{"id":"99186cd1-a777-407b-b2e8-79b9ad874830","slug":"edgeconnex-new-albany-oh","name":"EdgeConneX New Albany","aliases":[],"operatorCompanyId":"09b19842-f22b-4352-bb21-f8bfe05e6ef6","parentCampusId":"e3275f41-fe39-4e59-9e65-90b39478283d","lat":40.0886326,"lng":-82.7452472,"streetAddress":"9850 Innovation Campus Way, New Albany, OH","locationId":"c8245e03-38b0-4243-9753-af44aa940c35","status":"announced","facilityType":"colocation","criticalItMw":null,"buildingSqft":524525,"yearOperational":null,"yearAnnounced":null,"servingUtility":null,"wikidataId":null,"osmId":null,"dataSourceFamily":"c1_operator","locationPrecision":"exact","reviewStatus":"reviewed","sources":[{"url":"https://www.edgeconnex.com/americas/"}],"notes":null,"createdAt":"2026-08-19T02:53:32.482Z","updatedAt":"2026-08-28T04:02:36.037Z","operator":{"name":"EdgeConneX","slug":"edgeconnex"},"parentCampus":{"id":"e3275f41-fe39-4e59-9e65-90b39478283d","slug":"edgeconnex-pcx-new-albany-ohio","name":"EdgeConneX / PowerConneX New Albany Energy Center","aliases":["PCX New Albany Energy Center","PowerConneX New Albany"],"locationId":"c8245e03-38b0-4243-9753-af44aa940c35","lat":40.08,"lng":-82.79,"locationPrecision":"exact","landStatus":"greenfield","lifecycleState":"under_construction","powerSourceMix":"behind_the_meter_gas","interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"PJM","waterSourceNotes":null,"servingUtility":null,"acreage":48.6,"totalBuildingSqft":null,"streetAddress":null,"notes":"Co-located EdgeConneX data center powered by an on-site, off-grid PowerConneX gas plant in the New Albany International Business Park, Licking County. Ohio Power Siting Board certificated Phase 1 (up to 140 MW) and Phase 2 (up to 216 MW plus battery storage). The data center's own IT load, building count, and end tenant are not disclosed; coordinates are town-level approximate.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.edgeconnex.com/pcx-new-albany-energy-center/","date":"2025-07-22","title":"PCX New Albany Energy Center","publisher":"EdgeConneX"},{"url":"https://www.farmanddairy.com/news/opsb-approves-natural-gas-plant-to-power-data-center-in-licking-county/899062.html","date":"2025-11-21","title":"OPSB approves natural gas plant to power data center in Licking County","publisher":"Farm and Dairy"}],"reviewNote":null,"createdAt":"2026-08-17T20:20:57.220Z","updatedAt":"2026-08-28T14:22:23.508Z","parties":[{"id":"9e2ab018-af4f-4938-ab25-d9f205596dc5","dataCenterId":"e3275f41-fe39-4e59-9e65-90b39478283d","companyId":"09b19842-f22b-4352-bb21-f8bfe05e6ef6","externalName":"EdgeConneX, Inc.","role":"operator","structureNotes":"data center operator / power offtaker","createdAt":"2026-08-17T20:20:58.371Z","company":{"id":"09b19842-f22b-4352-bb21-f8bfe05e6ef6","name":"EdgeConneX","slug":"edgeconnex"}},{"id":"c00feae5-45a2-47e2-b6c0-43bb95511b6e","dataCenterId":"e3275f41-fe39-4e59-9e65-90b39478283d","companyId":null,"externalName":"PowerConneX Inc.","role":"developer","structureNotes":"affiliate developing on-site generation via PowerConneX New Albany 2, LLC","createdAt":"2026-08-17T20:20:59.122Z","company":null},{"id":"2999f7ce-9052-4293-b793-cbd286f1d9ea","dataCenterId":"e3275f41-fe39-4e59-9e65-90b39478283d","companyId":null,"externalName":"EQT","role":"financier","structureNotes":"Investment-firm