{"id":"f96ef9ee-f63f-4b75-9c8f-0287956fc808","slug":"corescientific-muskogee-muskogee-oklahoma","name":"Core Scientific Muskogee 1","aliases":["Muskogee 1"],"operatorCompanyId":"9c495c76-08a8-4b58-85d8-45072060a018","parentCampusId":"6db978fa-8c95-4c64-96a1-0a4271e38943","lat":null,"lng":null,"streetAddress":null,"locationId":"8a69ab06-60f0-4b10-9ad9-74b6543df3ba","status":"operating","facilityType":"crypto_hpc","criticalItMw":null,"buildingSqft":null,"yearOperational":null,"yearAnnounced":null,"servingUtility":null,"wikidataId":null,"osmId":null,"dataSourceFamily":"c1_operator","locationPrecision":"city","reviewStatus":"reviewed","sources":[{"url":"https://corescientific.com/high-density-data-centers/"}],"notes":null,"createdAt":"2026-08-18T14:41:29.840Z","updatedAt":"2026-08-28T04:02:31.438Z","operator":{"name":"Core Scientific","slug":"core-scientific"},"parentCampus":{"id":"6db978fa-8c95-4c64-96a1-0a4271e38943","slug":"coreweave-core-scientific-muskogee-oklahoma","name":"Core Scientific / CoreWeave Muskogee HPC Campus","aliases":[],"locationId":"8a69ab06-60f0-4b10-9ad9-74b6543df3ba","lat":35.69694,"lng":-95.38558,"locationPrecision":"exact","landStatus":"private","lifecycleState":"under_construction","powerSourceMix":"grid","interconnectionQueueStatus":"Served by Oklahoma Gas & Electric. Core Scientific announced on 7 May 2026 that it is buying Polaris Technologies for about $421 million in cash, bringing 440 MW of gross power already contracted with OG&E and an on-site substation with it.","interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"SPP","waterSourceNotes":"Not published. Core Scientific's own page for the site talks about power, connectivity and expansion room, and mentions cooling only as one of the things the facility provides. It names no cooling method, water source or volume.","servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Core Scientific, CoreWeave and Port Muskogee broke ground in November 2024 on an initial 100 MW HPC data center for Nvidia GPU hosting under a CoreWeave lease. In 2025 Core Scientific outlined scaling the Muskogee campus to roughly 1.5 GW gross (about 1.0 GW leasable). CoreWeave's total contracted HPC hosting with Core Scientific across six sites is about 590 MW with a stated contract value near $8.7 billion.","keyFacts":[{"label":"Location / partners","value":"Port Muskogee, Oklahoma HPC campus developed by Core Scientific for CoreWeave GPU hosting; groundbreaking with Port Muskogee on Nov 18 2024 ([Core Scientific press release](https://investors.corescientific.com/news-events/press-releases/detail/99/core-scientific-and-port-muskogee-break-ground-on-100-mw-hpc-data-center))","sourceUrl":"https://investors.corescientific.com/news-events/press-releases/detail/99/core-scientific-and-port-muskogee-break-ground-on-100-mw-hpc-data-center"},{"label":"Initial building capacity (announced)","value":"100 MW facility with about 70 MW critical IT load for NVIDIA GPUs and about 30 MW for ancillary systems; expected operational in 2026 at groundbreaking ([Core Scientific, Nov 18 2024](https://investors.corescientific.com/news-events/press-releases/detail/99/core-scientific-and-port-muskogee-break-ground-on-100-mw-hpc-data-center))","sourceUrl":"https://investors.corescientific.com/news-events/press-releases/detail/99/core-scientific-and-port-muskogee-break-ground-on-100-mw-hpc-data-center"},{"label":"Tenant / contract context","value":"Hosts CoreWeave NVIDIA GPUs for an undisclosed client. Muskogee is part of CoreWeave contracted HPC hosting from Core Scientific totaling 500 MW critical IT load, with stated potential contract value of $8.7B over 12-year contracts (each with two five-year options) ([Core Scientific, Nov 18 2024](https://investors.corescientific.com/news-events/press-releases/detail/99/core-scientific-and-port-muskogee-break-ground-on-100-mw-hpc-data-center))","sourceUrl":"https://investors.corescientific.com/news-events/press-releases/detail/99/core-scientific-and-port-muskogee-break-ground-on-100-mw-hpc-data-center"},{"label":"Campus scale plan (announced)","value":"May 2026 Core Scientific plan to scale Muskogee to about 1.5 GW gross power / about 1.0 GW leasable, with roughly 250 acres secured ([Core Scientific, May 6 2026](https://investors.corescientific.com/news-events/press-releases/detail/135/core-scientific-plans-expansion-to-1-5-gigawatts-of-gross-power-at-muskogee-oklahoma-campus))","sourceUrl":"https://investors.corescientific.com/news-events/press-releases/detail/135/core-scientific-plans-expansion-to-1-5-gigawatts-of-gross-power-at-muskogee-oklahoma-campus"},{"label":"Polaris DS acquisition (announced)","value":"Agreement to acquire Polaris DS LLC with 440 MW gross power contracted under an Oklahoma Gas & Electric energy agreement; close targeted Q3 2026 subject to approvals ([Core Scientific, May 6 2026](https://investors.corescientific.com/news-events/press-releases/detail/135/core-scientific-plans-expansion-to-1-5-gigawatts-of-gross-power-at-muskogee-oklahoma-campus))","sourceUrl":"https://investors.corescientific.com/news-events/press-releases/detail/135/core-scientific-plans-expansion-to-1-5-gigawatts-of-gross-power-at-muskogee-oklahoma-campus"},{"label":"Delivery milestones (company)","value":"Leased 70 MW building (NVIDIA GB300 platform) was on track for Q2 2026 customer delivery as of May 2026; second unleased 82.5 MW building under construction with initial delivery targeted Q4 2027 ([Core Scientific, May 6 2026](https://investors.corescientific.com/news-events/press-releases/detail/135/core-scientific-plans-expansion-to-1-5-gigawatts-of-gross-power-at-muskogee-oklahoma-campus))","sourceUrl":"https://investors.corescientific.com/news-events/press-releases/detail/135/core-scientific-plans-expansion-to-1-5-gigawatts-of-gross-power-at-muskogee-oklahoma-campus"},{"label":"Local economic claim (announced)","value":"Port Muskogee / company materials cite more than $4B capital investment and about $182M local net benefits over the project life, plus about 150 jobs ([Core Scientific, Nov 18 2024](https://investors.corescientific.com/news-events/press-releases/detail/99/core-scientific-and-port-muskogee-break-ground-on-100-mw-hpc-data-center))","sourceUrl":"https://investors.corescientific.com/news-events/press-releases/detail/99/core-scientific-and-port-muskogee-break-ground-on-100-mw-hpc-data-center"}],"reviewStatus":"reviewed","sources":[{"url":"https://www.datacenterdynamics.com/en/news/coreweave-and-core-scientific-break-ground-on-100mw-data-center-in-muskogee-oklahoma/","title":"DCD: