{"id":"6d32b5d2-4d1c-4a87-9ce9-ce13ebeb6e78","slug":"vantage-port-washington-port-washington-wisconsin","name":"Vantage Port Washington (Lighthouse)","aliases":[],"operatorCompanyId":"43c13a4e-5869-4ce0-8fb6-4b048fb7b5b2","parentCampusId":"ac248e13-c7bf-4ec3-a3bf-7819994a8940","lat":null,"lng":null,"streetAddress":null,"locationId":"5621887a-bd46-46e9-a06a-80d67a0950c0","status":"under_construction","facilityType":"hyperscale","criticalItMw":902,"buildingSqft":2500000,"yearOperational":2028,"yearAnnounced":null,"servingUtility":"We Energies","wikidataId":null,"osmId":null,"dataSourceFamily":"c1_operator","locationPrecision":"city","reviewStatus":"reviewed","sources":[{"url":"https://vantage-dc.com/data-center-locations/north-america/port-washington-wisconsin"}],"notes":null,"createdAt":"2026-08-19T02:12:18.898Z","updatedAt":"2026-08-28T04:02:36.800Z","operator":{"name":"Vantage Data Centers","slug":"vantage-data-centers"},"parentCampus":{"id":"ac248e13-c7bf-4ec3-a3bf-7819994a8940","slug":"vantage-lighthouse-port-washington-wisconsin","name":"Vantage Port Washington (Lighthouse) Campus","aliases":["Lighthouse campus","Stargate Wisconsin","Port Washington data center campus"],"locationId":"5621887a-bd46-46e9-a06a-80d67a0950c0","lat":null,"lng":null,"locationPrecision":null,"landStatus":"greenfield","lifecycleState":"under_construction","powerSourceMix":"grid","interconnectionQueueStatus":"Grid connected, in progress: Vantage is seeking a 1.3 GW connection from We Energies, with full build-out potentially requiring 3.5 GW. MISO moved the in-service date to 1 December 2027, and ATC was awarded the substations that serve the site.","interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"MISO","waterSourceNotes":"Closed-loop liquid cooling system that uses minimal water; Vantage committing a minimum of $175M to regional water/wastewater upgrades (new water tower, upgraded mains, sewer). Stated goal water-positive via restoration projects.","servingUtility":null,"acreage":672,"totalBuildingSqft":null,"streetAddress":null,"notes":"Vantage's 'Lighthouse' campus on 672 acres (of 1,644 controlled) in Port Washington, Ozaukee County, announced as a Stargate site for OpenAI and Oracle. Plans describe four buildings totaling ~902 MW; Vantage is separately seeking a ~1.3 GW grid connection (up to 3.9 GW long term) via We Energies. Strong state/utility signals: Wisconsin DNR air permit for 45 diesel generators (25-MIN-094, issued June 12 2026), wetland/stormwater approvals, and a June 2026 PSC 'very large customer' collateral tariff filing. Final energized MW and timeline beyond the announced build are not fixed.","keyFacts":[{"label":"Partners / program","value":"OpenAI, Oracle, and Vantage Data Centers Stargate campus in Port Washington, Wisconsin (outside Milwaukee), part of OpenAI/Oracle additional Stargate capacity up to 4.5 GW ([Vantage / Business Wire, Oct 22 2025](https://vantage-dc.com/news/openai-oracle-and-vantage-data-centers-announce-stargate-data-center-site-in-wisconsin/))","sourceUrl":"https://vantage-dc.com/news/openai-oracle-and-vantage-data-centers-announce-stargate-data-center-site-in-wisconsin/"},{"label":"Campus size (announced)","value":"672-acre Lighthouse campus with four single-story data centers totaling 902 MW critical IT load across 2.5 million sq ft; completion scheduled for 2028 ([Vantage Port Washington campus