{"id":"30b8340f-34be-4d57-a8df-213239f3cb65","slug":"circe-energy-west-texas-ai-infrastructure-campus-permian","name":"West Texas AI Infrastructure Campus","aliases":[],"operatorCompanyId":"cab21feb-091c-4f29-8a04-51a4bbfebea6","parentCampusId":null,"lat":null,"lng":null,"streetAddress":null,"locationId":"089dc7e7-d0f2-4453-8ff7-0a79cdd56247","status":"announced","facilityType":"hyperscale","criticalItMw":1100,"buildingSqft":null,"yearOperational":null,"yearAnnounced":null,"servingUtility":null,"wikidataId":null,"osmId":null,"dataSourceFamily":"c1_operator","locationPrecision":"city","reviewStatus":"reviewed","sources":[{"url":"https://www.datacenterdynamics.com/en/news/circe-energy-secures-2gw-of-natural-gas-capacity-for-west-texas-data-center-campus/"}],"notes":null,"createdAt":"2026-08-19T04:47:07.368Z","updatedAt":"2026-08-19T05:08:40.807Z","operator":{"name":"Circe Energy","slug":"circe-energy"},"parentCampus":null,"location":{"name":"Permian Basin","slug":"permian-basin-texas","kind":"city","lat":null,"lng":null},"evidence":[{"id":"1f2f65b1-b496-495f-b51d-5b254afe3edb","facilityId":"30b8340f-34be-4d57-a8df-213239f3cb65","field":"critical_it_mw","value":"1.1 GW by 2030 (2 GW gas capacity ordered)","asOf":null,"sourceUrl":"https://www.datacenterdynamics.com/en/news/circe-energy-secures-2gw-of-natural-gas-capacity-for-west-texas-data-center-campus/","sourceType":"operator_page","tier":"claimed","note":null,"createdAt":"2026-08-19T04:47:07.745Z"},{"id":"3a72740a-acdf-4f67-95f2-8349cb8309f6","facilityId":"30b8340f-34be-4d57-a8df-213239f3cb65","field":"record","value":"West Texas AI Infrastructure Campus","asOf":null,"sourceUrl":"https://www.datacenterdynamics.com/en/news/circe-energy-secures-2gw-of-natural-gas-capacity-for-west-texas-data-center-campus/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T04:47:07.745Z"},{"id":"2cec0f3a-9af9-413e-a183-83b89fbd9ab2","facilityId":"30b8340f-34be-4d57-a8df-213239f3cb65","field":"status","value":"announced; 1,950-acre platform, starts 10 MW 2026 scaling to 1.1 GW by 2030","asOf":null,"sourceUrl":"https://www.datacenterdynamics.com/en/news/circe-energy-secures-2gw-of-natural-gas-capacity-for-west-texas-data-center-campus/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T04:47:07.745Z"}],"resolved_facts":{"critical_it_mw":{"id":"1f2f65b1-b496-495f-b51d-5b254afe3edb","facilityId":"30b8340f-34be-4d57-a8df-213239f3cb65","field":"critical_it_mw","value":"1.1 GW by 2030 (2 GW gas capacity ordered)","asOf":null,"sourceUrl":"https://www.datacenterdynamics.com/en/news/circe-energy-secures-2gw-of-natural-gas-capacity-for-west-texas-data-center-campus/","sourceType":"operator_page","tier":"claimed","note":null,"createdAt":"2026-08-19T04:47:07.745Z"},"record":{"id":"3a72740a-acdf-4f67-95f2-8349cb8309f6","facilityId":"30b8340f-34be-4d57-a8df-213239f3cb65","field":"record","value":"West Texas AI Infrastructure Campus","asOf":null,"sourceUrl":"https://www.datacenterdynamics.com/en/news/circe-energy-secures-2gw-of-natural-gas-capacity-for-west-texas-data-center-campus/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T04:47:07.745Z"},"status":{"id":"2cec0f3a-9af9-413e-a183-83b89fbd9ab2","facilityId":"30b8340f-34be-4d57-a8df-213239f3cb65","field":"status","value":"announced; 1,950-acre platform, starts 10 MW 2026 scaling to 1.1 GW by 2030","asOf":null,"sourceUrl":"https://www.datacenterdynamics.com/en/news/circe-energy-secures-2gw-of-natural-gas-capacity-for-west-texas-data-center-campus/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T04:47:07.745Z"}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"West Texas AI Infrastructure Campus","url":"https://registry.deploy.report/datacenters/facilities/circe-energy-west-texas-ai-infrastructure-campus-permian","address":{"@type":"PostalAddress","addressLocality":"Permian Basin"},"additionalProperty":[{"@type":"PropertyValue","name":"operator","value":"Circe Energy"}]}}