{"id":"10010870-fc71-428e-b78e-66f972d37c33","slug":"fermi-amarillo-texas","name":"Fermi America HyperGrid (Project Matador)","aliases":[],"locationId":"6849f027-3dde-4d07-a4fc-819337209551","lat":35.2837621,"lng":-101.568974,"locationPrecision":"exact","landStatus":"private","lifecycleState":"under_construction","powerSourceMix":"mixed","interconnectionQueueStatus":"No interconnection queue position: the campus is built behind the meter, generating its own power on site rather than waiting for a grid connection. The Panhandle location sits in Southwest Power Pool territory served by Xcel, not ERCOT.","interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"SPP","waterSourceNotes":"Municipal water off the Ogallala. Amarillo agreed to sell the campus 2.5 million gallons a day on a 20 year contract with two 10 year renewal options, at twice the rate a commercial user inside the city pays, and Fermi covers the cost of the two new Carson County wells the city needs to supply it. Fermi's own filing puts its expected need at up to 5.5 million gallons a day, and the city expects it back asking for that. Use is metered, but neither the water agreement nor the tax abatement says what happens if Fermi exceeds it.","servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Fermi America (Fermi Inc, co-founded by former Energy Secretary Rick Perry, partnered with the Texas Tech University System) is building 'Project Matador,' an announced 11 GW behind-the-meter HyperGrid campus on ~7,570 acres near the DOE Pantex plant in Amarillo, combining nuclear, combined-cycle gas, solar, wind and battery storage on a private grid rather than the public network. The generation is the story and is largely unbuilt: the first 1 GW is targeted online by late 2026, and Fermi is delivering an initial 2.3 GW phase. Fermi went public on Nasdaq (~$15B valuation, $682.5M IPO raise) with over $1.4B invested in site buildout to date.","keyFacts":[{"label":"Project name","value":"Project Matador — Fermi America private HyperGrid™ power and AI campus in the Texas Panhandle near Amarillo ([Fermi America](https://fermiamerica.com/))","sourceUrl":"https://fermiamerica.com/"},{"label":"Announced campus scale","value":"Company markets a 17 GW private power HyperGrid campus on about 8,400 acres; states roughly 6 GW already permitted ([Fermi America](https://fermiamerica.com/); [Mar 27 2026 PR on second 5 GW TCEQ air-permit application](https://www.prnewswire.com/news-releases/fermi-america-files-second-clean-air-permit-application-with-tceq-for-5-gw-of-additional-power-for-its-project-matador-private-grid-302727777.html))","sourceUrl":"https://fermiamerica.com/"},{"label":"Power design","value":"Private behind-the-meter mix: company describes day-one gas, long-horizon nuclear, plus solar and battery bridge capacity rather than relying on the public ERCOT queue for day-to-day hyperscale load ([Fermi America](https://fermiamerica.com/))","sourceUrl":"https://fermiamerica.com/"},{"label":"Site advantages (company-stated)","value":"Adjacent to the DOE Pantex complex; access to water, major natural-gas pipelines, and high-capacity fiber ([Fermi America](https://fermiamerica.com/))","sourceUrl":"https://fermiamerica.com/"},{"label":"Financing (company-stated)","value":"Company states nearly $1B in committed financing from leading lenders ([Fermi America](https://fermiamerica.com/))","sourceUrl":"https://fermiamerica.com/"},{"label":"First power (targeted)","value":"Company working to bring first power online in 2026 ([Fermi America](https://fermiamerica.com/))","sourceUrl":"https://fermiamerica.com/"},{"label":"Generation assets on site (Sep 2026)","value":"First power-generation assets arrived at the Amarillo-area site: Siemens Energy SGT6-5000F gas turbines ([Fermi America, Sep 18 2026](https://fermiamerica.com/first-power-generation-assets-arrive-at-project-matador/))","sourceUrl":"https://fermiamerica.com/first-power-generation-assets-arrive-at-project-matador/"},{"label":"Tenant (company-stated)","value":"Binding lease agreement with TensorWave announced on company homepage as one of the first commercial tenant commitments ([Fermi America](https://fermiamerica.com/))","sourceUrl":"https://fermiamerica.com/"},{"label":"Scale path note","value":"Earlier registry notes framed an 11 GW plan on ~7,570 acres; current company site and Mar 2026 PR describe a path toward ~17 GW (11 GW clean gas target plus other sources) on ~8,400 acres. Prefer the later company figures; treat older note figures as superseded framing.","sourceUrl":"https://fermiamerica.com/"}],"reviewStatus":"reviewed","sources":[{"url":"https://www.texastech.edu/stories/25-06-ttu-system-and-fermi-america-announce-partnership.php","title":"TTU System and Fermi America Announce the World's Largest Advanced Energy and Intelligence Campus","sourceName":"Texas Tech University System"},{"url":"https://www.datacenterdynamics.com/en/news/fermi-makes-stock-market-debut-valued-at-almost-15bn/","title":"Fermi makes stock market debut, valued at almost $15bn","sourceName":"DataCenterDynamics"},{"url":"https://www.prnewswire.com/news-releases/fermi-america-makes-initial-draw-on-200-million-equipment-facility-from-keystone-national-group-and-cape-commercial-finance-to-accelerate-the-delivery-of-the-first-2-3gw-of-project-matadors-11gw-private-hypergrid-campus-302693111.html","title":"Fermi America Makes Initial Draw on $200M Equipment Facility to Accelerate First 2.3GW of Project Matador's 11GW HyperGrid","sourceName":"PR Newswire / Fermi America"},{"url":"https://www.sec.gov/Archives/edgar/data/0002071778/000121390026078366/ea029807401ex99-1.htm","title":"Fermi Inc. Form 8-K FY2026 exhibit","sourceName":"SEC EDGAR"},{"url":"https://www.gem.wiki/Fermi_America_Project_Matador_power_station","title":"Fermi America Project Matador power station","sourceName":"Global Energy Monitor"},{"url":"https://www.prnewswire.com/news-releases/fermi-america-and-mvm-egi-announce-water-saving-hybrid-cooling-agreement-for-worlds-largest-private-energy-grid-delivering-on-promises-made-to-protect-west-texas-water-resources-302628904.html","title":"Fermi America and MVM EGI Announce Water-Saving Hybrid Cooling Agreement","sourceName":"PR Newswire"},{"url":"https://amarillotribune.org/2025/11/05/just-facts-fermi-america-and-project-matador/","title":"Just facts: Fermi America and Project Matador","sourceName":"Amarillo Tribune"},{"url":"https://fermiamerica.com/","title":"Fermi America — Project Matador","publisher":"Fermi America"},{"url":"https://fermiamerica.com/first-power-generation-assets-arrive-at-project-matador/","date":"2026-09-18","title":"First Power Generation Assets Arrive at Project Matador","publisher":"Fermi America"},{"url":"https://www.prnewswire.com/news-releases/fermi-america-files-second-clean-air-permit-application-with-tceq-for-5-gw-of-additional-power-for-its-project-matador-private-grid-302727777.html","date":"2026-03-27","title":"Fermi America Files Second Clean Air Permit Application with TCEQ for 5 GW","publisher":"PR Newswire / Fermi