page](https://vantage-dc.com/data-center-locations/north-america/port-washington-wisconsin))","sourceUrl":"https://vantage-dc.com/data-center-locations/north-america/port-washington-wisconsin"},{"label":"Investment (announced)","value":"Vantage describes a $15B+ investment in the Port Washington campus ([Vantage announcement, Oct 22 2025](https://vantage-dc.com/news/openai-oracle-and-vantage-data-centers-announce-stargate-data-center-site-in-wisconsin/))","sourceUrl":"https://vantage-dc.com/news/openai-oracle-and-vantage-data-centers-announce-stargate-data-center-site-in-wisconsin/"},{"label":"Power / utility (announced)","value":"Power from We Energies (WEC Energy Group). Vantage says it is enabling new zero-emission capacity (solar, wind, battery); 70% of that new capacity allocated to Lighthouse and 30% made available to Wisconsin consumers, with remaining campus energy matched by renewable purchases annually. Dedicated rate structure intended to shield other customers from price increases ([Vantage, Oct 22 2025](https://vantage-dc.com/news/openai-oracle-and-vantage-data-centers-announce-stargate-data-center-site-in-wisconsin/))","sourceUrl":"https://vantage-dc.com/news/openai-oracle-and-vantage-data-centers-announce-stargate-data-center-site-in-wisconsin/"},{"label":"Cooling / water (announced)","value":"Closed-loop liquid cooling with minimal water; Vantage committing a minimum of $175M to regional water/wastewater and power infrastructure upgrades (new water tower, upgraded mains/sewer) and stating a water-positive goal via restoration projects ([Vantage, Oct 22 2025](https://vantage-dc.com/news/openai-oracle-and-vantage-data-centers-announce-stargate-data-center-site-in-wisconsin/))","sourceUrl":"https://vantage-dc.com/news/openai-oracle-and-vantage-data-centers-announce-stargate-data-center-site-in-wisconsin/"},{"label":"Jobs (announced)","value":"More than 4,000 skilled construction jobs expected (most union); once complete, Vantage and Oracle claim more than 1,000 long-term jobs ([Vantage, Oct 22 2025](https://vantage-dc.com/news/openai-oracle-and-vantage-data-centers-announce-stargate-data-center-site-in-wisconsin/))","sourceUrl":"https://vantage-dc.com/news/openai-oracle-and-vantage-data-centers-announce-stargate-data-center-site-in-wisconsin/"},{"label":"Sustainability design (announced)","value":"Developing 500 of 672 acres; planting more than 2,000 native trees; wetland protection; eight-foot planted berm for sound mitigation; pursuing LEED certification ([Vantage, Oct 22 2025](https://vantage-dc.com/news/openai-oracle-and-vantage-data-centers-announce-stargate-data-center-site-in-wisconsin/))","sourceUrl":"https://vantage-dc.com/news/openai-oracle-and-vantage-data-centers-announce-stargate-data-center-site-in-wisconsin/"},{"label":"Grid connection PSC approval may slip 2027 Oracle delivery (reported, Oct 2026)","value":"Reported ([reported](https://www.theregister.com/on-prem/2026/10/02/power-approval-set-to-delay-oracles-wisconsin-ai-datacenter/5300832)): The Register/Aterio say ATC transmission approval at Wisconsin PSC is the bottleneck for energizing Vantage Port Washington / Lighthouse (Oracle tenant). Cap: reported regulatory timeline risk; not a company cancellation."