{"id":"96c72556-e6f0-440d-832c-80c6b88ea641","slug":"compass-red-oak-expansion-ellis-county-tx","name":"Compass Red Oak Campus Expansion (buildings 6-8)","aliases":[],"operatorCompanyId":"5afe3742-2b97-4907-82c6-daeb2158c910","parentCampusId":"43a07716-a21a-44dc-96de-1421aa5d186b","lat":32.5416551,"lng":-96.8022036,"streetAddress":"481 Austin Boulevard, Red Oak, TX","locationId":"f17d7a76-5c4c-47f8-9212-02fb349fac61","status":"planned","facilityType":"hyperscale","criticalItMw":null,"buildingSqft":251815,"yearOperational":null,"yearAnnounced":null,"servingUtility":"Oncor","wikidataId":null,"osmId":null,"dataSourceFamily":"c1_operator","locationPrecision":"exact","reviewStatus":"reviewed","sources":[{"url":"https://www.datacenterdynamics.com/en/news/compass-datacenters-looks-to-expand-red-oak-campus/"}],"notes":null,"createdAt":"2026-08-19T04:49:08.213Z","updatedAt":"2026-08-28T04:02:35.273Z","operator":{"name":"Compass Datacenters","slug":"compass-datacenters"},"parentCampus":{"id":"43a07716-a21a-44dc-96de-1421aa5d186b","slug":"compass-red-oak-dfw3-ellis-texas","name":"Compass Datacenters Red Oak Campus (DFW III)","aliases":["Compass DFW III","Red Oak Datacenter","DFW III-I"],"locationId":"f17d7a76-5c4c-47f8-9212-02fb349fac61","lat":32.540934,"lng":-96.80180215,"locationPrecision":"exact","landStatus":"private","lifecycleState":"partially_energized","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"ERCOT","waterSourceNotes":"Closed-loop water-cooling system that is not connected to the city utility line and, per city staff, uses less water annually than a Walmart Supercenter.","servingUtility":null,"acreage":300,"totalBuildingSqft":null,"streetAddress":null,"notes":"Compass Datacenters' Red Oak campus in Ellis County holds TCEQ operating permits (Red Oak Datacenter / DFW III) and is planned for ~360 MW across ~10 buildings on 300 acres; five buildings came online 2024-2025 fully leased to a single tenant, with three more added via a 2026 refinancing. The single tenant is not publicly named.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.connectcre.com/stories/compass-datacenters-lands-refi-on-5-red-oak-facilities-to-add-three-more/","date":"2026-01-01","title":"Compass Datacenters Lands Refi on 5 Red Oak Facilities to Add Three More","publisher":"Connect CRE"},{"url":"https://cleanview.co/data-centers/texas/787/dfw---red-oak","date":"2026-01-01","title":"DFW - Red Oak (facility profile)","publisher":"Cleanview"},{"url":"https://www.dallasobserver.com/news/red-oak-data-center-meets-community-resistance-40674118/","title":"Red Oak Data Center Meets Community Resistance","sourceName":"Dallas Observer"}],"reviewNote":null,"createdAt":"2026-08-17T20:23:55.277Z","updatedAt":"2026-08-28T14:22:23.508Z","parties":[{"id":"b07f10da-a036-4533-aeeb-215d0ce8d7b2","dataCenterId":"43a07716-a21a-44dc-96de-1421aa5d186b","companyId":"5afe3742-2b97-4907-82c6-daeb2158c910","externalName":"Compass Datacenters","role":"developer","structureNotes":"Entity Compass Datacenters DFW III, LLC","createdAt":"2026-08-17T20:23:56.511Z","company":{"id":"5afe3742-2b97-4907-82c6-daeb2158c910","name":"Compass