America"}],"reviewNote":null,"createdAt":"2026-08-17T18:12:44.213Z","updatedAt":"2026-09-28T04:25:33.821Z","location":{"id":"6849f027-3dde-4d07-a4fc-819337209551","name":"Amarillo","slug":"amarillo-texas","kind":"city","parentLocationId":"45f67762-10f4-4255-be84-45c73efe25f9","region":"Texas","lat":35.3187,"lng":-101.5601,"reviewStatus":"reviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-17T18:12:43.819Z","updatedAt":"2026-08-21T17:59:24.016Z"},"parties":[{"id":"1e8c9a8d-8ce4-43c5-ad77-93a2fcfa4dda","dataCenterId":"10010870-fc71-428e-b78e-66f972d37c33","companyId":null,"externalName":"Fermi America (Fermi Inc)","role":"developer","structureNotes":"Developer/owner; co-founded by former US Energy Secretary Rick Perry. Publicly traded on Nasdaq.","createdAt":"2026-08-17T18:12:49.818Z","company":null},{"id":"e5bfb3fb-fdcc-4ed0-b0ed-4e93b949d3d8","dataCenterId":"10010870-fc71-428e-b78e-66f972d37c33","companyId":null,"externalName":"Texas Tech University System","role":"developer","structureNotes":"Partner in the HyperGrid campus.","createdAt":"2026-08-17T18:12:50.569Z","company":null},{"id":"62157e9d-6c82-4378-ba1b-3dd1c1c48745","dataCenterId":"10010870-fc71-428e-b78e-66f972d37c33","companyId":null,"externalName":"Keystone National Group / Cape Commercial Finance","role":"financier","structureNotes":"$200M equipment financing facility.","createdAt":"2026-08-17T18:12:51.331Z","company":null},{"id":"6f55c14e-2845-47a8-9074-d26c13904a10","dataCenterId":"10010870-fc71-428e-b78e-66f972d37c33","companyId":null,"externalName":"SPP","role":"grid_operator","structureNotes":"Amarillo/Texas Panhandle sits in SPP territory; however the campus is designed behind-the-meter on a private grid, cutting out utilities.","createdAt":"2026-08-17T18:12:52.131Z","company":null}],"capacityClaims":[{"id":"b2cdcc96-3daa-4b4a-87b8-637509ab2a79","dataCenterId":"10010870-fc71-428e-b78e-66f972d37c33","series":"announced","valueGw":11,"asOf":"2025-06-26T00:00:00.000Z","sourceUrl":"https://www.texastech.edu/stories/25-06-ttu-system-and-fermi-america-announce-partnership.php","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":"Up to 11 GW of power and 18M sq ft of AI capacity across ~5,800 acres (site total ~7,570 acres secured/leased).","createdAt":"2026-08-17T18:12:44.900Z"},{"id":"57104b60-2ed1-4b39-9f2c-c8c37a5e791e","dataCenterId":"10010870-fc71-428e-b78e-66f972d37c33","series":"energized","valueGw":0,"asOf":"2026-08-17T00:00:00.000Z","sourceUrl":"https://www.myhighplains.com/news/your-local-election-hq/amarillo-ai-data-center-project/fermi-america-pauses-construction-near-amarillo-while-waiting-for-tceq-permits/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Project Matador/HyperGrid construction paused awaiting TCEQ air permits; ~1.1 GW-by-end-2026 goal pulled back to phased Phase-1 startup in H1 2027. Turbines in refurbishment/transit. Nothing energized.","createdAt":"2026-08-17T18:33:36.534Z"},{"id":"9da59816-3a06-49e5-983f-2a9cf68bdac6","dataCenterId":"10010870-fc71-428e-b78e-66f972d37c33","series":"under_construction","valueGw":2.3,"asOf":"2026-01-01T00:00:00.000Z","sourceUrl":"https://www.prnewswire.com/news-releases/fermi-america-makes-initial-draw-on-200-million-equipment-facility-from-keystone-national-group-and-cape-commercial-finance-to-accelerate-the-delivery-of-the-first-2-3gw-of-project-matadors-11gw-private-hypergrid-campus-302693111.html","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":"First 2.3 GW phase being financed/delivered; first 1 GW targeted online by