CoreWeave and Core Scientific break ground in Muskogee"},{"url":"https://www.okcommerce.gov/core-scientific-and-port-muskogee-break-ground-on-100-mw-hpc-data-center/","title":"Oklahoma Commerce: Muskogee 100 MW HPC groundbreaking"},{"url":"https://blockspace.media/insight/core-scientific-jumps-7-in-morning-markets-as-data-center-firm-announces-440-mw-expansion-at-oklahoma-site/","title":"Blockspace: Core Scientific Oklahoma expansion"},{"url":"https://www.gem.wiki/Muskogee_Data_Center_power_station","title":"Muskogee Data Center power station","sourceName":"Global Energy Monitor"},{"url":"https://www.datacenterdynamics.com/en/news/core-scientific-acquires-cryptomine-in-muskogee-to-expand-ai-data-center-campus/","title":"Core Scientific acquires cryptomine in Muskogee to expand AI data center campus","sourceName":"Data Center Dynamics"},{"url":"https://energy.media/energy-deals/core-scientific-acquires-polaris-technologies-440-mw-grid-connection/","title":"Core Scientific Acquires Polaris Technologies & 440 MW Grid Connection","sourceName":"Energy.Media"},{"url":"https://corescientific.com/high-density-data-centers/muskogee-ok/","title":"Oklahoma Data Center | High-Density in Muskogee","sourceName":"Core Scientific"},{"url":"https://investors.corescientific.com/news-events/press-releases/detail/99/core-scientific-and-port-muskogee-break-ground-on-100-mw-hpc-data-center","date":"2024-11-18","title":"Core Scientific and Port Muskogee Break Ground on 100 MW HPC Data Center","publisher":"Core Scientific"},{"url":"https://investors.corescientific.com/news-events/press-releases/detail/135/core-scientific-plans-expansion-to-1-5-gigawatts-of-gross-power-at-muskogee-oklahoma-campus","date":"2026-05-06","title":"Core Scientific Plans Expansion to 1.5 GW Gross Power at Muskogee Campus","publisher":"Core Scientific"}],"reviewNote":null,"createdAt":"2026-08-19T00:48:11.445Z","updatedAt":"2026-09-28T06:34:21.841Z","parties":[{"id":"0d1b6097-0cd2-4799-b17c-fd00e93009cb","dataCenterId":"6db978fa-8c95-4c64-96a1-0a4271e38943","companyId":"9c495c76-08a8-4b58-85d8-45072060a018","externalName":null,"role":"developer","structureNotes":"Site developer and operator","createdAt":"2026-08-19T00:48:15.093Z","company":{"id":"9c495c76-08a8-4b58-85d8-45072060a018","name":"Core Scientific","slug":"core-scientific"}},{"id":"da521fdf-d6b7-46e0-b833-d64e8f014692","dataCenterId":"6db978fa-8c95-4c64-96a1-0a4271e38943","companyId":null,"externalName":"Port Muskogee","role":"land_owner","structureNotes":"Industrial park / port authority partner","createdAt":"2026-08-19T00:48:17.458Z","company":null},{"id":"971ff8b6-476c-467e-8417-0e28e6f1ff2f","dataCenterId":"6db978fa-8c95-4c64-96a1-0a4271e38943","companyId":"a9609061-00fd-4d9b-9b2d-ce2d772ab825","externalName":null,"role":"chip_supplier","structureNotes":"GPUs hosted for CoreWeave","createdAt":"2026-08-19T01:32:58.083Z","company":{"id":"a9609061-00fd-4d9b-9b2d-ce2d772ab825","name":"NVIDIA","slug":"nvidia"}},{"id":"a8457180-75df-43a7-9906-636bb937efbd","dataCenterId":"6db978fa-8c95-4c64-96a1-0a4271e38943","companyId":"da8eb3b3-8b7c-41f0-96cc-9f700a57bfca","externalName":"CoreWeave","role":"tenant","structureNotes":"HPC hosting lessee for Nvidia GPU