Datacenters","slug":"compass-datacenters"}},{"id":"12360a4e-479a-40db-97e1-0ca9e9266b1f","dataCenterId":"43a07716-a21a-44dc-96de-1421aa5d186b","companyId":null,"externalName":"Hilco Electric Cooperative","role":"utility","structureNotes":"Grid power provider to the Red Oak (DFW III) campus at 300 Houston School Road; TCEQ Federal Operating Permit O4679","createdAt":"2026-08-19T00:15:40.769Z","company":null}],"financialClaims":[{"id":"2b098375-cc5f-49c3-a3c5-10cc1ed9a670","dataCenterId":"43a07716-a21a-44dc-96de-1421aa5d186b","kind":"capex","label":"DFW III expansion (up to 3 additional buildings)","valueUsd":"300000000","capUsd":null,"conditions":"Combined construction cost of up to three more facilities announced Sept 2024","asOf":"2024-09-27T00:00:00.000Z","sourceUrl":"https://therealdeal.com/texas/dallas/2024/09/27/compass-datacenters-invests-another-300m-south-of-dallas/","sourceType":"journalist_report","evidenceTier":"reported","createdAt":"2026-08-19T00:15:39.239Z"}],"metricClaims":[{"id":"eb9dd031-4ca6-46cb-9cf1-2cfa68edc6f9","dataCenterId":"43a07716-a21a-44dc-96de-1421aa5d186b","metricType":"cooling_type","valueNumeric":null,"valueText":"Air-cooled, N+1 redundancy","unit":null,"grantingJurisdiction":null,"asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://baxtel.com/data-center/compass-red-oak-campus","sourceType":"tracker","evidenceTier":"claimed","supersedesId":null,"note":null,"createdAt":"2026-08-19T00:15:40.008Z"}],"powerProjects":[],"capacityClaims":[{"id":"291171ba-3c0c-41be-8149-fd0c7ab5f707","dataCenterId":"43a07716-a21a-44dc-96de-1421aa5d186b","series":"announced","valueGw":0.36,"asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://cleanview.co/data-centers/texas/787/dfw---red-oak","sourceType":"tracker","evidenceTier":"claimed","supersedesId":null,"note":"Full buildout: 10 buildings, 360 MW, across ~300 acres (tracker)","createdAt":"2026-08-19T00:15:38.012Z"},{"id":"fd0cd86f-3aff-4dcf-9403-635690426aec","dataCenterId":"43a07716-a21a-44dc-96de-1421aa5d186b","series":"energized","valueGw":0.36,"asOf":"2026-01-01T00:00:00.000Z","sourceUrl":"https://cleanview.co/data-centers/texas/787/dfw---red-oak","sourceType":"permit","evidenceTier":"reported","supersedesId":null,"note":"360 MW planned full campus; portion already online","createdAt":"2026-08-17T20:23:55.968Z"},{"id":"223b68cc-f137-47e2-95b1-fefe9e6d6202","dataCenterId":"43a07716-a21a-44dc-96de-1421aa5d186b","series":"energized","valueGw":0.18,"asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://baxtel.com/data-center/compass-red-oak-campus","sourceType":"tracker","evidenceTier":"claimed","supersedesId":null,"note":"Five buildings online 2024-2025, single-tenant leased; ~180 MW existing per trackers","createdAt":"2026-08-19T00:15:38.852Z"}],"events":[{"id":"124b0318-20b1-47b4-a177-7c41c40b4bab","dataCenterId":"43a07716-a21a-44dc-96de-1421aa5d186b","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: Hilco Electric Cooperative","occurredAt":"2026-08-19T00:15:41.158Z","createdAt":"2026-08-19T00:15:41.158Z"},{"id":"f0a16e1e-d767-4b93-b017-4bb17fc6e54c","dataCenterId":"43a07716-a21a-44dc-96de-1421aa5d186b","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: DFW III expansion (up to 3 additional