},{"label":"Oracle Point Beach nuclear subscribe; ~$300M We Energies customer fuel-cost savings claimed (Oct 2026)","value":"Company/utility-stated ([company-stated](https://news.we-energies.com/we-energies-agreement-with-oracle-expected-to-save-customers-approximately-300-million/); also [Journal Sentinel/Daily Reporter](https://dailyreporter.com/2026/10/02/oracle-offers-to-buy-nuclear-power-in-wisconsin/)): Oracle plans to take a slice of Point Beach nuclear output (reported ~125-250 MW) to power Lighthouse / Port Washington capacity while absorbing rising Point Beach PPA fuel costs that We Energies says burden other ratepayers (~$300M expected savings). PSC filing and approval still ahead. Cap: We Energies/Oracle announcement; complements prior ATC/PSC grid-connection delay reporting."}],"reviewStatus":"reviewed","sources":[{"url":"https://dnr.wisconsin.gov/topic/EIA/Portwashington.html","title":"Port Washington Data Center Proposal (environmental review, air permit 25-MIN-094)"},{"url":"https://www.datacenterdynamics.com/en/news/vantage-seeking-13gw-grid-connection-for-data-center-in-port-washington-wisconsin/","title":"Vantage seeking 1.3GW grid connection for data center in Port Washington"},{"url":"https://www.wispolitics.com/2026/utility-data-center-developers-want-tech-giant-exempted-from-billion-dollar-collateral-requirements/","title":"Utility, data center developers want tech giant exempted from collateral requirements"},{"url":"https://www.businesswire.com/news/home/20251022873578/en/","title":"OpenAI, Oracle and Vantage Announce Stargate Site in Wisconsin"},{"url":"https://vantage-dc.com/news/openai-oracle-and-vantage-data-centers-announce-stargate-data-center-site-in-wisconsin/","title":"OpenAI, Oracle and Vantage Announce Stargate Site in Wisconsin"},{"url":"https://vantage-dc.com/data-center-locations/north-america/port-washington-wisconsin","title":"Port Washington (Lighthouse) Data Center Campus"},{"url":"https://www.abqjournal.com/business/oracle-invokes-force-majeure-on-project-jupiter-but-says-data-center-still-on-track/3127907","title":"Oracle invokes force majeure on Project Jupiter, but says data center still on track","sourceName":"Albuquerque Journal","publishedAt":"2026-09-24"},{"url":"https://qz.com/oracle-force-majeure-new-mexico-ai-data-center-092426","title":"Oracle invokes force majeure on New Mexico AI data center","sourceName":"Quartz","publishedAt":"2026-10-03"},{"url":"https://www.theregister.com/on-prem/2026/10/02/power-approval-set-to-delay-oracles-wisconsin-ai-datacenter/5300832","title":"Power approval set to delay Oracle's Wisconsin AI datacenter","sourceName":"The Register","publishedAt":"2026-10-02"},{"url":"https://www.enr.com/articles/63720-oracle-invokes-force-majeure-as-new-mexico-project-jupiter-power-work-faces-hurdles","title":"Oracle Invokes Force Majeure as New Mexico Project Jupiter Power Work Faces Hurdles","sourceName":"Engineering News-Record","publishedAt":"2026-09-25"},{"url":"https://news.we-energies.com/we-energies-agreement-with-oracle-expected-to-save-customers-approximately-300-million/","title":"We Energies agreement with Oracle expected to save customers approximately $300 million","sourceName":"We Energies News","publishedAt":"2026-10-02"},{"url":"https://dailyreporter.com/2026/10/02/oracle-offers-to-buy-nuclear-power-in-wisconsin/","title":"Oracle plans to buy nuclear power for its data center in Wisconsin","sourceName":"Milwaukee Journal Sentinel / Daily Reporter","publishedAt":"2026-10-02"},{"url":"https://www.bizjournals.com/milwaukee/news/2026/10/02/oracle-point-beach.html","title":"Oracle to pay for nuclear power from Point Beach plant to run Port