"7970d73e-e076-4044-8664-03fb1d26be0c","lat":null,"lng":null,"locationPrecision":"city","landStatus":null,"lifecycleState":"partially_energized","powerSourceMix":null,"interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":null,"expectedEnergizationPrecision":null,"expectedEnergizationMilestone":null,"dedicatedSubstation":null,"gridOperator":null,"waterSourceNotes":null,"servingUtility":null,"acreage":56,"totalBuildingSqft":null,"streetAddress":null,"notes":"EdgeCore's three-building Reno campus in the Tahoe-Reno Industrial Center is designed to deliver 216 MW of critical IT load across nearly 1 million square feet on 56 acres, built for single-tenant hyperscale operators. In November 2026 EdgeCore opened its first facility, RN01, and topped out the shell of its second building, RN02.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://edgecore.com/locations/reno-data-center","title":"Reno Data Centers","sourceName":"EdgeCore"},{"url":"https://usdatacenterprojects.com/nevada/edgecore-launches-first-facility-and-completes-structural-milestone-at-second-data-center-in-216-mw-reno-campus-nevada","title":"EdgeCore Launches First Facility and Completes Structural Milestone at Second Data Center in 216 MW Reno Campus, Nevada","sourceName":"US Data Center Projects","publishedAt":"2026-11-20"}],"reviewNote":null,"createdAt":"2026-11-21T00:34:48.799Z","updatedAt":"2026-11-21T00:34:49.156Z","location":{"id":"7970d73e-e076-4044-8664-03fb1d26be0c","name":"Reno","slug":"reno-nevada","kind":"city","parentLocationId":"06c29acd-073c-47f8-91cd-82f02cdaff32","region":"Nevada","lat":39.5261788,"lng":-119.812658,"reviewStatus":"reviewed","aliases":["Reno, Nevada, USA"],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-19T03:09:50.081Z","updatedAt":"2026-11-02T18:32:15.604Z"},"parties":[{"id":"a22caa90-26c8-46f2-9d01-d9d024310de2","dataCenterId":"723b1b3b-1564-4932-acea-7c32d83bc2c2","companyId":"4cfb187b-99e5-4956-9ae3-51dce5fe0133","externalName":null,"role":"developer","structureNotes":null,"createdAt":"2026-11-21T00:34:50.915Z","company":{"id":"4cfb187b-99e5-4956-9ae3-51dce5fe0133","name":"EdgeCore Digital Infrastructure","slug":"edgecore-digital-infrastructure"}},{"id":"17cc3af6-f388-4402-b060-f982b8a61df5","dataCenterId":"723b1b3b-1564-4932-acea-7c32d83bc2c2","companyId":"4cfb187b-99e5-4956-9ae3-51dce5fe0133","externalName":null,"role":"operator","structureNotes":null,"createdAt":"2026-11-21T00:34:52.179Z","company":{"id":"4cfb187b-99e5-4956-9ae3-51dce5fe0133","name":"EdgeCore Digital Infrastructure","slug":"edgecore-digital-infrastructure"}}],"capacityClaims":[{"id":"75d80211-c40c-4a4e-b164-60bcc032e3e1","dataCenterId":"723b1b3b-1564-4932-acea-7c32d83bc2c2","series":"announced","valueGw":0.216,"asOf":"2026-11-20T00:00:00.000Z","sourceUrl":"https://edgecore.com/locations/reno-data-center","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":"intake proposal 861c50b2-dd98-4b32-8843-fd712f7ec5d4","createdAt":"2026-11-21T00:34:53.823Z"}],"financialClaims":[],"metricClaims":[],"powerProjects":[],"permits":[],"facilities":[],"incidents":[],"events":[{"id":"5955ee82-72c9-4907-8c0a-3395b4486aa2","dataCenterId":"723b1b3b-1564-4932-acea-7c32d83bc2c2","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"0.216","claimId":"75d80211-c40c-4a4e-b164-60bcc032e3e1","detail":null,"occurredAt":"2026-11-21T00:34:54.191Z","createdAt":"2026-11-21T00:34:54.191Z"},{"id":"a6290aca-5b49-45a9-9bdc-e22cf5b786fc","dataCenterId":"723b1b3b-1564-4932-acea-7c32d83bc2c2","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"0.216","claimId":"75d80211-c40c-4a4e-b164-60bcc032e3e1","detail":"claimed · press_release","occurredAt":"2026-11-21T00:34:54.045Z","createdAt":"2026-11-21T00:34:54.045Z"},{"id":"24d54acc-142e-4e3e-871f-6d5b8b86b5c5","dataCenterId":"723b1b3b-1564-4932-acea-7c32d83bc2c2","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"operator: 4cfb187b-99e5-4956-9ae3-51dce5fe0133","occurredAt":"2026-11-21T00:34:52.617Z","createdAt":"2026-11-21T00:34:52.617Z"},{"id":"159074a6-2383-406f-9b95-6a860d4af37e","dataCenterId":"723b1b3b-1564-4932-acea-7c32d83bc2c2","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: 4cfb187b-99e5-4956-9ae3-51dce5fe0133","occurredAt":"2026-11-21T00:34:51.350Z","createdAt":"2026-11-21T00:34:51.350Z"}],"capacity_picture":{"announced_gw":0.216,"contracted_gw":null,"under_construction_gw":null,"energized_gw":null,"announced_minus_energized_gw":0.216,"by_series":{"announced":{"valueGw":0.216,"asOf":"2026-11-20T00:00:00.000Z","evidenceTier":"claimed","sourceUrl":"https://edgecore.com/locations/reno-data-center"},"contracted":null,"under_construction":null,"energized":null}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"EdgeCore Reno Data Center Campus (Tahoe-Reno Industrial Center)","url":"https://registry.deploy.report/datacenters/edgecore-reno-data-center-campus","address":{"@type":"PostalAddress","addressLocality":"Reno"}}}