{"id":"fe493afd-116a-4461-9612-776e78e570ed","slug":"hut8-river-bend-west-feliciana-la","name":"River Bend AI Data Center Campus","aliases":[],"operatorCompanyId":"83386ea0-f9b0-418b-b9f0-4c8fab7f1c8d","parentCampusId":null,"lat":null,"lng":null,"streetAddress":null,"locationId":"3009cc88-608a-4220-88d5-3217ba905836","status":"under_construction","facilityType":"hyperscale","criticalItMw":245,"buildingSqft":null,"yearOperational":2027,"yearAnnounced":null,"servingUtility":null,"wikidataId":null,"osmId":null,"dataSourceFamily":"c1_operator","locationPrecision":"city","reviewStatus":"reviewed","sources":[{"url":"https://www.prnewswire.com/news-releases/hut-8-signs-15-year-245-mw-ai-data-center-lease-at-river-bend-campus-with-total-contract-value-of-7-0-billion-302644600.html"}],"notes":null,"createdAt":"2026-08-19T04:05:17.040Z","updatedAt":"2026-08-19T04:07:31.730Z","operator":{"name":"Hut 8","slug":"hut-8"},"parentCampus":null,"location":{"name":"St. Francisville","slug":"st-francisville-louisiana","kind":"city","lat":30.7807244,"lng":-91.3763353},"evidence":[{"id":"bfa9b2b2-8054-4aa2-8279-8be20c28b502","facilityId":"fe493afd-116a-4461-9612-776e78e570ed","field":"critical_it_mw","value":"245","asOf":null,"sourceUrl":"https://www.prnewswire.com/news-releases/hut-8-signs-15-year-245-mw-ai-data-center-lease-at-river-bend-campus-with-total-contract-value-of-7-0-billion-302644600.html","sourceType":"operator_page","tier":"claimed","note":null,"createdAt":"2026-08-19T04:05:17.422Z"},{"id":"d3a65b49-da09-4778-991d-af4fa03cc70c","facilityId":"fe493afd-116a-4461-9612-776e78e570ed","field":"record","value":"River Bend AI Data Center Campus","asOf":null,"sourceUrl":"https://www.prnewswire.com/news-releases/hut-8-signs-15-year-245-mw-ai-data-center-lease-at-river-bend-campus-with-total-contract-value-of-7-0-billion-302644600.html","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T04:05:17.422Z"},{"id":"f8881937-5f92-4d7d-b77e-65536af20753","facilityId":"fe493afd-116a-4461-9612-776e78e570ed","field":"status","value":"under_construction","asOf":null,"sourceUrl":"https://www.entergy.com/news/hut-8-selects-entergy-southeast-louisiana-for-10-billion-artificial-intelligence-data-center","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T04:05:17.422Z"}],"resolved_facts":{"critical_it_mw":{"id":"bfa9b2b2-8054-4aa2-8279-8be20c28b502","facilityId":"fe493afd-116a-4461-9612-776e78e570ed","field":"critical_it_mw","value":"245","asOf":null,"sourceUrl":"https://www.prnewswire.com/news-releases/hut-8-signs-15-year-245-mw-ai-data-center-lease-at-river-bend-campus-with-total-contract-value-of-7-0-billion-302644600.html","sourceType":"operator_page","tier":"claimed","note":null,"createdAt":"2026-08-19T04:05:17.422Z"},"record":{"id":"d3a65b49-da09-4778-991d-af4fa03cc70c","facilityId":"fe493afd-116a-4461-9612-776e78e570ed","field":"record","value":"River Bend AI Data Center Campus","asOf":null,"sourceUrl":"https://www.prnewswire.com/news-releases/hut-8-signs-15-year-245-mw-ai-data-center-lease-at-river-bend-campus-with-total-contract-value-of-7-0-billion-302644600.html","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T04:05:17.422Z"},"status":{"id":"f8881937-5f92-4d7d-b77e-65536af20753","facilityId":"fe493afd-116a-4461-9612-776e78e570ed","field":"status","value":"under_construction","asOf":null,"sourceUrl":"https://www.entergy.com/news/hut-8-selects-entergy-southeast-louisiana-for-10-billion-artificial-intelligence-data-center","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T04:05:17.422Z"}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"River Bend AI Data Center Campus","url":"https://registry.deploy.report/datacenters/facilities/hut8-river-bend-west-feliciana-la","address":{"@type":"PostalAddress","addressLocality":"St. Francisville"},"additionalProperty":[{"@type":"PropertyValue","name":"operator","value":"Hut 8"}]}}