parent/owner of EdgeConneX (tracker-reported)","createdAt":"2026-08-19T00:15:54.437Z","company":null},{"id":"e74d1774-c020-449d-b5d7-59a98d1831b0","dataCenterId":"e3275f41-fe39-4e59-9e65-90b39478283d","companyId":null,"externalName":"PJM Interconnection","role":"grid_operator","structureNotes":"New Albany OH sits in AEP Ohio / PJM territory; plant itself is behind-the-meter and off-grid","createdAt":"2026-08-19T00:15:55.571Z","company":null}],"financialClaims":[],"metricClaims":[],"powerProjects":[{"id":"1b836dfb-5e64-407f-b661-22af50cb4f65","dataCenterId":"e3275f41-fe39-4e59-9e65-90b39478283d","name":"PCX New Albany Energy Center Phase 1","type":"gas","capacityGw":0.14,"lifecycleState":"announced","sourceUrl":"https://www.edgeconnex.com/pcx-new-albany-energy-center/","evidenceTier":"verified","note":"OPSB Case No. 25-90-EL-BGN, certificate 2025-07-22; behind-the-meter, not grid-connected","createdAt":"2026-08-17T20:20:57.600Z"},{"id":"eddf8fe1-5c48-4df7-a7f1-07f2d9423598","dataCenterId":"e3275f41-fe39-4e59-9e65-90b39478283d","name":"PCX New Albany Energy Center Phase 2","type":"gas","capacityGw":0.216,"lifecycleState":"announced","sourceUrl":"https://www.farmanddairy.com/news/opsb-approves-natural-gas-plant-to-power-data-center-in-licking-county/899062.html","evidenceTier":"verified","note":"OPSB Case No. 25-302-EL-BGN, certificate 2025-11-20; includes battery storage","createdAt":"2026-08-17T20:20:57.991Z"},{"id":"33168ad5-56a8-4a9c-a81a-51ece12016b6","dataCenterId":"e3275f41-fe39-4e59-9e65-90b39478283d","name":"PowerConneX New Albany Energy Center (Phase 1)","type":"gas","capacityGw":0.14,"lifecycleState":"under_construction","sourceUrl":"https://www.edgeconnex.com/pcx-new-albany-energy-center/","evidenceTier":"verified","note":"Off-grid / behind-the-meter natural-gas plant, up to 140 MW, OPSB Case 25-90-EL-BLN certificated 2025-07-22, ~48.6 acres; primary power to co-located data center","createdAt":"2026-08-19T00:15:53.238Z"},{"id":"2e90df54-9089-424f-a00a-ec9732b3db9f","dataCenterId":"e3275f41-fe39-4e59-9e65-90b39478283d","name":"PowerConneX New Albany Energy Center (Phase 1) generating equipment","type":"gas","capacityGw":0.126,"lifecycleState":"under_construction","sourceUrl":"https://www.gem.wiki/PowerConneX_New_Albany_Energy_Center","evidenceTier":"claimed","note":"Tracker-reported engine nameplate: Jenbacher J624/J620 reciprocating gas engines plus Mainspring linear generators (~126 MW summed), under the 140 MW certificated cap","createdAt":"2026-08-19T00:15:53.624Z"}],"capacityClaims":[{"id":"8e69d506-3757-4fad-aac6-8264f616a7d1","dataCenterId":"e3275f41-fe39-4e59-9e65-90b39478283d","series":"announced","valueGw":0.14,"asOf":"2025-07-22T00:00:00.000Z","sourceUrl":"https://www.edgeconnex.com/pcx-new-albany-energy-center/","sourceType":"permit_filing","evidenceTier":"reported","supersedesId":null,"note":"OPSB certificate (Case No. 25-90-EL-BLN) authorizes up to 140 MW max generating capacity; behind-the-meter natural gas serving on-site data