{"id":"506b1871-f8ed-4757-ae33-aba491bd3cb6","slug":"vantage-tx22-san-antonio-bexar-county-tx","name":"Vantage TX22 (San Antonio)","aliases":[],"operatorCompanyId":"43c13a4e-5869-4ce0-8fb6-4b048fb7b5b2","parentCampusId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","lat":29.4774324,"lng":-98.6976084,"streetAddress":"5207 Rogers Rd, San Antonio, TX","locationId":"8c451bb9-eebd-4176-8769-5faee040cbc5","status":"under_construction","facilityType":"hyperscale","criticalItMw":null,"buildingSqft":214525,"yearOperational":2027,"yearAnnounced":null,"servingUtility":null,"wikidataId":null,"osmId":null,"dataSourceFamily":"c1_operator","locationPrecision":"exact","reviewStatus":"reviewed","sources":[{"url":"https://www.datacentermap.com/usa/texas/san-antonio/vantage-tx22-san-antonio/"}],"notes":null,"createdAt":"2026-08-19T04:49:52.047Z","updatedAt":"2026-08-28T04:02:43.432Z","operator":{"name":"Vantage Data Centers","slug":"vantage-data-centers"},"parentCampus":{"id":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","slug":"vantage-tx1-san-antonio-bexar-texas","name":"Vantage TX1 San Antonio Campus","aliases":["Vantage TX1","Vantage San Antonio","TX12"],"locationId":"8c451bb9-eebd-4176-8769-5faee040cbc5","lat":29.44697655,"lng":-98.74359165,"locationPrecision":"exact","landStatus":"private","lifecycleState":"partially_energized","powerSourceMix":"mixed","interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"ERCOT","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Vantage's San Antonio (Bexar County) campuses hold TCEQ minor air permits and are seeking to expand from 22 to 80+ generators; VoltaGrid is building ~423 MW of on-site natural-gas generation across two Vantage sites (near SH-151/Wiseman and on Omicron Drive). This is distinct from Vantage's Frontier campus in Shackelford County. Total IT capacity is reported in ranges (TX1 ~100-250 MW) and not firmly disclosed.","keyFacts":[{"label":"TX11 building / 32 MW (primary TDLR)","value":"Texas Department of Licensing and Regulation project TABS2024007561 lists Data Center Building TX11 at 14720 Omicron Dr., San Antonio, Bexar County, owned by Vantage Data Centers TX1 LLC: two-story, 242,667 sq ft, four 8 MW data halls for 32 MW total capacity, estimated cost $95,823,731, start 12/15/2023, completion 9/1/2026, privately funded new construction ([TDLR TABS2024007561](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2024007561))","sourceUrl":"https://www.tdlr.texas.gov/TABS/Search/Project/TABS2024007561"},{"label":"TX12 second building / up to 96 MW (reported DCD via TDLR)","value":"DCD reports (Sep 23 2025) Vantage filed a TDLR application for TX12 at 17420 Omicron Drive on the TX1 campus: two-story building with up to 96 MW of critical IT capacity across about 432,800 sq ft, estimated $276.8 million, schedule October 2025 to August 2027, Jacobs as design firm. DCD also states Vantage acquired Omicron Drive land in July 2023 from the University of Texas System Board of Regents and that TX11 was filed December 2023 targeting early 2026 go-live ([DCD, Sep 23 2025](https://www.datacenterdynamics.com/en/news/vantage-files-to-build-second-san-antonio-data-center-in-texas/))","sourceUrl":"https://www.datacenterdynamics.com/en/news/vantage-files-to-build-second-san-antonio-data-center-in-texas/"},{"label":"Campus location / market neighbors (reported)","value":"DCD places the Omicron Drive campus near a large Microsoft campus at 15000 Lambda