{"id":"d877e68c-bdcb-48fa-b631-692138e847b4","slug":"meta-eagle-mountain-ut","name":"Eagle Mountain Data Center","aliases":[],"operatorCompanyId":"303ca7c0-45ce-4503-97e7-d5e0d5adb2bb","parentCampusId":"a76e96bd-5e07-444b-ba92-4995dcb78add","lat":40.2688261,"lng":-112.0175808,"streetAddress":"1275 North Community Circle, Eagle Mountain, UT","locationId":"dd558c03-98e5-4932-b6c1-e579a8a860b1","status":"operating","facilityType":"hyperscale","criticalItMw":null,"buildingSqft":null,"yearOperational":null,"yearAnnounced":null,"servingUtility":"Rocky Mountain Power","wikidataId":null,"osmId":null,"dataSourceFamily":"c1_operator","locationPrecision":"exact","reviewStatus":"reviewed","sources":[{"url":"https://datacenters.atmeta.com/asset/eagle-mountain-data-center-sheet/"}],"notes":null,"createdAt":"2026-08-19T04:34:25.302Z","updatedAt":"2026-08-29T19:10:22.002Z","operator":{"name":"Meta","slug":"meta"},"parentCampus":{"id":"a76e96bd-5e07-444b-ba92-4995dcb78add","slug":"meta-eagle-mountain-utah","name":"Meta Eagle Mountain Data Center Campus","aliases":["Facebook Eagle Mountain","Project Steeplechase"],"locationId":"dd558c03-98e5-4932-b6c1-e579a8a860b1","lat":40.366,"lng":-112.088,"locationPrecision":"exact","landStatus":"greenfield","lifecycleState":"partially_energized","powerSourceMix":"grid","interconnectionQueueStatus":"Grid connected and operating: the campus is served by Rocky Mountain Power and is serving traffic. Meta is bringing more than 800 MW of new solar onto that grid through nine projects across Iron, Tooele and Carbon counties, carrying about $260 million of local investment.","interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"WECC","waterSourceNotes":"Meta funds water restoration equal to 200% of the facility's consumption; in-house designs stated ~80% more water-efficient than industry average.","servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Operational Meta campus (online since 2021) under multi-phase expansion toward a ~4.5M sq ft footprint; ~200 MW currently with a new substation adding up to 1,000 MW of delivery capacity and headroom cited up to 1.8 GW. Powered via Rocky Mountain Power's renewable Schedule 34 tariff plus the Faraday Solar PPA. Meta has not published a firm total contracted MW figure for the full buildout.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.deseret.com/utah/2022/9/30/23380151/facebook-meta-announces-expansion-eagle-mountain-data-center-tax-breaks/","date":"2022-09-30","title":"Facebook parent Meta announces mega expansion to Eagle Mountain data center project","publisher":"Deseret News"},{"url":"https://www.heraldextra.com/news/2025/nov/21/rays-of-power-utahs-largest-solar-plant-becomes-operational-set-to-power-eagle-mountain-data-center/","date":"2025-11-21","title":"Utah's largest solar plant becomes operational, set to power Eagle Mountain data center","publisher":"Daily Herald"},{"url":"https://datacenters.atmeta.com/2021/07/utah-county-we-are-online/","title":"Utah County, We Are Online!","sourceName":"Meta Data Centers"}],"reviewNote":null,"createdAt":"2026-08-17T20:25:17.497Z","updatedAt":"2026-08-28T19:36:02.121Z","parties":[{"id":"6f43f7df-591c-49a9-8dbe-eb7c1dec48da","dataCenterId":"a76e96bd-5e07-444b-ba92-4995dcb78add","companyId":null,"externalName":"Rocky Mountain Power (PacifiCorp)","role":"utility","structureNotes":"Schedule 34 renewable tariff","createdAt":"2026-08-17T20:25:20.765Z","company":null},{"id":"717b27be-93b0-4b8f-87d9-870ac00e9499","dataCenterId":"a76e96bd-5e07-444b-ba92-4995dcb78add","companyId":"a9a34db8-5719-4789-b681-7ba6643a92b2","externalName":"Meta