late 2026.","createdAt":"2026-08-17T18:12:45.771Z"}],"financialClaims":[{"id":"6890b754-1250-4826-bd00-2b65e4202807","dataCenterId":"10010870-fc71-428e-b78e-66f972d37c33","kind":"capex","label":"Site buildout invested to date","valueUsd":"1400000000","capUsd":null,"conditions":null,"asOf":"2026-01-01T00:00:00.000Z","sourceUrl":"https://www.prnewswire.com/news-releases/fermi-america-makes-initial-draw-on-200-million-equipment-facility-from-keystone-national-group-and-cape-commercial-finance-to-accelerate-the-delivery-of-the-first-2-3gw-of-project-matadors-11gw-private-hypergrid-campus-302693111.html","sourceType":"press_release","evidenceTier":"claimed","createdAt":"2026-08-17T18:12:48.212Z"},{"id":"cc16c6f7-c254-4e5e-9b8c-ce4416a47ed2","dataCenterId":"10010870-fc71-428e-b78e-66f972d37c33","kind":"backstop","label":"Keystone/Cape equipment facility","valueUsd":"200000000","capUsd":"200000000","conditions":"Equipment financing facility from Keystone National Group and Cape Commercial Finance to accelerate first 2.3 GW","asOf":"2026-01-01T00:00:00.000Z","sourceUrl":"https://www.prnewswire.com/news-releases/fermi-america-makes-initial-draw-on-200-million-equipment-facility-from-keystone-national-group-and-cape-commercial-finance-to-accelerate-the-delivery-of-the-first-2-3gw-of-project-matadors-11gw-private-hypergrid-campus-302693111.html","sourceType":"press_release","evidenceTier":"reported","createdAt":"2026-08-17T18:12:49.022Z"},{"id":"eb6b506e-4c99-49ad-85d1-3a248eda92bc","dataCenterId":"10010870-fc71-428e-b78e-66f972d37c33","kind":"equity_stake","label":"Nasdaq IPO proceeds","valueUsd":"682500000","capUsd":null,"conditions":null,"asOf":"2025-10-01T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/fermi-makes-stock-market-debut-valued-at-almost-15bn/","sourceType":"sec_filing","evidenceTier":"reported","createdAt":"2026-08-17T18:12:47.457Z"}],"metricClaims":[{"id":"397ed97a-8bea-49b7-9108-75c0e8dcbff9","dataCenterId":"10010870-fc71-428e-b78e-66f972d37c33","metricType":"cooling_type","valueNumeric":null,"valueText":"Hybrid dry and wet cooling towers, claimed to lose more than 80 percent less to evaporation than conventional all-wet towers","unit":null,"grantingJurisdiction":null,"asOf":"2025-12-01T00:00:00.000Z","sourceUrl":"https://www.prnewswire.com/news-releases/fermi-america-and-mvm-egi-announce-water-saving-hybrid-cooling-agreement-for-worlds-largest-private-energy-grid-delivering-on-promises-made-to-protect-west-texas-water-resources-302628904.html","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":"vendor announcement; the percentage is the operator's claim, not a measurement","createdAt":"2026-08-28T20:25:17.908Z"},{"id":"a93aede6-72ac-4569-af0a-65349789bfaa","dataCenterId":"10010870-fc71-428e-b78e-66f972d37c33","metricType":"water_gpd","valueNumeric":2500000,"valueText":null,"unit":"gallons per day","grantingJurisdiction":null,"asOf":"2025-11-05T00:00:00.000Z","sourceUrl":"https://amarillotribune.org/2025/11/05/just-facts-fermi-america-and-project-matador/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"contracted from the City of Amarillo on a 20-year agreement at twice the in-city commercial rate; Fermi's own filing puts expected need at up to 5,500,000 gpd","createdAt":"2026-08-28T20:25:17.131Z"}],"powerProjects":[{"id":"fa265b66-7ab5-4109-a901-30728537e52b","dataCenterId":"10010870-fc71-428e-b78e-66f972d37c33","name":"Advanced nuclear reactors (four ~1 GW