Drive and notes CloudHQ, CyrusOne, and QTS interest in the Texas Research Park area plus Amazon planning three San Antonio-area data centers. Treat neighbor list as journalist market context ([DCD, Sep 23 2025](https://www.datacenterdynamics.com/en/news/vantage-files-to-build-second-san-antonio-data-center-in-texas/))","sourceUrl":"https://www.datacenterdynamics.com/en/news/vantage-files-to-build-second-san-antonio-data-center-in-texas/"}],"reviewStatus":"reviewed","sources":[{"url":"https://www.datacenterdynamics.com/en/news/vantage-files-to-build-second-san-antonio-data-center-in-texas/","date":"2026-07-01","title":"Vantage files to build second San Antonio data center in Texas","publisher":"DCD"},{"url":"https://www.ksat.com/news/local/2026/07/10/air-quality-concerns-rise-as-data-center-company-seeks-approval-to-run-diesel-generators/","date":"2026-07-10","title":"Air quality concerns rise as data center company seeks approval to run diesel generators","publisher":"KSAT"},{"url":"https://www.tdlr.texas.gov/TABS/Search/Project/TABS2024007561","date":"2023-12-15","title":"TDLR TABS2024007561 — Data Center Building TX11","publisher":"Texas Department of Licensing and Regulation"}],"reviewNote":null,"createdAt":"2026-08-17T20:24:09.801Z","updatedAt":"2026-09-29T06:43:43.355Z","parties":[{"id":"76bcc083-b732-477e-ba3d-9ad2920119dc","dataCenterId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","companyId":null,"externalName":"VoltaGrid","role":"utility","structureNotes":"On-site gas generation operator","createdAt":"2026-08-17T20:24:11.321Z","company":null},{"id":"89049fb1-5cfd-4897-8101-ad3f6659f691","dataCenterId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","companyId":"43c13a4e-5869-4ce0-8fb6-4b048fb7b5b2","externalName":"Vantage Data Centers","role":"developer","structureNotes":"DigitalBridge-backed","createdAt":"2026-08-17T20:24:10.564Z","company":{"id":"43c13a4e-5869-4ce0-8fb6-4b048fb7b5b2","name":"Vantage Data Centers","slug":"vantage-data-centers"}},{"id":"f0bd8a4a-38ea-4e87-8493-7206ff58848a","dataCenterId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","companyId":null,"externalName":"Bandera Electric Cooperative","role":"utility","structureNotes":"Local electric distribution utility listed for the Rogers Rd (TX2) site (not CPS Energy).","createdAt":"2026-08-19T00:15:01.612Z","company":null}],"financialClaims":[{"id":"9aab56f4-e13c-4420-9cd0-81c06ee461ff","dataCenterId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","kind":"capex","label":"Omicron campus investment","valueUsd":"448000000","capUsd":null,"conditions":"Described as Vantage's record Bexar County investment; >$1B combined registered along the Omicron corridor since 2020 (corridor-level).","asOf":"2026-08-01T00:00:00.000Z","sourceUrl":"https://www.yahoo.com/news/articles/data-center-boom-across-san-120800855.html","sourceType":"journalist_report","evidenceTier":"reported","createdAt":"2026-08-19T00:15:00.063Z"}],"metricClaims":[],"powerProjects":[{"id":"c363a845-153f-45f6-9d53-df58d70f91fc","dataCenterId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","name":"VoltaGrid on-site gas generation (Vantage SA)","type":"gas","capacityGw":0.423,"lifecycleState":"under_construction","sourceUrl":"https://www.ksat.com/news/local/2026/07/10/air-quality-concerns-rise-as-data-center-company-seeks-approval-to-run-diesel-generators/","evidenceTier":"reported","note":"~423 MW dedicated generation across two