{"id":"47ab913f-2f33-4218-b873-f6c2a4e2b04a","slug":"nscale-barstow-cedarvale-tx","name":"Nscale Cedarvale Data Center (Ionic Digital lease)","aliases":[],"operatorCompanyId":"51b8d117-30f7-458b-a25a-119184c9cc05","parentCampusId":null,"lat":null,"lng":null,"streetAddress":null,"locationId":"48f7f695-2b0f-4053-bc9f-0f147c1a158f","status":"under_construction","facilityType":"hyperscale","criticalItMw":null,"buildingSqft":null,"yearOperational":2026,"yearAnnounced":null,"servingUtility":null,"wikidataId":null,"osmId":null,"dataSourceFamily":"c1_operator","locationPrecision":"exact","reviewStatus":"reviewed","sources":[{"url":"https://baxtel.com/data-center/nscale-cedarvale"}],"notes":null,"createdAt":"2026-08-19T04:40:35.048Z","updatedAt":"2026-08-19T05:08:40.807Z","operator":{"name":"Nscale","slug":"nscale"},"parentCampus":null,"location":{"name":"Barstow","slug":"barstow-texas","kind":"city","lat":31.4614691,"lng":-103.394632},"evidence":[{"id":"aead9357-2ada-4421-8258-74f5a397f32d","facilityId":"47ab913f-2f33-4218-b873-f6c2a4e2b04a","field":"critical_it_mw","value":"~240 MW reported; ~104,000 NVIDIA GB300 GPUs planned","asOf":null,"sourceUrl":"https://www.datacenterdynamics.com/en/news/nscale-to-supply-microsoft-with-additional-100000-nvidia-gpus-in-us-and-europe/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T04:40:35.568Z"},{"id":"b324f00e-4b00-4e5b-bbf4-e9ab364305eb","facilityId":"47ab913f-2f33-4218-b873-f6c2a4e2b04a","field":"record","value":"Nscale Cedarvale Data Center (Ionic Digital lease)","asOf":null,"sourceUrl":"https://baxtel.com/data-center/nscale-cedarvale","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T04:40:35.568Z"},{"id":"be52abca-8d26-46b8-9362-d884a13aa7ce","facilityId":"47ab913f-2f33-4218-b873-f6c2a4e2b04a","field":"status","value":"under construction (10-yr triple-net lease Oct 2025). Note: Barstow, TEXAS (Ward County) - not California","asOf":null,"sourceUrl":"https://baxtel.com/data-center/nscale-cedarvale","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T04:40:35.568Z"}],"resolved_facts":{"critical_it_mw":{"id":"aead9357-2ada-4421-8258-74f5a397f32d","facilityId":"47ab913f-2f33-4218-b873-f6c2a4e2b04a","field":"critical_it_mw","value":"~240 MW reported; ~104,000 NVIDIA GB300 GPUs planned","asOf":null,"sourceUrl":"https://www.datacenterdynamics.com/en/news/nscale-to-supply-microsoft-with-additional-100000-nvidia-gpus-in-us-and-europe/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T04:40:35.568Z"},"record":{"id":"b324f00e-4b00-4e5b-bbf4-e9ab364305eb","facilityId":"47ab913f-2f33-4218-b873-f6c2a4e2b04a","field":"record","value":"Nscale Cedarvale Data Center (Ionic Digital lease)","asOf":null,"sourceUrl":"https://baxtel.com/data-center/nscale-cedarvale","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T04:40:35.568Z"},"status":{"id":"be52abca-8d26-46b8-9362-d884a13aa7ce","facilityId":"47ab913f-2f33-4218-b873-f6c2a4e2b04a","field":"status","value":"under construction (10-yr triple-net lease Oct 2025). Note: Barstow, TEXAS (Ward County) - not California","asOf":null,"sourceUrl":"https://baxtel.com/data-center/nscale-cedarvale","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T04:40:35.568Z"}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Nscale Cedarvale Data Center (Ionic Digital lease)","url":"https://registry.deploy.report/datacenters/facilities/nscale-barstow-cedarvale-tx","address":{"@type":"PostalAddress","addressLocality":"Barstow"},"additionalProperty":[{"@type":"PropertyValue","name":"operator","value":"Nscale"}]}}