Platforms","role":"operator","structureNotes":null,"createdAt":"2026-08-17T20:25:19.991Z","company":{"id":"a9a34db8-5719-4789-b681-7ba6643a92b2","name":"Meta Platforms","slug":"meta-platforms"}},{"id":"c886a45d-3e86-46e3-a07a-15ca7b96b31f","dataCenterId":"a76e96bd-5e07-444b-ba92-4995dcb78add","companyId":null,"externalName":"Excelsior Energy Capital","role":"developer","structureNotes":"Owner/developer of the Faraday Solar project supplying the Meta campus via a 20-year renewable PPA (acquired the project from Parasol/Clenera in 2023).","createdAt":"2026-08-19T01:34:19.042Z","company":null}],"financialClaims":[{"id":"5084c5a3-d4a4-48a9-bf32-630d9a22410c","dataCenterId":"a76e96bd-5e07-444b-ba92-4995dcb78add","kind":"capex","label":"Meta cumulative campus investment","valueUsd":"1500000000","capUsd":null,"conditions":"Total capital investment cited at 2022 Phase 3 expansion toward ~4.5M sq ft campus.","asOf":"2022-06-01T00:00:00.000Z","sourceUrl":"https://www.deseret.com/utah/2022/9/30/23380151/facebook-meta-announces-expansion-eagle-mountain-data-center-tax-breaks/","sourceType":"journalist_report","evidenceTier":"reported","createdAt":"2026-08-19T01:34:17.099Z"}],"metricClaims":[{"id":"99ae162b-821d-46fe-9a0b-0d26ba59378f","dataCenterId":"a76e96bd-5e07-444b-ba92-4995dcb78add","metricType":"capex_usd","valueNumeric":1500000000,"valueText":null,"unit":null,"grantingJurisdiction":null,"asOf":"2026-01-01T00:00:00.000Z","sourceUrl":"https://datacenters.atmeta.com/asset/eagle-mountain-data-center-sheet/","sourceType":"operator_page","evidenceTier":"reported","supersedesId":null,"note":"migrated from Tier2 facility meta-utah-eagle-mountain","createdAt":"2026-08-18T13:51:30.000Z"},{"id":"14af64ce-511f-4054-a87d-579b89da100b","dataCenterId":"a76e96bd-5e07-444b-ba92-4995dcb78add","metricType":"jobs_construction","valueNumeric":1200,"valueText":null,"unit":null,"grantingJurisdiction":null,"asOf":"2026-01-01T00:00:00.000Z","sourceUrl":"https://datacenters.atmeta.com/asset/eagle-mountain-data-center-sheet/","sourceType":"operator_page","evidenceTier":"reported","supersedesId":null,"note":"migrated from Tier2 facility meta-utah-eagle-mountain","createdAt":"2026-08-18T13:51:30.770Z"},{"id":"7bad7c0b-71bf-436e-99e9-6216e11582bb","dataCenterId":"a76e96bd-5e07-444b-ba92-4995dcb78add","metricType":"jobs_permanent","valueNumeric":300,"valueText":null,"unit":null,"grantingJurisdiction":null,"asOf":"2026-01-01T00:00:00.000Z","sourceUrl":"https://datacenters.atmeta.com/asset/eagle-mountain-data-center-sheet/","sourceType":"operator_page","evidenceTier":"reported","supersedesId":null,"note":"migrated from Tier2 facility meta-utah-eagle-mountain","createdAt":"2026-08-18T13:51:31.534Z"}],"powerProjects":[{"id":"f1fa5cc3-2284-4af6-8817-79756ea776d2","dataCenterId":"a76e96bd-5e07-444b-ba92-4995dcb78add","name":"Faraday Solar","type":"solar","capacityGw":0.685,"lifecycleState":"energized","sourceUrl":"https://www.heraldextra.com/news/2025/nov/21/rays-of-power-utahs-largest-solar-plant-becomes-operational-set-to-power-eagle-mountain-data-center/","evidenceTier":"reported","note":"685.3 MWdc; 20-year PPA via Rocky Mountain Power Schedule 34.","createdAt":"2026-08-17T20:25:19.607Z"},{"id":"e3682a81-6bfd-49ec-ad7f-edde0db1336a","dataCenterId":"a76e96bd-5e07-444b-ba92-4995dcb78add","name":"Spanish Fork (Mapleton) to Mercer 345 kV transmission