{"id":"78c50f1c-ffe6-4ffe-810a-d5ef21f14271","slug":"galaxy-helios-campus-dickens-county-tx","name":"Helios Data Center Campus","aliases":[],"operatorCompanyId":"67787daa-697b-4a21-8d0e-5cca78f8857b","parentCampusId":null,"lat":null,"lng":null,"streetAddress":null,"locationId":"7aa72342-c4bb-4dff-beef-2e7cae168ffa","status":"operating","facilityType":"crypto_hpc","criticalItMw":260,"buildingSqft":null,"yearOperational":null,"yearAnnounced":null,"servingUtility":null,"wikidataId":null,"osmId":null,"dataSourceFamily":"c1_operator","locationPrecision":"city","reviewStatus":"reviewed","sources":[{"url":"https://www.stocktitan.net/sec-filings/GLXY/8-k-galaxy-digital-inc-reports-material-event-ef2989012a6f.html"}],"notes":null,"createdAt":"2026-08-19T03:35:39.443Z","updatedAt":"2026-08-19T03:38:45.155Z","operator":{"name":"Galaxy Digital Inc.","slug":"galaxy-digital-inc"},"parentCampus":null,"location":{"name":"Dickens","slug":"dickens-texas","kind":"city","lat":33.6170056,"lng":-100.7614115},"evidence":[{"id":"9ec40acb-8a49-4d2e-a2a8-7e7e1d21a464","facilityId":"78c50f1c-ffe6-4ffe-810a-d5ef21f14271","field":"critical_it_mw","value":"1.6 GW ERCOT-approved utility power capacity; two-building expansion = 400 MW utility / 260 MW critical IT contracted to CoreWeave","asOf":null,"sourceUrl":"https://www.stocktitan.net/sec-filings/GLXY/8-k-galaxy-digital-inc-reports-material-event-ef2989012a6f.html","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T03:35:39.930Z"},{"id":"3eea0ecb-fff7-4a6d-96b7-7d092f7746fb","facilityId":"78c50f1c-ffe6-4ffe-810a-d5ef21f14271","field":"record","value":"Helios Data Center Campus","asOf":null,"sourceUrl":"https://www.stocktitan.net/sec-filings/GLXY/8-k-galaxy-digital-inc-reports-material-event-ef2989012a6f.html","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T03:35:39.930Z"},{"id":"8d5a3490-7055-419c-a38d-33410404622e","facilityId":"78c50f1c-ffe6-4ffe-810a-d5ef21f14271","field":"status","value":"operating (flagship AI/HPC campus, long-term anchor lease); acquired from Argo Blockchain 2022","asOf":null,"sourceUrl":"https://www.stocktitan.net/sec-filings/GLXY/8-k-galaxy-digital-inc-reports-material-event-ef2989012a6f.html","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T03:35:39.930Z"}],"resolved_facts":{"critical_it_mw":{"id":"9ec40acb-8a49-4d2e-a2a8-7e7e1d21a464","facilityId":"78c50f1c-ffe6-4ffe-810a-d5ef21f14271","field":"critical_it_mw","value":"1.6 GW ERCOT-approved utility power capacity; two-building expansion = 400 MW utility / 260 MW critical IT contracted to CoreWeave","asOf":null,"sourceUrl":"https://www.stocktitan.net/sec-filings/GLXY/8-k-galaxy-digital-inc-reports-material-event-ef2989012a6f.html","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T03:35:39.930Z"},"record":{"id":"3eea0ecb-fff7-4a6d-96b7-7d092f7746fb","facilityId":"78c50f1c-ffe6-4ffe-810a-d5ef21f14271","field":"record","value":"Helios Data Center Campus","asOf":null,"sourceUrl":"https://www.stocktitan.net/sec-filings/GLXY/8-k-galaxy-digital-inc-reports-material-event-ef2989012a6f.html","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T03:35:39.930Z"},"status":{"id":"8d5a3490-7055-419c-a38d-33410404622e","facilityId":"78c50f1c-ffe6-4ffe-810a-d5ef21f14271","field":"status","value":"operating (flagship AI/HPC campus, long-term anchor lease); acquired from Argo Blockchain 2022","asOf":null,"sourceUrl":"https://www.stocktitan.net/sec-filings/GLXY/8-k-galaxy-digital-inc-reports-material-event-ef2989012a6f.html","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T03:35:39.930Z"}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Helios Data Center Campus","url":"https://registry.deploy.report/datacenters/facilities/galaxy-helios-campus-dickens-county-tx","address":{"@type":"PostalAddress","addressLocality":"Dickens"},"additionalProperty":[{"@type":"PropertyValue","name":"operator","value":"Galaxy Digital Inc."}]}}