units)","type":"nuclear","capacityGw":4,"lifecycleState":"permitted","sourceUrl":"https://www.datacenterdynamics.com/en/news/fermi-makes-stock-market-debut-valued-at-almost-15bn/","evidenceTier":"claimed","note":"NRC reviewing applications for four 1-GW reactors per external reporting; unbuilt. Largest nuclear component of the campus.","createdAt":"2026-08-17T18:12:46.313Z"},{"id":"2e9abc34-b833-45ca-a936-7b83f26408cb","dataCenterId":"10010870-fc71-428e-b78e-66f972d37c33","name":"Combined-cycle natural gas plant","type":"gas","capacityGw":null,"lifecycleState":"under_construction","sourceUrl":"https://www.texastech.edu/stories/25-06-ttu-system-and-fermi-america-announce-partnership.php","evidenceTier":"claimed","note":"Described as the nation's biggest combined-cycle gas project; anchors near-term power (first 1 GW by late 2026).","createdAt":"2026-08-17T18:12:46.702Z"},{"id":"2ac8211c-4c83-4b9b-9cbf-b9152ce122d7","dataCenterId":"10010870-fc71-428e-b78e-66f972d37c33","name":"Solar + battery energy storage (BESS)","type":"solar_storage","capacityGw":null,"lifecycleState":"announced","sourceUrl":"https://www.texastech.edu/stories/25-06-ttu-system-and-fermi-america-announce-partnership.php","evidenceTier":"claimed","note":"Solar, wind and BESS integrated into behind-the-meter HyperGrid; capacities not itemized.","createdAt":"2026-08-17T18:12:47.079Z"}],"facilities":[],"incidents":[],"events":[{"id":"1e11b1d2-9500-4d2d-90ea-6cc33d88b753","dataCenterId":"10010870-fc71-428e-b78e-66f972d37c33","eventType":"claim_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"metric:cooling_type","occurredAt":"2026-08-28T20:25:18.286Z","createdAt":"2026-08-28T20:25:18.286Z"},{"id":"3511abe1-c673-4c6e-94fb-8b6ab679ca82","dataCenterId":"10010870-fc71-428e-b78e-66f972d37c33","eventType":"claim_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"metric:water_gpd=2500000","occurredAt":"2026-08-28T20:25:17.514Z","createdAt":"2026-08-28T20:25:17.514Z"},{"id":"f5323f9c-8a78-4c20-a0fc-957902be06c9","dataCenterId":"10010870-fc71-428e-b78e-66f972d37c33","eventType":"capacity_changed","series":"energized","oldValue":null,"newValue":"0","claimId":"57104b60-2ed1-4b39-9f2c-c8c37a5e791e","detail":null,"occurredAt":"2026-08-17T18:33:36.838Z","createdAt":"2026-08-17T18:33:36.838Z"},{"id":"5b9ba89a-727e-4d2d-873a-b08c15ec4d1f","dataCenterId":"10010870-fc71-428e-b78e-66f972d37c33","eventType":"claim_recorded","series":"energized","oldValue":null,"newValue":"0","claimId":"57104b60-2ed1-4b39-9f2c-c8c37a5e791e","detail":"reported · journalist_report","occurredAt":"2026-08-17T18:33:36.688Z","createdAt":"2026-08-17T18:33:36.688Z"},{"id":"41410682-0706-4795-b084-a09a5d84a43e","dataCenterId":"10010870-fc71-428e-b78e-66f972d37c33","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"grid_operator: SPP","occurredAt":"2026-08-17T18:12:52.506Z","createdAt":"2026-08-17T18:12:52.506Z"},{"id":"40f77d21-3a65-4c2b-879b-96a8e34c6780","dataCenterId":"10010870-fc71-428e-b78e-66f972d37c33","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"financier: Keystone National Group / Cape Commercial Finance","occurredAt":"2026-08-17T18:12:51.709Z","createdAt":"2026-08-17T18:12:51.709Z"},{"id":"92c660e6-2cfd-4a52-b953-4f96059296ae","dataCenterId":"10010870-fc71-428e-b78e-66f972d37c33","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: Texas Tech University System","occurredAt":"2026-08-17T18:12:50.948Z","createdAt":"2026-08-17T18:12:50.948Z"},{"id":"1d178253-5a0b-4db5-a11e-20470d73a231","dataCenterId":"10010870-fc71-428e-b78e-66f972d37c33","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: Fermi America (Fermi