buildings)","occurredAt":"2026-08-19T00:15:39.627Z","createdAt":"2026-08-19T00:15:39.627Z"},{"id":"d8acb0e4-e594-46be-8831-33b4bfdfb8c0","dataCenterId":"43a07716-a21a-44dc-96de-1421aa5d186b","eventType":"claim_recorded","series":"energized","oldValue":null,"newValue":"0.18","claimId":"223b68cc-f137-47e2-95b1-fefe9e6d6202","detail":"claimed · tracker","occurredAt":"2026-08-19T00:15:39.006Z","createdAt":"2026-08-19T00:15:39.006Z"},{"id":"69cf3092-ca30-4e28-8484-35e19dbe245f","dataCenterId":"43a07716-a21a-44dc-96de-1421aa5d186b","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"0.36","claimId":"291171ba-3c0c-41be-8149-fd0c7ab5f707","detail":null,"occurredAt":"2026-08-19T00:15:38.312Z","createdAt":"2026-08-19T00:15:38.312Z"},{"id":"068d0dd5-02e0-4ead-8a9e-d65c43f6b265","dataCenterId":"43a07716-a21a-44dc-96de-1421aa5d186b","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"0.36","claimId":"291171ba-3c0c-41be-8149-fd0c7ab5f707","detail":"claimed · tracker","occurredAt":"2026-08-19T00:15:38.162Z","createdAt":"2026-08-19T00:15:38.162Z"},{"id":"a788652a-bfb8-4f54-9b26-5d9defd9312d","dataCenterId":"43a07716-a21a-44dc-96de-1421aa5d186b","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: Compass Datacenters","occurredAt":"2026-08-17T20:23:56.899Z","createdAt":"2026-08-17T20:23:56.899Z"},{"id":"46f5f538-39e8-44ba-9954-e39afd660037","dataCenterId":"43a07716-a21a-44dc-96de-1421aa5d186b","eventType":"capacity_changed","series":"energized","oldValue":null,"newValue":"0.36","claimId":"fd0cd86f-3aff-4dcf-9403-635690426aec","detail":null,"occurredAt":"2026-08-17T20:23:56.278Z","createdAt":"2026-08-17T20:23:56.278Z"},{"id":"8f64eac5-4739-456e-9a38-8ae0a44dbd5d","dataCenterId":"43a07716-a21a-44dc-96de-1421aa5d186b","eventType":"claim_recorded","series":"energized","oldValue":null,"newValue":"0.36","claimId":"fd0cd86f-3aff-4dcf-9403-635690426aec","detail":"reported · permit","occurredAt":"2026-08-17T20:23:56.127Z","createdAt":"2026-08-17T20:23:56.127Z"}]},"location":{"name":"Red Oak","slug":"red-oak-texas","kind":"city","lat":32.5143898,"lng":-96.8066615},"evidence":[{"id":"fa3896fe-cb99-4c31-a930-fb4bacaf9aab","facilityId":"96c72556-e6f0-440d-832c-80c6b88ea641","field":"buildingSqft","value":"251815","asOf":null,"sourceUrl":"https://baxtel.com/data-center/compass-red-oak-ii-7f9d6bd6-817f-4a3f-8dbf-fdfa5beada8c","sourceType":"operator","tier":"reported","note":"Building 2 of the existing Red Oak campus","createdAt":"2026-08-21T14:29:18.503Z"},{"id":"020f8ca4-bc35-4014-9e5a-cbedc7734c15","facilityId":"96c72556-e6f0-440d-832c-80c6b88ea641","field":"record","value":"Compass Red Oak Campus Expansion (buildings 6-8)","asOf":null,"sourceUrl":"https://www.datacenterdynamics.com/en/news/compass-datacenters-looks-to-expand-red-oak-campus/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T04:49:08.599Z"},{"id":"be6a544d-f33c-45ed-bcc8-6657c55e5e14","facilityId":"96c72556-e6f0-440d-832c-80c6b88ea641","field":"servingUtility","value":"Oncor","asOf":null,"sourceUrl":"https://www.connectcre.com/stories/compass-datacenters-lands-refi-on-5-red-oak-facilities-to-add-three-more/","sourceType":"operator","tier":"reported","note":null,"createdAt":"2026-08-21T00:26:20.748Z"},{"id":"80decf19-a3a9-447c-b535-37c911eafe77","facilityId":"96c72556-e6f0-440d-832c-80c6b88ea641","field":"status","value":"planned; three