Vantage SA sites","createdAt":"2026-08-17T20:24:10.182Z"},{"id":"1b54a486-a456-49f3-a09c-d0ebe8d90808","dataCenterId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","name":"VoltaGrid on-site natural-gas prime power (San Antonio)","type":"gas","capacityGw":0.423,"lifecycleState":"partially_energized","sourceUrl":"https://insideclimatenews.org/news/22072026/texas-data-center-air-pollution-lawsuit/","evidenceTier":"reported","note":"~423 MW dedicated prime natural-gas generation across two Vantage SA sites combined (one operating, one under construction); ~151 diesel backup generators; TCEQ minor-source permits expanding from 22 to 80+.","createdAt":"2026-08-19T00:15:00.826Z"}],"capacityClaims":[{"id":"746a9f40-5494-4c16-8b3d-04451f0d0b84","dataCenterId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","series":"under_construction","valueGw":0.096,"asOf":"2026-08-01T00:00:00.000Z","sourceUrl":"https://www.datacenters.com/vantage-tx12-san-antonio","sourceType":"tracker","evidenceTier":"claimed","supersedesId":null,"note":"Building TX12 (Omicron Dr campus): up to 96 MW critical IT, two-story, 432,800 sq ft.","createdAt":"2026-08-19T00:14:58.831Z"},{"id":"010a2a79-15dc-479a-9683-05c605372873","dataCenterId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","series":"under_construction","valueGw":0.032,"asOf":"2026-08-01T00:00:00.000Z","sourceUrl":"https://www.datacenters.com/vantage-tx11-san-antonio","sourceType":"tracker","evidenceTier":"claimed","supersedesId":null,"note":"Building TX11: 32 MW critical IT, 242,665 sq ft, go-live early 2026.","createdAt":"2026-08-19T00:14:59.684Z"}],"events":[{"id":"ab5633a1-6e3a-4884-bb66-f70e6b1cacc0","dataCenterId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: Bandera Electric Cooperative","occurredAt":"2026-08-19T00:15:01.996Z","createdAt":"2026-08-19T00:15:01.996Z"},{"id":"e2582843-25fd-410e-838b-65e22406d602","dataCenterId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: Omicron campus investment","occurredAt":"2026-08-19T00:15:00.443Z","createdAt":"2026-08-19T00:15:00.443Z"},{"id":"65a6a432-6811-446e-9175-66cd5bbe620f","dataCenterId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","eventType":"claim_recorded","series":"under_construction","oldValue":null,"newValue":"0.032","claimId":"010a2a79-15dc-479a-9683-05c605372873","detail":"claimed · tracker","occurredAt":"2026-08-19T00:14:59.837Z","createdAt":"2026-08-19T00:14:59.837Z"},{"id":"7fc90eb0-c82f-495b-b1ae-707c200d3462","dataCenterId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","eventType":"capacity_changed","series":"under_construction","oldValue":null,"newValue":"0.096","claimId":"746a9f40-5494-4c16-8b3d-04451f0d0b84","detail":null,"occurredAt":"2026-08-19T00:14:59.133Z","createdAt":"2026-08-19T00:14:59.133Z"},{"id":"edc4e251-ebbd-4fa4-ba9d-7a1a78c0890c","dataCenterId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","eventType":"claim_recorded","series":"under_construction","oldValue":null,"newValue":"0.096","claimId":"746a9f40-5494-4c16-8b3d-04451f0d0b84","detail":"claimed · tracker","occurredAt":"2026-08-19T00:14:58.983Z","createdAt":"2026-08-19T00:14:58.983Z"},{"id":"54a1db1f-d2da-4d4d-904f-c3b0dce18a54","dataCenterId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: VoltaGrid","occurredAt":"2026-08-17T20:24:11.710Z","createdAt":"2026-08-17T20:24:11.710Z"},{"id":"00799191-0db6-45dc-937e-a56518820d49","dataCenterId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: Vantage Data Centers","occurredAt":"2026-08-17T20:24:10.948Z","createdAt":"2026-08-17T20:24:10.948Z"}]},"location":{"name":"San Antonio","slug":"san-antonio-texas","kind":"city","lat":29.4246002,"lng":-98.4951405},"evidence":[{"id":"e7e0718b-b22d-474a-8b40-56d64225a135","facilityId":"506b1871-f8ed-4757-ae33-aba491bd3cb6","field":"building_sqft","value":"214,525","asOf":null,"sourceUrl":"https://www.datacentermap.com/usa/texas/san-antonio/vantage-tx22-san-antonio/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T04:49:52.481Z"},{"id":"f5862615-ee9a-4339-a138-5d44717ddf29","facilityId":"506b1871-f8ed-4757-ae33-aba491bd3cb6","field":"record","value":"Vantage TX22 (San Antonio)","asOf":null,"sourceUrl":"https://www.datacentermap.com/usa/texas/san-antonio/vantage-tx22-san-antonio/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T04:49:52.481Z"},{"id":"8ec6c4f2-f708-451c-9c4b-4d5538f95ef9","facilityId":"506b1871-f8ed-4757-ae33-aba491bd3cb6","field":"status","value":"under construction; $272M, build Oct 2025-Jun 2027 (distinct from Frontier campus)","asOf":null,"sourceUrl":"https://www.datacentermap.com/usa/texas/san-antonio/vantage-tx22-san-antonio/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T04:49:52.481Z"},{"id":"9bf0cb8a-c2ca-4ce6-b77e-630d9efdec5a","facilityId":"506b1871-f8ed-4757-ae33-aba491bd3cb6","field":"streetAddress","value":"5207 Rogers Rd, San Antonio, TX","asOf":null,"sourceUrl":"https://baxtel.com/data-center/vantage-tx22","sourceType":"operator","tier":"reported","note":null,"createdAt":"2026-08-21T22:14:49.602Z"}],"resolved_facts":{"building_sqft":{"id":"e7e0718b-b22d-474a-8b40-56d64225a135","facilityId":"506b1871-f8ed-4757-ae33-aba491bd3cb6","field":"building_sqft","value":"214,525","asOf":null,"sourceUrl":"https://www.datacentermap.com/usa/texas/san-antonio/vantage-tx22-san-antonio/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T04:49:52.481Z"},"record":{"id":"f5862615-ee9a-4339-a138-5d44717ddf29","facilityId":"506b1871-f8ed-4757-ae33-aba491bd3cb6","field":"record","value":"Vantage TX22 (San Antonio)","asOf":null,"sourceUrl":"https://www.datacentermap.com/usa/texas/san-antonio/vantage-tx22-san-antonio/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T04:49:52.481Z"},"status":{"id":"8ec6c4f2-f708-451c-9c4b-4d5538f95ef9","facilityId":"506b1871-f8ed-4757-ae33-aba491bd3cb6","field":"status","value":"under construction; $272M, build Oct 2025-Jun 2027 (distinct from Frontier campus)","asOf":null,"sourceUrl":"https://www.datacentermap.com/usa/texas/san-antonio/vantage-tx22-san-antonio/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T04:49:52.481Z"},"streetAddress":{"id":"9bf0cb8a-c2ca-4ce6-b77e-630d9efdec5a","facilityId":"506b1871-f8ed-4757-ae33-aba491bd3cb6","field":"streetAddress","value":"5207 Rogers Rd, San Antonio, TX","asOf":null,"sourceUrl":"https://baxtel.com/data-center/vantage-tx22","sourceType":"operator","tier":"reported","note":null,"createdAt":"2026-08-21T22:14:49.602Z"}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Vantage TX22 (San Antonio)","url":"https://registry.deploy.report/datacenters/facilities/vantage-tx22-san-antonio-bexar-county-tx","geo":{"@type":"GeoCoordinates","latitude":29.4774324,"longitude":-98.6976084},"address":{"@type":"PostalAddress","addressLocality":"San Antonio","streetAddress":"5207 Rogers Rd, San Antonio, TX"},"additionalProperty":[{"@type":"PropertyValue","name":"operator","value":"Vantage Data Centers"}]}}