compute","createdAt":"2026-08-19T00:48:16.314Z","company":{"id":"da8eb3b3-8b7c-41f0-96cc-9f700a57bfca","name":"CoreWeave","slug":"coreweave"}}],"financialClaims":[{"id":"c3b7afe9-12f1-4222-ad5e-9a9a9cc46c32","dataCenterId":"6db978fa-8c95-4c64-96a1-0a4271e38943","kind":"capex","label":"CoreWeave HPC hosting contracts with Core Scientific (portfolio, not Muskogee alone)","valueUsd":"8700000000","capUsd":null,"conditions":"~$8.7B potential value over 12-year contracts across six sites; ~590 MW total contracted","asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/coreweave-and-core-scientific-break-ground-on-100mw-data-center-in-muskogee-oklahoma/","sourceType":"journalist_report","evidenceTier":"reported","createdAt":"2026-08-19T00:48:13.944Z"},{"id":"89553fc8-d73a-4b2c-916b-847d77f03a50","dataCenterId":"6db978fa-8c95-4c64-96a1-0a4271e38943","kind":"capex","label":"Total capital investment","valueUsd":"4000000000","capUsd":null,"conditions":"Core Scientific IR: 'more than $4 billion in capital investment'","asOf":"2024-06-01T00:00:00.000Z","sourceUrl":"https://investors.corescientific.com/news-events/press-releases/detail/99/core-scientific-and-port-muskogee-break-ground-on-100-mw-hpc-data-center","sourceType":"company_filing","evidenceTier":"verified","createdAt":"2026-08-19T01:32:56.161Z"}],"metricClaims":[{"id":"2d89930e-5404-489e-9983-71d640b4c226","dataCenterId":"6db978fa-8c95-4c64-96a1-0a4271e38943","metricType":"capex_usd","valueNumeric":8700000000,"valueText":"CoreWeave 500 MW hosting contract valued at $8.7B over 12-year terms (each with two 5-year options); Muskogee is one facility within it","unit":null,"grantingJurisdiction":null,"asOf":"2024-06-01T00:00:00.000Z","sourceUrl":"https://investors.corescientific.com/news-events/press-releases/detail/99/core-scientific-and-port-muskogee-break-ground-on-100-mw-hpc-data-center","sourceType":"company_filing","evidenceTier":"verified","supersedesId":null,"note":null,"createdAt":"2026-08-19T01:32:57.297Z"},{"id":"a9a0bde1-61fe-4c1b-8a17-b46c6c5864d5","dataCenterId":"6db978fa-8c95-4c64-96a1-0a4271e38943","metricType":"jobs_permanent","valueNumeric":150,"valueText":"150 jobs, average salaries exceeding $65,000","unit":null,"grantingJurisdiction":null,"asOf":"2024-06-01T00:00:00.000Z","sourceUrl":"https://investors.corescientific.com/news-events/press-releases/detail/99/core-scientific-and-port-muskogee-break-ground-on-100-mw-hpc-data-center","sourceType":"company_filing","evidenceTier":"verified","supersedesId":null,"note":null,"createdAt":"2026-08-19T01:32:56.919Z"}],"powerProjects":[],"capacityClaims":[{"id":"6fde0130-41e7-4fe5-9702-bfd6bab16425","dataCenterId":"6db978fa-8c95-4c64-96a1-0a4271e38943","series":"announced","valueGw":1.5,"asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://blockspace.media/insight/core-scientific-jumps-7-in-morning-markets-as-data-center-firm-announces-440-mw-expansion-at-oklahoma-site/","sourceType":"journalist_report","evidenceTier":"claimed","supersedesId":null,"note":"Plan to scale campus to ~1.5 GW gross (~1.0 GW leasable)","createdAt":"2026-08-19T00:48:13.411Z"},{"id":"af39be87-048d-4d48-8d97-53f77dfd20a3","dataCenterId":"6db978fa-8c95-4c64-96a1-0a4271e38943","series":"under_construction","valueGw":0.07,"asOf":"2024-11-18T00:00:00.000Z","sourceUrl":"https://investors.corescientific.com/news-events/press-releases/detail/99/core-scientific-and-port-muskogee-break-ground-on-100-mw-hpc-data-center","sourceType":"company_filing","evidenceTier":"verified","supersedesId":null,"note":"~70 