additional facilities added to campus ($300M)","asOf":null,"sourceUrl":"https://www.datacenterdynamics.com/en/news/compass-datacenters-looks-to-expand-red-oak-campus/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T04:49:08.599Z"},{"id":"89df69a9-0694-4c66-b190-0f24d0519572","facilityId":"96c72556-e6f0-440d-832c-80c6b88ea641","field":"streetAddress","value":"481 Austin Boulevard, Red Oak, TX","asOf":null,"sourceUrl":"https://baxtel.com/data-center/compass-red-oak-ii-7f9d6bd6-817f-4a3f-8dbf-fdfa5beada8c","sourceType":"operator","tier":"reported","note":null,"createdAt":"2026-08-21T14:29:18.899Z"}],"resolved_facts":{"buildingSqft":{"id":"fa3896fe-cb99-4c31-a930-fb4bacaf9aab","facilityId":"96c72556-e6f0-440d-832c-80c6b88ea641","field":"buildingSqft","value":"251815","asOf":null,"sourceUrl":"https://baxtel.com/data-center/compass-red-oak-ii-7f9d6bd6-817f-4a3f-8dbf-fdfa5beada8c","sourceType":"operator","tier":"reported","note":"Building 2 of the existing Red Oak campus","createdAt":"2026-08-21T14:29:18.503Z"},"record":{"id":"020f8ca4-bc35-4014-9e5a-cbedc7734c15","facilityId":"96c72556-e6f0-440d-832c-80c6b88ea641","field":"record","value":"Compass Red Oak Campus Expansion (buildings 6-8)","asOf":null,"sourceUrl":"https://www.datacenterdynamics.com/en/news/compass-datacenters-looks-to-expand-red-oak-campus/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T04:49:08.599Z"},"servingUtility":{"id":"be6a544d-f33c-45ed-bcc8-6657c55e5e14","facilityId":"96c72556-e6f0-440d-832c-80c6b88ea641","field":"servingUtility","value":"Oncor","asOf":null,"sourceUrl":"https://www.connectcre.com/stories/compass-datacenters-lands-refi-on-5-red-oak-facilities-to-add-three-more/","sourceType":"operator","tier":"reported","note":null,"createdAt":"2026-08-21T00:26:20.748Z"},"status":{"id":"80decf19-a3a9-447c-b535-37c911eafe77","facilityId":"96c72556-e6f0-440d-832c-80c6b88ea641","field":"status","value":"planned; three additional facilities added to campus ($300M)","asOf":null,"sourceUrl":"https://www.datacenterdynamics.com/en/news/compass-datacenters-looks-to-expand-red-oak-campus/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T04:49:08.599Z"},"streetAddress":{"id":"89df69a9-0694-4c66-b190-0f24d0519572","facilityId":"96c72556-e6f0-440d-832c-80c6b88ea641","field":"streetAddress","value":"481 Austin Boulevard, Red Oak, TX","asOf":null,"sourceUrl":"https://baxtel.com/data-center/compass-red-oak-ii-7f9d6bd6-817f-4a3f-8dbf-fdfa5beada8c","sourceType":"operator","tier":"reported","note":null,"createdAt":"2026-08-21T14:29:18.899Z"}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Compass Red Oak Campus Expansion (buildings 6-8)","url":"https://registry.deploy.report/datacenters/facilities/compass-red-oak-expansion-ellis-county-tx","geo":{"@type":"GeoCoordinates","latitude":32.5416551,"longitude":-96.8022036},"address":{"@type":"PostalAddress","addressLocality":"Red Oak","streetAddress":"481 Austin Boulevard, Red Oak, TX"},"additionalProperty":[{"@type":"PropertyValue","name":"operator","value":"Compass Datacenters"}]}}