center","createdAt":"2026-08-19T00:15:51.856Z"},{"id":"852c670d-fc3f-4725-91a6-0722bac30301","dataCenterId":"e3275f41-fe39-4e59-9e65-90b39478283d","series":"under_construction","valueGw":0.14,"asOf":"2025-09-01T00:00:00.000Z","sourceUrl":"https://www.edgeconnex.com/pcx-new-albany-energy-center/","sourceType":"company_filing","evidenceTier":"verified","supersedesId":null,"note":"Construction commenced September 2025; not yet energized as of research date","createdAt":"2026-08-19T00:15:52.701Z"}],"events":[{"id":"749b4e4c-91ea-49c4-a67f-bbb1c7987667","dataCenterId":"e3275f41-fe39-4e59-9e65-90b39478283d","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"grid_operator: PJM Interconnection","occurredAt":"2026-08-19T00:15:55.953Z","createdAt":"2026-08-19T00:15:55.953Z"},{"id":"02229f65-44ba-4648-99f7-f918e5ce8116","dataCenterId":"e3275f41-fe39-4e59-9e65-90b39478283d","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"financier: EQT","occurredAt":"2026-08-19T00:15:54.821Z","createdAt":"2026-08-19T00:15:54.821Z"},{"id":"1229f0f5-df2b-4577-9b0c-7da825d3c8b9","dataCenterId":"e3275f41-fe39-4e59-9e65-90b39478283d","eventType":"capacity_changed","series":"under_construction","oldValue":null,"newValue":"0.14","claimId":"852c670d-fc3f-4725-91a6-0722bac30301","detail":null,"occurredAt":"2026-08-19T00:15:53.007Z","createdAt":"2026-08-19T00:15:53.007Z"},{"id":"b39fa21e-663e-47a2-bc73-a0b793114a96","dataCenterId":"e3275f41-fe39-4e59-9e65-90b39478283d","eventType":"claim_recorded","series":"under_construction","oldValue":null,"newValue":"0.14","claimId":"852c670d-fc3f-4725-91a6-0722bac30301","detail":"verified · company_filing","occurredAt":"2026-08-19T00:15:52.855Z","createdAt":"2026-08-19T00:15:52.855Z"},{"id":"fb5f5ac4-8e4f-4724-a8ad-45f4357bd4c3","dataCenterId":"e3275f41-fe39-4e59-9e65-90b39478283d","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"0.14","claimId":"8e69d506-3757-4fad-aac6-8264f616a7d1","detail":null,"occurredAt":"2026-08-19T00:15:52.167Z","createdAt":"2026-08-19T00:15:52.167Z"},{"id":"6300b3cd-92da-49d8-8257-bf144284f3c4","dataCenterId":"e3275f41-fe39-4e59-9e65-90b39478283d","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"0.14","claimId":"8e69d506-3757-4fad-aac6-8264f616a7d1","detail":"reported · permit_filing","occurredAt":"2026-08-19T00:15:52.014Z","createdAt":"2026-08-19T00:15:52.014Z"},{"id":"77999443-2cb8-4193-a66e-2347d072c9c2","dataCenterId":"e3275f41-fe39-4e59-9e65-90b39478283d","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: PowerConneX Inc.","occurredAt":"2026-08-17T20:20:59.502Z","createdAt":"2026-08-17T20:20:59.502Z"},{"id":"d7e01881-e831-4f36-a459-22b708bced7c","dataCenterId":"e3275f41-fe39-4e59-9e65-90b39478283d","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"operator: EdgeConneX, Inc.","occurredAt":"2026-08-17T20:20:58.749Z","createdAt":"2026-08-17T20:20:58.749Z"}]},"location":{"name":"New Albany","slug":"new-albany-ohio","kind":"city","lat":40.09,"lng":-82.71},"evidence":[{"id":"fc793911-3fe3-4d2e-8318-f08db7213d53","facilityId":"99186cd1-a777-407b-b2e8-79b9ad874830","field":"buildingSqft","value":"524525","asOf":null,"sourceUrl":"https://www.datacenterdynamics.com/en/news/edgeconnex-files-to-convert-warehouse-and-build-new-700000-sq-ft-data-center-in-new-albany-ohio/","sourceType":"operator","tier":"reported","note":"Phase