Inc)","occurredAt":"2026-08-17T18:12:50.194Z","createdAt":"2026-08-17T18:12:50.194Z"},{"id":"f80228f3-4710-49ea-8725-f6cd881d3e6e","dataCenterId":"10010870-fc71-428e-b78e-66f972d37c33","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"backstop: Keystone/Cape equipment facility","occurredAt":"2026-08-17T18:12:49.442Z","createdAt":"2026-08-17T18:12:49.442Z"},{"id":"a3806cbb-9b1f-466a-ab71-4fc1c20225f9","dataCenterId":"10010870-fc71-428e-b78e-66f972d37c33","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: Site buildout invested to date","occurredAt":"2026-08-17T18:12:48.601Z","createdAt":"2026-08-17T18:12:48.601Z"},{"id":"738e8543-ebfe-4398-8aba-696a3f3b03f2","dataCenterId":"10010870-fc71-428e-b78e-66f972d37c33","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"equity_stake: Nasdaq IPO proceeds","occurredAt":"2026-08-17T18:12:47.832Z","createdAt":"2026-08-17T18:12:47.832Z"},{"id":"88838edd-718b-404b-bd79-2bd833ec3e67","dataCenterId":"10010870-fc71-428e-b78e-66f972d37c33","eventType":"capacity_changed","series":"under_construction","oldValue":null,"newValue":"2.3","claimId":"9da59816-3a06-49e5-983f-2a9cf68bdac6","detail":null,"occurredAt":"2026-08-17T18:12:46.088Z","createdAt":"2026-08-17T18:12:46.088Z"},{"id":"2ee3b651-bd7d-4f4b-a869-294a60cb5cd7","dataCenterId":"10010870-fc71-428e-b78e-66f972d37c33","eventType":"claim_recorded","series":"under_construction","oldValue":null,"newValue":"2.3","claimId":"9da59816-3a06-49e5-983f-2a9cf68bdac6","detail":"claimed · press_release","occurredAt":"2026-08-17T18:12:45.924Z","createdAt":"2026-08-17T18:12:45.924Z"},{"id":"0abcbbb9-9a2d-48f1-9b17-c7485a8ba819","dataCenterId":"10010870-fc71-428e-b78e-66f972d37c33","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"11","claimId":"b2cdcc96-3daa-4b4a-87b8-637509ab2a79","detail":null,"occurredAt":"2026-08-17T18:12:45.202Z","createdAt":"2026-08-17T18:12:45.202Z"},{"id":"9e4be076-9d80-429a-92ca-50f6c47b4917","dataCenterId":"10010870-fc71-428e-b78e-66f972d37c33","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"11","claimId":"b2cdcc96-3daa-4b4a-87b8-637509ab2a79","detail":"claimed · press_release","occurredAt":"2026-08-17T18:12:45.052Z","createdAt":"2026-08-17T18:12:45.052Z"}],"capacity_picture":{"announced_gw":11,"contracted_gw":null,"under_construction_gw":2.3,"energized_gw":0,"announced_minus_energized_gw":11,"by_series":{"announced":{"valueGw":11,"asOf":"2025-06-26T00:00:00.000Z","evidenceTier":"claimed","sourceUrl":"https://www.texastech.edu/stories/25-06-ttu-system-and-fermi-america-announce-partnership.php"},"contracted":null,"under_construction":{"valueGw":2.3,"asOf":"2026-01-01T00:00:00.000Z","evidenceTier":"claimed","sourceUrl":"https://www.prnewswire.com/news-releases/fermi-america-makes-initial-draw-on-200-million-equipment-facility-from-keystone-national-group-and-cape-commercial-finance-to-accelerate-the-delivery-of-the-first-2-3gw-of-project-matadors-11gw-private-hypergrid-campus-302693111.html"},"energized":{"valueGw":0,"asOf":"2026-08-17T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://www.myhighplains.com/news/your-local-election-hq/amarillo-ai-data-center-project/fermi-america-pauses-construction-near-amarillo-while-waiting-for-tceq-permits/"}}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Fermi America HyperGrid (Project Matador)","url":"https://registry.deploy.report/datacenters/fermi-amarillo-texas","geo":{"@type":"GeoCoordinates","latitude":35.2837621,"longitude":-101.568974},"address":{"@type":"PostalAddress","addressLocality":"Amarillo"}}}