line","type":"grid","capacityGw":null,"lifecycleState":"announced","sourceUrl":"https://www.heraldextra.com/news/2025/aug/17/rocky-mountain-power-proposing-new-transmission-line-in-utah-county-some-residents-cast-concerns/","evidenceTier":"reported","note":"45-mile 345 kV line proposed by Rocky Mountain Power (Aug 2025) to add capacity serving Utah County load growth; delivers to the Mercer substation (built 2019 to serve the Meta campus).","createdAt":"2026-08-19T01:34:17.915Z"}],"capacityClaims":[{"id":"689a58fe-76b9-4f36-b0b2-7653486e7458","dataCenterId":"a76e96bd-5e07-444b-ba92-4995dcb78add","series":"announced","valueGw":1.8,"asOf":"2025-11-21T00:00:00.000Z","sourceUrl":"https://www.heraldextra.com/news/2025/nov/21/rays-of-power-utahs-largest-solar-plant-becomes-operational-set-to-power-eagle-mountain-data-center/","sourceType":"journalist_report","evidenceTier":"claimed","supersedesId":null,"note":"Cited scaling ceiling up to 1.8 GW; not a contracted figure.","createdAt":"2026-08-17T20:25:19.075Z"},{"id":"58550a3c-72ec-48dc-b5a4-ad01527a1a7b","dataCenterId":"a76e96bd-5e07-444b-ba92-4995dcb78add","series":"energized","valueGw":0.2,"asOf":"2025-02-01T00:00:00.000Z","sourceUrl":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Metas-Eagle-Mountain-Data-Center.pdf","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"Reported ~200 MW operational capacity.","createdAt":"2026-08-17T20:25:18.190Z"}],"events":[{"id":"adbcc1c0-f312-4fee-aec0-3866d02b7b41","dataCenterId":"a76e96bd-5e07-444b-ba92-4995dcb78add","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: Excelsior Energy Capital","occurredAt":"2026-08-19T01:34:19.419Z","createdAt":"2026-08-19T01:34:19.419Z"},{"id":"63bed6bb-bcad-4851-957c-cde9fd98844b","dataCenterId":"a76e96bd-5e07-444b-ba92-4995dcb78add","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: Meta cumulative campus investment","occurredAt":"2026-08-19T01:34:17.502Z","createdAt":"2026-08-19T01:34:17.502Z"},{"id":"2059bc6f-c0a3-4599-b77c-fceed198c036","dataCenterId":"a76e96bd-5e07-444b-ba92-4995dcb78add","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: Rocky Mountain Power (PacifiCorp)","occurredAt":"2026-08-17T20:25:21.145Z","createdAt":"2026-08-17T20:25:21.145Z"},{"id":"6de0df31-1b18-4f48-b9cc-aeec21c3e3d8","dataCenterId":"a76e96bd-5e07-444b-ba92-4995dcb78add","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"operator: Meta Platforms","occurredAt":"2026-08-17T20:25:20.378Z","createdAt":"2026-08-17T20:25:20.378Z"},{"id":"ea855414-aacf-4380-9f50-1fd9bc3261f6","dataCenterId":"a76e96bd-5e07-444b-ba92-4995dcb78add","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"1.8","claimId":"689a58fe-76b9-4f36-b0b2-7653486e7458","detail":null,"occurredAt":"2026-08-17T20:25:19.380Z","createdAt":"2026-08-17T20:25:19.380Z"},{"id":"219836b7-36a1-4a58-b854-4d2dbf3e4e17","dataCenterId":"a76e96bd-5e07-444b-ba92-4995dcb78add","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"1.8","claimId":"689a58fe-76b9-4f36-b0b2-7653486e7458","detail":"claimed · journalist_report","occurredAt":"2026-08-17T20:25:19.227Z","createdAt":"2026-08-17T20:25:19.227Z"},{"id":"6ebcc473-e1e6-4981-8fe2-2c41fef0ec13","dataCenterId":"a76e96bd-5e07-444b-ba92-4995dcb78add","eventType":"capacity_changed","series":"energized","oldValue":null,"newValue":"0.2","claimId":"58550a3c-72ec-48dc-b5a4-ad01527a1a7b","detail":null,"occurredAt":"2026-08-17T20:25:18.498Z","createdAt":"2026-08-17T20:25:18.498Z"},{"id":"63176690-ec18-4536-be00-dfd11e463f25","dataCenterId":"a76e96bd-5e07-444b-ba92-4995dcb78add","eventType":"claim_recorded","series":"energized","oldValue":null,"newValue":"0.2","claimId":"58550a3c-72ec-48dc-b5a4-ad01527a1a7b","detail":"reported · press_release","occurredAt":"2026-08-17T20:25:18.343Z","createdAt":"2026-08-17T20:25:18.343Z"}]},"location":{"name":"Eagle Mountain","slug":"eagle-mountain-utah","kind":"city","lat":40.3093488,"lng":-112.0119825},"evidence":[{"id":"43c2badc-0b59-40be-9fe3-23f1a6e36f5e","facilityId":"d877e68c-bdcb-48fa-b631-692138e847b4","field":"record","value":"Eagle Mountain Data Center","asOf":null,"sourceUrl":"https://datacenters.atmeta.com/asset/eagle-mountain-data-center-sheet/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T04:34:25.687Z"},{"id":"3b180a11-1cdd-4161-9f46-0900ab0d0677","facilityId":"d877e68c-bdcb-48fa-b631-692138e847b4","field":"servingUtility","value":"Rocky Mountain Power","asOf":null,"sourceUrl":"https://datacenters.atmeta.com/asset/eagle-mountain-data-center-sheet/","sourceType":"operator","tier":"reported","note":null,"createdAt":"2026-08-21T05:19:26.722Z"},{"id":"55e4ee70-b220-4604-9292-237d29103a50","facilityId":"d877e68c-bdcb-48fa-b631-692138e847b4","field":"status","value":"operating","asOf":null,"sourceUrl":"https://datacenters.atmeta.com/asset/eagle-mountain-data-center-sheet/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T04:34:25.687Z"},{"id":"7e3e94ee-1611-483b-a57e-945b650c9d24","facilityId":"d877e68c-bdcb-48fa-b631-692138e847b4","field":"streetAddress","value":"1275 North Community Circle, Eagle Mountain, UT","asOf":null,"sourceUrl":"https://baxtel.com/data-center/meta-eagle-mountain-utah-campus","sourceType":"operator","tier":"reported","note":"7-building campus","createdAt":"2026-08-21T17:14:36.594Z"}],"resolved_facts":{"record":{"id":"43c2badc-0b59-40be-9fe3-23f1a6e36f5e","facilityId":"d877e68c-bdcb-48fa-b631-692138e847b4","field":"record","value":"Eagle Mountain Data Center","asOf":null,"sourceUrl":"https://datacenters.atmeta.com/asset/eagle-mountain-data-center-sheet/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T04:34:25.687Z"},"servingUtility":{"id":"3b180a11-1cdd-4161-9f46-0900ab0d0677","facilityId":"d877e68c-bdcb-48fa-b631-692138e847b4","field":"servingUtility","value":"Rocky Mountain Power","asOf":null,"sourceUrl":"https://datacenters.atmeta.com/asset/eagle-mountain-data-center-sheet/","sourceType":"operator","tier":"reported","note":null,"createdAt":"2026-08-21T05:19:26.722Z"},"status":{"id":"55e4ee70-b220-4604-9292-237d29103a50","facilityId":"d877e68c-bdcb-48fa-b631-692138e847b4","field":"status","value":"operating","asOf":null,"sourceUrl":"https://datacenters.atmeta.com/asset/eagle-mountain-data-center-sheet/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T04:34:25.687Z"},"streetAddress":{"id":"7e3e94ee-1611-483b-a57e-945b650c9d24","facilityId":"d877e68c-bdcb-48fa-b631-692138e847b4","field":"streetAddress","value":"1275 North Community Circle, Eagle Mountain, UT","asOf":null,"sourceUrl":"https://baxtel.com/data-center/meta-eagle-mountain-utah-campus","sourceType":"operator","tier":"reported","note":"7-building campus","createdAt":"2026-08-21T17:14:36.594Z"}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Eagle Mountain Data Center","url":"https://registry.deploy.report/datacenters/facilities/meta-eagle-mountain-ut","geo":{"@type":"GeoCoordinates","latitude":40.2688261,"longitude":-112.0175808},"address":{"@type":"PostalAddress","addressLocality":"Eagle Mountain","streetAddress":"1275 North Community Circle, Eagle Mountain, UT"},"additionalProperty":[{"@type":"PropertyValue","name":"operator","value":"Meta"}]}}