I warehouse conversion; Phase II adds a separate 700k sqft building (not counted here)","createdAt":"2026-08-20T23:54:33.348Z"},{"id":"81508bbd-0d19-4aca-be27-ac5b4f84f3ed","facilityId":"99186cd1-a777-407b-b2e8-79b9ad874830","field":"record","value":"EdgeConneX New Albany","asOf":null,"sourceUrl":"https://www.edgeconnex.com/americas/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T02:53:32.858Z"},{"id":"ea4218c4-7c02-44ba-b19d-9f43be05d5d2","facilityId":"99186cd1-a777-407b-b2e8-79b9ad874830","field":"status","value":"announced (Coming Soon)","asOf":null,"sourceUrl":"https://www.edgeconnex.com/americas/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T02:53:32.858Z"},{"id":"73d3db55-441a-4c70-996c-4482296d725c","facilityId":"99186cd1-a777-407b-b2e8-79b9ad874830","field":"streetAddress","value":"9850 Innovation Campus Way, New Albany, OH","asOf":null,"sourceUrl":"https://www.datacenterdynamics.com/en/news/edgeconnex-files-to-convert-warehouse-and-build-new-700000-sq-ft-data-center-in-new-albany-ohio/","sourceType":"operator","tier":"reported","note":null,"createdAt":"2026-08-20T23:54:33.768Z"}],"resolved_facts":{"buildingSqft":{"id":"fc793911-3fe3-4d2e-8318-f08db7213d53","facilityId":"99186cd1-a777-407b-b2e8-79b9ad874830","field":"buildingSqft","value":"524525","asOf":null,"sourceUrl":"https://www.datacenterdynamics.com/en/news/edgeconnex-files-to-convert-warehouse-and-build-new-700000-sq-ft-data-center-in-new-albany-ohio/","sourceType":"operator","tier":"reported","note":"Phase I warehouse conversion; Phase II adds a separate 700k sqft building (not counted here)","createdAt":"2026-08-20T23:54:33.348Z"},"record":{"id":"81508bbd-0d19-4aca-be27-ac5b4f84f3ed","facilityId":"99186cd1-a777-407b-b2e8-79b9ad874830","field":"record","value":"EdgeConneX New Albany","asOf":null,"sourceUrl":"https://www.edgeconnex.com/americas/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T02:53:32.858Z"},"status":{"id":"ea4218c4-7c02-44ba-b19d-9f43be05d5d2","facilityId":"99186cd1-a777-407b-b2e8-79b9ad874830","field":"status","value":"announced (Coming Soon)","asOf":null,"sourceUrl":"https://www.edgeconnex.com/americas/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T02:53:32.858Z"},"streetAddress":{"id":"73d3db55-441a-4c70-996c-4482296d725c","facilityId":"99186cd1-a777-407b-b2e8-79b9ad874830","field":"streetAddress","value":"9850 Innovation Campus Way, New Albany, OH","asOf":null,"sourceUrl":"https://www.datacenterdynamics.com/en/news/edgeconnex-files-to-convert-warehouse-and-build-new-700000-sq-ft-data-center-in-new-albany-ohio/","sourceType":"operator","tier":"reported","note":null,"createdAt":"2026-08-20T23:54:33.768Z"}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"EdgeConneX New Albany","url":"https://registry.deploy.report/datacenters/facilities/edgeconnex-new-albany-oh","geo":{"@type":"GeoCoordinates","latitude":40.0886326,"longitude":-82.7452472},"address":{"@type":"PostalAddress","addressLocality":"New Albany","streetAddress":"9850 Innovation Campus Way, New Albany, OH"},"additionalProperty":[{"@type":"PropertyValue","name":"operator","value":"EdgeConneX"}]}}