{"id":"1329d601-355b-42ca-8770-5d87e9b00fdd","slug":"great-bridge-data-center-chesapeake-va","name":"Great Bridge Data Center (Chesapeake)","aliases":[],"operatorCompanyId":"83f0c65c-7669-4651-b144-76929d6f9b8e","parentCampusId":null,"lat":null,"lng":null,"streetAddress":null,"locationId":"567e57a4-08e7-4c84-8730-5a84c3bb9a6e","status":"announced","facilityType":"colocation","criticalItMw":null,"buildingSqft":350000,"yearOperational":null,"yearAnnounced":null,"servingUtility":null,"wikidataId":null,"osmId":null,"dataSourceFamily":"c1_operator","locationPrecision":"city","reviewStatus":"reviewed","sources":[{"url":"https://www.whro.org/business-growth/2025-05-13/chesapeakes-first-proposed-data-center-already-faces-opposition"}],"notes":null,"createdAt":"2026-08-19T03:50:39.036Z","updatedAt":"2026-08-19T04:07:31.730Z","operator":{"name":"Doug Fuller","slug":"doug-fuller"},"parentCampus":null,"location":{"name":"Chesapeake","slug":"chesapeake-virginia","kind":"city","lat":36.7168315,"lng":-76.2494453},"evidence":[{"id":"19018d94-e377-43ec-b205-753115fd5e68","facilityId":"1329d601-355b-42ca-8770-5d87e9b00fdd","field":"building_sqft","value":"350000 sqft two-story AI-compute facility near Great Bridge","asOf":null,"sourceUrl":"https://www.whro.org/business-growth/2025-05-13/chesapeakes-first-proposed-data-center-already-faces-opposition","sourceType":"operator_page","tier":"claimed","note":null,"createdAt":"2026-08-19T03:50:39.495Z"},{"id":"f6fc87df-87b6-4947-8fc3-ba27f0f5cace","facilityId":"1329d601-355b-42ca-8770-5d87e9b00fdd","field":"record","value":"Great Bridge Data Center (Chesapeake)","asOf":null,"sourceUrl":"https://www.whro.org/business-growth/2025-05-13/chesapeakes-first-proposed-data-center-already-faces-opposition","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T03:50:39.495Z"},{"id":"01beab8c-d513-4b36-aaef-c0b0e9d243f8","facilityId":"1329d601-355b-42ca-8770-5d87e9b00fdd","field":"status","value":"announced (proposed; Planning Commission recommended against as of 2025)","asOf":null,"sourceUrl":"https://www.whro.org/business-growth/2025-05-13/chesapeakes-first-proposed-data-center-already-faces-opposition","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T03:50:39.495Z"}],"resolved_facts":{"building_sqft":{"id":"19018d94-e377-43ec-b205-753115fd5e68","facilityId":"1329d601-355b-42ca-8770-5d87e9b00fdd","field":"building_sqft","value":"350000 sqft two-story AI-compute facility near Great Bridge","asOf":null,"sourceUrl":"https://www.whro.org/business-growth/2025-05-13/chesapeakes-first-proposed-data-center-already-faces-opposition","sourceType":"operator_page","tier":"claimed","note":null,"createdAt":"2026-08-19T03:50:39.495Z"},"record":{"id":"f6fc87df-87b6-4947-8fc3-ba27f0f5cace","facilityId":"1329d601-355b-42ca-8770-5d87e9b00fdd","field":"record","value":"Great Bridge Data Center (Chesapeake)","asOf":null,"sourceUrl":"https://www.whro.org/business-growth/2025-05-13/chesapeakes-first-proposed-data-center-already-faces-opposition","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T03:50:39.495Z"},"status":{"id":"01beab8c-d513-4b36-aaef-c0b0e9d243f8","facilityId":"1329d601-355b-42ca-8770-5d87e9b00fdd","field":"status","value":"announced (proposed; Planning Commission recommended against as of 2025)","asOf":null,"sourceUrl":"https://www.whro.org/business-growth/2025-05-13/chesapeakes-first-proposed-data-center-already-faces-opposition","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T03:50:39.495Z"}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Great Bridge Data Center (Chesapeake)","url":"https://registry.deploy.report/datacenters/facilities/great-bridge-data-center-chesapeake-va","address":{"@type":"PostalAddress","addressLocality":"Chesapeake"},"additionalProperty":[{"@type":"PropertyValue","name":"operator","value":"Doug Fuller"}]}}