{"id":"35495f18-c100-4b33-be9e-10fb6e88559d","slug":"meta-el-paso-data-center-campus-tx","name":"Meta El Paso Data Center Campus","aliases":[],"operatorCompanyId":"251e6093-c8d2-45e7-9585-eb9501a84bd4","parentCampusId":null,"lat":null,"lng":null,"streetAddress":null,"locationId":"50941799-df9d-424b-9bcb-ac459d1e38cc","status":"under_construction","facilityType":"hyperscale","criticalItMw":1000,"buildingSqft":null,"yearOperational":2028,"yearAnnounced":null,"servingUtility":null,"wikidataId":null,"osmId":null,"dataSourceFamily":"c1_operator","locationPrecision":"city","reviewStatus":"reviewed","sources":[{"url":"https://www.cnbc.com/2026/03/26/meta-to-spend-10-billion-on-ai-data-center-in-el-paso-1gw-by-2028.html"}],"notes":null,"createdAt":"2026-08-19T04:50:28.821Z","updatedAt":"2026-08-19T05:08:40.807Z","operator":{"name":"Meta (JV with BlackRock)","slug":"meta-jv-with-blackrock"},"parentCampus":null,"location":{"name":"El Paso","slug":"el-paso-texas","kind":"city","lat":31.7601001,"lng":-106.4870476},"evidence":[{"id":"185fc388-70eb-44a3-b668-dbd9f67d04af","facilityId":"35495f18-c100-4b33-be9e-10fb6e88559d","field":"critical_it_mw","value":"1 GW by 2028","asOf":null,"sourceUrl":"https://www.cnbc.com/2026/03/26/meta-to-spend-10-billion-on-ai-data-center-in-el-paso-1gw-by-2028.html","sourceType":"operator_page","tier":"claimed","note":null,"createdAt":"2026-08-19T04:50:29.218Z"},{"id":"383aff92-8d3c-4695-8f70-97a2f73f1834","facilityId":"35495f18-c100-4b33-be9e-10fb6e88559d","field":"record","value":"Meta El Paso Data Center Campus","asOf":null,"sourceUrl":"https://www.cnbc.com/2026/03/26/meta-to-spend-10-billion-on-ai-data-center-in-el-paso-1gw-by-2028.html","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T04:50:29.218Z"},{"id":"43b25f77-9222-4c39-8119-9df9f92c06b8","facilityId":"35495f18-c100-4b33-be9e-10fb6e88559d","field":"status","value":"under construction; broke ground Oct 2025, investment raised to $10B Mar 2026","asOf":null,"sourceUrl":"https://www.cnbc.com/2026/03/26/meta-to-spend-10-billion-on-ai-data-center-in-el-paso-1gw-by-2028.html","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T04:50:29.218Z"}],"resolved_facts":{"critical_it_mw":{"id":"185fc388-70eb-44a3-b668-dbd9f67d04af","facilityId":"35495f18-c100-4b33-be9e-10fb6e88559d","field":"critical_it_mw","value":"1 GW by 2028","asOf":null,"sourceUrl":"https://www.cnbc.com/2026/03/26/meta-to-spend-10-billion-on-ai-data-center-in-el-paso-1gw-by-2028.html","sourceType":"operator_page","tier":"claimed","note":null,"createdAt":"2026-08-19T04:50:29.218Z"},"record":{"id":"383aff92-8d3c-4695-8f70-97a2f73f1834","facilityId":"35495f18-c100-4b33-be9e-10fb6e88559d","field":"record","value":"Meta El Paso Data Center Campus","asOf":null,"sourceUrl":"https://www.cnbc.com/2026/03/26/meta-to-spend-10-billion-on-ai-data-center-in-el-paso-1gw-by-2028.html","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T04:50:29.218Z"},"status":{"id":"43b25f77-9222-4c39-8119-9df9f92c06b8","facilityId":"35495f18-c100-4b33-be9e-10fb6e88559d","field":"status","value":"under construction; broke ground Oct 2025, investment raised to $10B Mar 2026","asOf":null,"sourceUrl":"https://www.cnbc.com/2026/03/26/meta-to-spend-10-billion-on-ai-data-center-in-el-paso-1gw-by-2028.html","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T04:50:29.218Z"}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Meta El Paso Data Center Campus","url":"https://registry.deploy.report/datacenters/facilities/meta-el-paso-data-center-campus-tx","address":{"@type":"PostalAddress","addressLocality":"El Paso"},"additionalProperty":[{"@type":"PropertyValue","name":"operator","value":"Meta (JV with BlackRock)"}]}}