Washington data center","sourceName":"Milwaukee Business Journal","publishedAt":"2026-10-02"}],"reviewNote":null,"createdAt":"2026-08-17T20:23:02.195Z","updatedAt":"2026-10-03T21:00:58.288Z","parties":[{"id":"4773dc64-ddbc-445f-bf51-e85b96bf28fa","dataCenterId":"ac248e13-c7bf-4ec3-a3bf-7819994a8940","companyId":null,"externalName":"OpenAI","role":"offtaker","structureNotes":"Stargate program","createdAt":"2026-08-17T20:23:06.259Z","company":null},{"id":"47b64b73-6a8d-43f4-b014-b6a893ec1764","dataCenterId":"ac248e13-c7bf-4ec3-a3bf-7819994a8940","companyId":null,"externalName":"We Energies (WEC Energy Group)","role":"utility","structureNotes":"Dedicated large-customer electricity rate","createdAt":"2026-08-17T20:23:07.992Z","company":null},{"id":"be861b32-a96e-451f-9c84-ae233e3229b4","dataCenterId":"ac248e13-c7bf-4ec3-a3bf-7819994a8940","companyId":null,"externalName":"Cloverleaf Infrastructure","role":"financier","structureNotes":"Co-party on PSC collateral tariff filing","createdAt":"2026-08-17T20:23:08.761Z","company":null},{"id":"1d392b24-0370-4734-a674-04e763a8d35b","dataCenterId":"ac248e13-c7bf-4ec3-a3bf-7819994a8940","companyId":"43c13a4e-5869-4ce0-8fb6-4b048fb7b5b2","externalName":"Vantage Data Centers","role":"developer","structureNotes":"Underwriting 100% of power infrastructure","createdAt":"2026-08-17T20:23:04.629Z","company":{"id":"43c13a4e-5869-4ce0-8fb6-4b048fb7b5b2","name":"Vantage Data Centers","slug":"vantage-data-centers"}},{"id":"e4456459-a786-4078-accd-49ab0549b5ac","dataCenterId":"ac248e13-c7bf-4ec3-a3bf-7819994a8940","companyId":"43c13a4e-5869-4ce0-8fb6-4b048fb7b5b2","externalName":"Vantage Data Centers","role":"operator","structureNotes":null,"createdAt":"2026-08-17T20:23:05.505Z","company":{"id":"43c13a4e-5869-4ce0-8fb6-4b048fb7b5b2","name":"Vantage Data Centers","slug":"vantage-data-centers"}},{"id":"f019d81a-786f-4345-b92a-08839c4bfe62","dataCenterId":"ac248e13-c7bf-4ec3-a3bf-7819994a8940","companyId":"a18eca31-e45d-4693-9cd1-7d306be303fb","externalName":"Oracle","role":"offtaker","structureNotes":"Stargate program","createdAt":"2026-08-17T20:23:07.018Z","company":{"id":"a18eca31-e45d-4693-9cd1-7d306be303fb","name":"Oracle","slug":"oracle"}}],"financialClaims":[{"id":"7245daa5-62eb-4ea6-8629-8a9abb9b7703","dataCenterId":"ac248e13-c7bf-4ec3-a3bf-7819994a8940","kind":"capex","label":"Campus investment ($15B+)","valueUsd":"15000000000","capUsd":null,"conditions":null,"asOf":"2025-10-22T00:00:00.000Z","sourceUrl":"https://vantage-dc.com/news/openai-oracle-and-vantage-data-centers-announce-stargate-data-center-site-in-wisconsin/","sourceType":"press_release","evidenceTier":"reported","createdAt":"2026-08-19T00:29:07.156Z"},{"id":"b3839af1-e80b-40fe-8ab5-04ab01043232","dataCenterId":"ac248e13-c7bf-4ec3-a3bf-7819994a8940","kind":"capex","label":"Regional water/power infrastructure upgrades","valueUsd":"175000000","capUsd":null,"conditions":"Minimum commitment for water/wastewater treatment expansion, upgraded mains/sewer, new water tower and power infrastructure.","asOf":"2025-10-22T00:00:00.000Z","sourceUrl":"https://vantage-dc.com/news/openai-oracle-and-vantage-data-centers-announce-stargate-data-center-site-in-wisconsin/","sourceType":"press_release","evidenceTier":"reported","createdAt":"2026-08-19T00:29:07.923Z"}],"metricClaims":[{"id":"ab14de09-12ff-4847-a186-788aa10b6639","dataCenterId":"ac248e13-c7bf-4ec3-a3bf-7819994a8940","metricType":"jobs_construction","valueNumeric":4000,"valueText":"more