{"id":"b79e630d-8393-4fe0-9db6-f97481e9410b","slug":"copia-power-mason-valley-nv","name":"Copia Power Mason Valley Data Center Campus","aliases":[],"operatorCompanyId":"9c229ee1-0ff8-4195-ab94-e5609923e819","parentCampusId":null,"lat":null,"lng":null,"streetAddress":null,"locationId":"c99f1089-6047-4730-81ef-4ee1fd5f92f4","status":"planned","facilityType":"hyperscale","criticalItMw":null,"buildingSqft":4600000,"yearOperational":null,"yearAnnounced":null,"servingUtility":null,"wikidataId":null,"osmId":null,"dataSourceFamily":"c1_operator","locationPrecision":"city","reviewStatus":"reviewed","sources":[{"url":"https://thenevadaindependent.com/article/a-massive-data-center-in-rural-nevada-is-one-step-closer-to-being-built"}],"notes":null,"createdAt":"2026-08-19T23:58:09.498Z","updatedAt":"2026-08-20T00:10:07.718Z","operator":{"name":"Copia Power","slug":"copia-power"},"parentCampus":null,"location":{"name":"Yerington","slug":"yerington-nevada","kind":"city","lat":38.9855429,"lng":-119.162989},"evidence":[{"id":"48f8beca-077f-4a2e-a7cd-4a6054228b4a","facilityId":"b79e630d-8393-4fe0-9db6-f97481e9410b","field":"building_sqft","value":"4600000","asOf":null,"sourceUrl":"https://thenevadaindependent.com/article/a-massive-data-center-in-rural-nevada-is-one-step-closer-to-being-built","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T23:58:09.961Z"},{"id":"001a5d85-0011-4fff-a43f-6e0a8913d79a","facilityId":"b79e630d-8393-4fe0-9db6-f97481e9410b","field":"record","value":"Copia Power Mason Valley Data Center Campus","asOf":null,"sourceUrl":"https://thenevadaindependent.com/article/a-massive-data-center-in-rural-nevada-is-one-step-closer-to-being-built","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T23:58:09.961Z"},{"id":"fb2c528e-d02e-4bdf-b77e-9bb00ffb3809","facilityId":"b79e630d-8393-4fe0-9db6-f97481e9410b","field":"status","value":"planned (~505 acres in Mason Valley; up to 1,000 MW with on-site gas backup and battery storage)","asOf":null,"sourceUrl":"https://thenevadaindependent.com/article/a-massive-data-center-in-rural-nevada-is-one-step-closer-to-being-built","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T23:58:09.961Z"}],"resolved_facts":{"building_sqft":{"id":"48f8beca-077f-4a2e-a7cd-4a6054228b4a","facilityId":"b79e630d-8393-4fe0-9db6-f97481e9410b","field":"building_sqft","value":"4600000","asOf":null,"sourceUrl":"https://thenevadaindependent.com/article/a-massive-data-center-in-rural-nevada-is-one-step-closer-to-being-built","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T23:58:09.961Z"},"record":{"id":"001a5d85-0011-4fff-a43f-6e0a8913d79a","facilityId":"b79e630d-8393-4fe0-9db6-f97481e9410b","field":"record","value":"Copia Power Mason Valley Data Center Campus","asOf":null,"sourceUrl":"https://thenevadaindependent.com/article/a-massive-data-center-in-rural-nevada-is-one-step-closer-to-being-built","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T23:58:09.961Z"},"status":{"id":"fb2c528e-d02e-4bdf-b77e-9bb00ffb3809","facilityId":"b79e630d-8393-4fe0-9db6-f97481e9410b","field":"status","value":"planned (~505 acres in Mason Valley; up to 1,000 MW with on-site gas backup and battery storage)","asOf":null,"sourceUrl":"https://thenevadaindependent.com/article/a-massive-data-center-in-rural-nevada-is-one-step-closer-to-being-built","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T23:58:09.961Z"}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Copia Power Mason Valley Data Center Campus","url":"https://registry.deploy.report/datacenters/facilities/copia-power-mason-valley-nv","address":{"@type":"PostalAddress","addressLocality":"Yerington"},"additionalProperty":[{"@type":"PropertyValue","name":"operator","value":"Copia Power"}]}}