MW critical IT load for NVIDIA GPUs; 100 MW total (30 MW ancillary). Groundbreaking Nov 2024, operational 2026.","createdAt":"2026-08-19T01:32:55.622Z"},{"id":"17a28dbf-e745-4f26-a973-d5b3a18b290d","dataCenterId":"6db978fa-8c95-4c64-96a1-0a4271e38943","series":"under_construction","valueGw":0.1,"asOf":"2024-06-01T00:00:00.000Z","sourceUrl":"https://www.okcommerce.gov/core-scientific-and-port-muskogee-break-ground-on-100-mw-hpc-data-center/","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"Initial 100 MW HPC data center at groundbreaking","createdAt":"2026-08-19T00:48:12.562Z"}],"events":[{"id":"7ea02733-b7a8-4e9a-9baf-cff790089af1","dataCenterId":"6db978fa-8c95-4c64-96a1-0a4271e38943","eventType":"party_linked","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"tenant: linked externalName \"CoreWeave\" to company coreweave","occurredAt":"2026-08-31T01:15:14.717Z","createdAt":"2026-08-31T01:15:14.717Z"},{"id":"f5200021-1554-4351-90ef-1190bfcea717","dataCenterId":"6db978fa-8c95-4c64-96a1-0a4271e38943","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"chip_supplier: a9609061-00fd-4d9b-9b2d-ce2d772ab825","occurredAt":"2026-08-19T01:32:58.461Z","createdAt":"2026-08-19T01:32:58.461Z"},{"id":"bf763311-0efd-4ee6-8686-7dae12def2a0","dataCenterId":"6db978fa-8c95-4c64-96a1-0a4271e38943","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: Total capital investment","occurredAt":"2026-08-19T01:32:56.539Z","createdAt":"2026-08-19T01:32:56.539Z"},{"id":"22fab5aa-6440-4b0b-a465-80b14dac3113","dataCenterId":"6db978fa-8c95-4c64-96a1-0a4271e38943","eventType":"capacity_changed","series":"under_construction","oldValue":"0.1","newValue":"0.07","claimId":"af39be87-048d-4d48-8d97-53f77dfd20a3","detail":null,"occurredAt":"2026-08-19T01:32:55.933Z","createdAt":"2026-08-19T01:32:55.933Z"},{"id":"774786a1-befd-4247-b502-027bf0f93946","dataCenterId":"6db978fa-8c95-4c64-96a1-0a4271e38943","eventType":"claim_recorded","series":"under_construction","oldValue":null,"newValue":"0.07","claimId":"af39be87-048d-4d48-8d97-53f77dfd20a3","detail":"verified · company_filing","occurredAt":"2026-08-19T01:32:55.780Z","createdAt":"2026-08-19T01:32:55.780Z"},{"id":"7c1fe8e6-7196-4749-9693-9807d062b319","dataCenterId":"6db978fa-8c95-4c64-96a1-0a4271e38943","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"land_owner: Port Muskogee","occurredAt":"2026-08-19T00:48:17.841Z","createdAt":"2026-08-19T00:48:17.841Z"},{"id":"f0792c28-e99e-4036-945e-397150634da0","dataCenterId":"6db978fa-8c95-4c64-96a1-0a4271e38943","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"tenant: CoreWeave","occurredAt":"2026-08-19T00:48:16.691Z","createdAt":"2026-08-19T00:48:16.691Z"},{"id":"ea079705-96b3-4581-8e19-9c96fcd136cd","dataCenterId":"6db978fa-8c95-4c64-96a1-0a4271e38943","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: 9c495c76-08a8-4b58-85d8-45072060a018","occurredAt":"2026-08-19T00:48:15.475Z","createdAt":"2026-08-19T00:48:15.475Z"},{"id":"57c807e3-73ef-4cc4-87f5-5d4e7f4d171b","dataCenterId":"6db978fa-8c95-4c64-96a1-0a4271e38943","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: CoreWeave