than 4,000 skilled construction jobs, most union","unit":null,"grantingJurisdiction":null,"asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://vantage-dc.com/news/openai-oracle-and-vantage-data-centers-announce-stargate-data-center-site-in-wisconsin/","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":null,"createdAt":"2026-08-19T00:29:09.138Z"},{"id":"06fac8d9-5b35-4984-ab9b-0e50d1ff8735","dataCenterId":"ac248e13-c7bf-4ec3-a3bf-7819994a8940","metricType":"jobs_permanent","valueNumeric":1000,"valueText":"more than 1,000 long-term jobs (Vantage + Oracle)","unit":null,"grantingJurisdiction":null,"asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://vantage-dc.com/news/openai-oracle-and-vantage-data-centers-announce-stargate-data-center-site-in-wisconsin/","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":null,"createdAt":"2026-08-19T00:29:09.523Z"}],"powerProjects":[{"id":"4b1ccfbe-2ed9-4e67-9baf-60a94413baf4","dataCenterId":"ac248e13-c7bf-4ec3-a3bf-7819994a8940","name":"45 diesel emergency generators (Wisconsin DNR permit 25-MIN-094)","type":"grid_interconnect","capacityGw":null,"lifecycleState":"permitted","sourceUrl":"https://dnr.wisconsin.gov/topic/EIA/Portwashington.html","evidenceTier":"verified","note":"Backup generation air permit issued 2026-06-12","createdAt":"2026-08-17T20:23:04.246Z"},{"id":"473ebd89-d745-4294-b171-1dc195002f10","dataCenterId":"ac248e13-c7bf-4ec3-a3bf-7819994a8940","name":"New generation for Lighthouse campus","type":"other","capacityGw":2,"lifecycleState":"announced","sourceUrl":"https://vantage-dc.com/news/openai-oracle-and-vantage-data-centers-announce-stargate-data-center-site-in-wisconsin/","evidenceTier":"reported","note":"Partners cite 'nearly two gigawatts of new energy to the grid,' allocated ~70% to campus / ~30% to Wisconsin consumers; described as zero-emission energy capacity. No generation technology confirmed.","createdAt":"2026-08-19T00:29:08.747Z"}],"capacityClaims":[{"id":"e454abd4-3c27-4b61-ac68-f92093b7c395","dataCenterId":"ac248e13-c7bf-4ec3-a3bf-7819994a8940","series":"announced","valueGw":0.902,"asOf":"2025-10-22T00:00:00.000Z","sourceUrl":"https://www.businesswire.com/news/home/20251022873578/en/","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"Four buildings, ~902 MW across 2.5M sq ft, target 2028","createdAt":"2026-08-17T20:23:02.875Z"},{"id":"1b8def8e-4528-447c-bc44-0e115ab858f9","dataCenterId":"ac248e13-c7bf-4ec3-a3bf-7819994a8940","series":"contracted","valueGw":1.3,"asOf":"2025-10-01T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/vantage-seeking-13gw-grid-connection-for-data-center-in-port-washington-wisconsin/","sourceType":"utility_filing","evidenceTier":"reported","supersedesId":null,"note":"~1.3 GW grid connection sought near-term via We Energies; up to 3.9 GW long term","createdAt":"2026-08-17T20:23:03.709Z"}],"events":[{"id":"22c10d55-72f7-4a8d-8990-c7fc20f8cfe6","dataCenterId":"ac248e13-c7bf-4ec3-a3bf-7819994a8940","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: Regional water/power infrastructure upgrades","occurredAt":"2026-08-19T00:29:08.311Z","createdAt":"2026-08-19T00:29:08.311Z"},{"id":"975e844c-e999-455a-989e-4a05fef6b9e2","dataCenterId":"ac248e13-c7bf-4ec3-a3bf-7819994a8940","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: Campus investment ($15B+)","occurredAt":"2026-08-19T00:29:07.536Z","createdAt":"2026-08-19T00:29:07.536Z"},{"id":"c9fe7868-b3c5-4cea-92a6-c2ff741cdc8e","dataCenterId":"ac248e13-c7bf-4ec3-a3bf-7819994a8940","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"financier: Cloverleaf Infrastructure","occurredAt":"2026-08-17T20:23:09.141Z","createdAt":"2026-08-17T20:23:09.141Z"},{"id":"917cc96a-11d6-44ec-98f3-fb96e90e9002","dataCenterId":"ac248e13-c7bf-4ec3-a3bf-7819994a8940","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: We Energies (WEC Energy Group)","occurredAt":"2026-08-17T20:23:08.375Z","createdAt":"2026-08-17T20:23:08.375Z"},{"id":"4dada2cb-b4fc-4b13-80ba-3c36e84e52d1","dataCenterId":"ac248e13-c7bf-4ec3-a3bf-7819994a8940","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"offtaker: Oracle","occurredAt":"2026-08-17T20:23:07.522Z","createdAt":"2026-08-17T20:23:07.522Z"},{"id":"b84117f8-0ee6-4447-8640-0579cc68393e","dataCenterId":"ac248e13-c7bf-4ec3-a3bf-7819994a8940","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"offtaker: OpenAI","occurredAt":"2026-08-17T20:23:06.643Z","createdAt":"2026-08-17T20:23:06.643Z"},{"id":"1a323e5c-79f3-411d-902b-65630bfcd809","dataCenterId":"ac248e13-c7bf-4ec3-a3bf-7819994a8940","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"operator: Vantage Data Centers","occurredAt":"2026-08-17T20:23:05.883Z","createdAt":"2026-08-17T20:23:05.883Z"},{"id":"5738e38f-1264-4b34-87be-38a4a5d137b2","dataCenterId":"ac248e13-c7bf-4ec3-a3bf-7819994a8940","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: Vantage Data Centers","occurredAt":"2026-08-17T20:23:05.002Z","createdAt":"2026-08-17T20:23:05.002Z"},{"id":"33c5869d-394f-4f69-9ce3-34b023edc289","dataCenterId":"ac248e13-c7bf-4ec3-a3bf-7819994a8940","eventType":"capacity_changed","series":"contracted","oldValue":null,"newValue":"1.3","claimId":"1b8def8e-4528-447c-bc44-0e115ab858f9","detail":null,"occurredAt":"2026-08-17T20:23:04.014Z","createdAt":"2026-08-17T20:23:04.014Z"},{"id":"5e3b3840-3a0c-468c-86da-f58fadec1f43","dataCenterId":"ac248e13-c7bf-4ec3-a3bf-7819994a8940","eventType":"claim_recorded","series":"contracted","oldValue":null,"newValue":"1.3","claimId":"1b8def8e-4528-447c-bc44-0e115ab858f9","detail":"reported · utility_filing","occurredAt":"2026-08-17T20:23:03.862Z","createdAt":"2026-08-17T20:23:03.862Z"},{"id":"38e78920-7767-4448-93f7-27fe1fd762de","dataCenterId":"ac248e13-c7bf-4ec3-a3bf-7819994a8940","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"0.902","claimId":"e454abd4-3c27-4b61-ac68-f92093b7c395","detail":null,"occurredAt":"2026-08-17T20:23:03.177Z","createdAt":"2026-08-17T20:23:03.177Z"},{"id":"65ab5b23-de4d-422c-abfa-11be55d9960c","dataCenterId":"ac248e13-c7bf-4ec3-a3bf-7819994a8940","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"0.902","claimId":"e454abd4-3c27-4b61-ac68-f92093b7c395","detail":"reported · press_release","occurredAt":"2026-08-17T20:23:03.029Z","createdAt":"2026-08-17T20:23:03.029Z"}]},"location":{"name":"Port Washington","slug":"port-washington-wisconsin","kind":"city","lat":43.3885538,"lng":-87.8692845},"evidence":[{"id":"969717a0-4da8-40eb-8f30-21247997bc55","facilityId":"6d32b5d2-4d1c-4a87-9ce9-ce13ebeb6e78","field":"building_sqft","value":"2500000","asOf":null,"sourceUrl":"https://vantage-dc.com/data-center-locations/north-america/port-washington-wisconsin","sourceType":"operator_page","tier":"claimed","note":null,"createdAt":"2026-08-19T02:12:19.276Z"},{"id":"23f0a7a3-91d2-4d82-b689-75f6b1ec9bb8","facilityId":"6d32b5d2-4d1c-4a87-9ce9-ce13ebeb6e78","field":"critical_it_mw","value":"902","asOf":null,"sourceUrl":"https://vantage-dc.com/data-center-locations/north-america/port-washington-wisconsin","sourceType":"operator_page","tier":"claimed","note":null,"createdAt":"2026-08-19T02:12:19.276Z"},{"id":"49357a7e-8695-4160-91c0-574efeac7707","facilityId":"6d32b5d2-4d1c-4a87-9ce9-ce13ebeb6e78","field":"record","value":"Vantage