{"id":"6684e7b7-8211-447f-b700-674e9fe5d2b6","slug":"griid-limestone-tn","name":"GRIID Limestone","aliases":[],"operatorCompanyId":"40af9caa-5b18-4d50-a5dd-3abc8573ee67","parentCampusId":null,"lat":null,"lng":null,"streetAddress":null,"locationId":"6304b1f0-901d-4e26-991d-1b5b3e64da4b","status":"operating","facilityType":"crypto_hpc","criticalItMw":null,"buildingSqft":null,"yearOperational":null,"yearAnnounced":null,"servingUtility":null,"wikidataId":null,"osmId":null,"dataSourceFamily":"c1_operator","locationPrecision":"city","reviewStatus":"reviewed","sources":[{"url":"https://www.globenewswire.com/news-release/2024/02/06/2824158/0/en/GRIID-Infrastructure-to-Add-60-MW-with-New-Bitcoin-Mining-Facility-in-Tennessee.html"}],"notes":null,"createdAt":"2026-08-19T23:13:13.889Z","updatedAt":"2026-08-19T23:35:07.754Z","operator":{"name":"GRIID Infrastructure","slug":"griid-infrastructure"},"parentCampus":null,"location":{"name":"Limestone","slug":"limestone-tennessee","kind":"city","lat":36.2281601,"lng":-82.6304277},"evidence":[{"id":"aa19e39b-a83e-4daa-ac55-21943fe586c4","facilityId":"6684e7b7-8211-447f-b700-674e9fe5d2b6","field":"record","value":"GRIID Limestone","asOf":null,"sourceUrl":"https://www.globenewswire.com/news-release/2024/02/06/2824158/0/en/GRIID-Infrastructure-to-Add-60-MW-with-New-Bitcoin-Mining-Facility-in-Tennessee.html","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T23:13:14.280Z"},{"id":"e8eedfe9-7dda-40e1-89f8-567e634d3c1a","facilityId":"6684e7b7-8211-447f-b700-674e9fe5d2b6","field":"status","value":"One of GRIID's operating East Tennessee mining sites (later acquired by CleanSpark, Oct 2024)","asOf":null,"sourceUrl":"https://www.globenewswire.com/news-release/2024/02/06/2824158/0/en/GRIID-Infrastructure-to-Add-60-MW-with-New-Bitcoin-Mining-Facility-in-Tennessee.html","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T23:13:14.280Z"}],"resolved_facts":{"record":{"id":"aa19e39b-a83e-4daa-ac55-21943fe586c4","facilityId":"6684e7b7-8211-447f-b700-674e9fe5d2b6","field":"record","value":"GRIID Limestone","asOf":null,"sourceUrl":"https://www.globenewswire.com/news-release/2024/02/06/2824158/0/en/GRIID-Infrastructure-to-Add-60-MW-with-New-Bitcoin-Mining-Facility-in-Tennessee.html","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T23:13:14.280Z"},"status":{"id":"e8eedfe9-7dda-40e1-89f8-567e634d3c1a","facilityId":"6684e7b7-8211-447f-b700-674e9fe5d2b6","field":"status","value":"One of GRIID's operating East Tennessee mining sites (later acquired by CleanSpark, Oct 2024)","asOf":null,"sourceUrl":"https://www.globenewswire.com/news-release/2024/02/06/2824158/0/en/GRIID-Infrastructure-to-Add-60-MW-with-New-Bitcoin-Mining-Facility-in-Tennessee.html","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T23:13:14.280Z"}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"GRIID Limestone","url":"https://registry.deploy.report/datacenters/facilities/griid-limestone-tn","address":{"@type":"PostalAddress","addressLocality":"Limestone"},"additionalProperty":[{"@type":"PropertyValue","name":"operator","value":"GRIID Infrastructure"}]}}