HPC hosting contracts with Core Scientific (portfolio, not Muskogee alone)","occurredAt":"2026-08-19T00:48:14.326Z","createdAt":"2026-08-19T00:48:14.326Z"},{"id":"6530a0b8-f9ea-43aa-8edb-e8801ed74130","dataCenterId":"6db978fa-8c95-4c64-96a1-0a4271e38943","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"1.5","claimId":"6fde0130-41e7-4fe5-9702-bfd6bab16425","detail":null,"occurredAt":"2026-08-19T00:48:13.716Z","createdAt":"2026-08-19T00:48:13.716Z"},{"id":"bb0240ea-94a8-422a-9c03-1cf56a8bbc18","dataCenterId":"6db978fa-8c95-4c64-96a1-0a4271e38943","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"1.5","claimId":"6fde0130-41e7-4fe5-9702-bfd6bab16425","detail":"claimed · journalist_report","occurredAt":"2026-08-19T00:48:13.565Z","createdAt":"2026-08-19T00:48:13.565Z"},{"id":"b873f551-1b34-4e47-846b-091e170a1487","dataCenterId":"6db978fa-8c95-4c64-96a1-0a4271e38943","eventType":"capacity_changed","series":"under_construction","oldValue":null,"newValue":"0.1","claimId":"17a28dbf-e745-4f26-a973-d5b3a18b290d","detail":null,"occurredAt":"2026-08-19T00:48:12.871Z","createdAt":"2026-08-19T00:48:12.871Z"},{"id":"e1e4332a-ddb5-46b3-b037-176e5823981b","dataCenterId":"6db978fa-8c95-4c64-96a1-0a4271e38943","eventType":"claim_recorded","series":"under_construction","oldValue":null,"newValue":"0.1","claimId":"17a28dbf-e745-4f26-a973-d5b3a18b290d","detail":"reported · press_release","occurredAt":"2026-08-19T00:48:12.716Z","createdAt":"2026-08-19T00:48:12.716Z"}]},"location":{"name":"Muskogee","slug":"muskogee-oklahoma","kind":"city","lat":35.6630196,"lng":-95.3927706},"evidence":[{"id":"e9b71464-9bab-422b-b88d-74bb767bbcf1","facilityId":"f96ef9ee-f63f-4b75-9c8f-0287956fc808","field":"note","value":"Listed among Core Scientific's US sites; per-site MW not disclosed on operator page","asOf":null,"sourceUrl":"https://corescientific.com/high-density-data-centers/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-18T14:41:30.286Z"},{"id":"3b0aef5d-9047-4f32-9b68-d1524cdc74df","facilityId":"f96ef9ee-f63f-4b75-9c8f-0287956fc808","field":"record","value":"Core Scientific Muskogee 1","asOf":null,"sourceUrl":"https://corescientific.com/high-density-data-centers/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-18T14:41:30.286Z"}],"resolved_facts":{"note":{"id":"e9b71464-9bab-422b-b88d-74bb767bbcf1","facilityId":"f96ef9ee-f63f-4b75-9c8f-0287956fc808","field":"note","value":"Listed among Core Scientific's US sites; per-site MW not disclosed on operator page","asOf":null,"sourceUrl":"https://corescientific.com/high-density-data-centers/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-18T14:41:30.286Z"},"record":{"id":"3b0aef5d-9047-4f32-9b68-d1524cdc74df","facilityId":"f96ef9ee-f63f-4b75-9c8f-0287956fc808","field":"record","value":"Core Scientific Muskogee 1","asOf":null,"sourceUrl":"https://corescientific.com/high-density-data-centers/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-18T14:41:30.286Z"}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Core Scientific Muskogee 1","url":"https://registry.deploy.report/datacenters/facilities/corescientific-muskogee-muskogee-oklahoma","address":{"@type":"PostalAddress","addressLocality":"Muskogee"},"additionalProperty":[{"@type":"PropertyValue","name":"operator","value":"Core Scientific"}]}}