Port Washington (Lighthouse)","asOf":null,"sourceUrl":"https://vantage-dc.com/data-center-locations/north-america/port-washington-wisconsin","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T02:12:19.276Z"},{"id":"e9e5b2f4-a316-4351-b387-71fc4dbc7891","facilityId":"6d32b5d2-4d1c-4a87-9ce9-ce13ebeb6e78","field":"servingUtility","value":"We Energies","asOf":null,"sourceUrl":"https://vantage-dc.com/data-center-locations/north-america/port-washington-wisconsin","sourceType":"operator","tier":"reported","note":null,"createdAt":"2026-08-21T22:14:42.339Z"},{"id":"3a0fcfcb-65da-46fc-a679-3d1c32a23787","facilityId":"6d32b5d2-4d1c-4a87-9ce9-ce13ebeb6e78","field":"status","value":"under_construction","asOf":null,"sourceUrl":"https://vantage-dc.com/data-center-locations/north-america/port-washington-wisconsin","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T02:12:19.276Z"}],"resolved_facts":{"building_sqft":{"id":"969717a0-4da8-40eb-8f30-21247997bc55","facilityId":"6d32b5d2-4d1c-4a87-9ce9-ce13ebeb6e78","field":"building_sqft","value":"2500000","asOf":null,"sourceUrl":"https://vantage-dc.com/data-center-locations/north-america/port-washington-wisconsin","sourceType":"operator_page","tier":"claimed","note":null,"createdAt":"2026-08-19T02:12:19.276Z"},"critical_it_mw":{"id":"23f0a7a3-91d2-4d82-b689-75f6b1ec9bb8","facilityId":"6d32b5d2-4d1c-4a87-9ce9-ce13ebeb6e78","field":"critical_it_mw","value":"902","asOf":null,"sourceUrl":"https://vantage-dc.com/data-center-locations/north-america/port-washington-wisconsin","sourceType":"operator_page","tier":"claimed","note":null,"createdAt":"2026-08-19T02:12:19.276Z"},"record":{"id":"49357a7e-8695-4160-91c0-574efeac7707","facilityId":"6d32b5d2-4d1c-4a87-9ce9-ce13ebeb6e78","field":"record","value":"Vantage Port Washington (Lighthouse)","asOf":null,"sourceUrl":"https://vantage-dc.com/data-center-locations/north-america/port-washington-wisconsin","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T02:12:19.276Z"},"servingUtility":{"id":"e9e5b2f4-a316-4351-b387-71fc4dbc7891","facilityId":"6d32b5d2-4d1c-4a87-9ce9-ce13ebeb6e78","field":"servingUtility","value":"We Energies","asOf":null,"sourceUrl":"https://vantage-dc.com/data-center-locations/north-america/port-washington-wisconsin","sourceType":"operator","tier":"reported","note":null,"createdAt":"2026-08-21T22:14:42.339Z"},"status":{"id":"3a0fcfcb-65da-46fc-a679-3d1c32a23787","facilityId":"6d32b5d2-4d1c-4a87-9ce9-ce13ebeb6e78","field":"status","value":"under_construction","asOf":null,"sourceUrl":"https://vantage-dc.com/data-center-locations/north-america/port-washington-wisconsin","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T02:12:19.276Z"}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Vantage Port Washington (Lighthouse)","url":"https://registry.deploy.report/datacenters/facilities/vantage-port-washington-port-washington-wisconsin","address":{"@type":"PostalAddress","addressLocality":"Port Washington"},"additionalProperty":[{"@type":"PropertyValue","name":"operator","value":"Vantage Data Centers"}]}}