{"id":"496783cf-1c91-4566-98ce-67d2b5403137","slug":"fluidstack-cameron-county-texas","name":"Fluidstack Cameron County AI Campus","aliases":["Fluidstack Rio Grande Valley campus","Fluidstack Cameron County","Fluidstack Harlingen / Valley International Airport campus","Fluidstack Rio Hondo campus","Fluidstack FM 509 FM 106","Fluidstack RGV AI campus"],"locationId":"d6dddc4b-f1b3-4341-a9cf-bb206b69e94b","lat":26.1291189,"lng":-97.4134281,"locationPrecision":"county","landStatus":"private","lifecycleState":"under_construction","powerSourceMix":"mixed","interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":"2028-07-01T00:00:00.000Z","expectedEnergizationPrecision":"half","expectedEnergizationMilestone":"phase_1","dedicatedSubstation":null,"gridOperator":"ERCOT","waterSourceNotes":"Closed-loop recirculating cooling; East Rio Hondo Water Supply Corporation (nongovernmental) named as cooling-water supplier; company says top-ups after initial fill are only for maintenance and repairs ([Fluidstack](https://fluidstack.io/community/building-compute-in-cameron-county)).","servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Fluidstack AI data center campus in unincorporated Cameron County, Texas, near Valley International Airport (Harlingen), east of FM 509 and west of FM 106. Company community post (Sep 21, 2026) says construction has begun on a $4B first phase planned to support up to 1.5 GW. Cameron County (Sep 10, 2026) issued a worksite permit for closed-loop-technology site work; the county states it is not providing a tax abatement, and Fluidstack says it requested none. Company pledges to pay energy, infrastructure, and water costs; cooling water from East Rio Hondo Water Supply Corporation via a closed-loop system; property-line sound limit of 60 dB claimed. Distinct from fluidstack-texas-anthropic-campus (city/MW undisclosed Anthropic custom-build stub).","keyFacts":[{"label":"Operator / developer","value":"Fluidstack"},{"label":"Location","value":"Unincorporated Cameron County, TX, near Valley International Airport, Harlingen"},{"label":"Timeline","value":"Worksite permit issued Sep 10 2026 for clearing and grading; building permits still needed"},{"label":"First phase (company-claimed)","value":"$4B first phase of up to 1.5 GW"},{"label":"Cooling (company-claimed)","value":"Closed-loop water system supplied by East Rio Hondo Water Supply Corporation"},{"label":"Grid (company-claimed)","value":"ERCOT; pays its own energy and water costs; on-site generation plus purchased power"},{"label":"Tax treatment","value":"No county tax abatement requested"},{"label":"Jobs (company-claimed)","value":"2,500+ construction jobs and several hundred permanent roles"},{"label":"Noise (company-claimed)","value":"Property-line sound capped at 60 dB during operations"}],"reviewStatus":"reviewed","sources":[{"url":"https://fluidstack.io/community/building-compute-in-cameron-county","title":"Construction begins on our 1.5GW, $4B first phase in Cameron County","sourceName":"Fluidstack"},{"url":"https://www.cameroncountytx.gov/worksite-permit-issued-for-fluidstack-data-center-project/","title":"Worksite Permit Issued for Fluidstack Data Center Project","sourceName":"Cameron County"},{"url":"https://constructionreviewonline.com/fluidstack-starts-site-work-on-4-billion-cameron-county-ai-data-center-campus/","title":"Fluidstack Starts Site Work on $4 Billion Cameron County AI Data Center Campus","sourceName":"Construction Review Online","publishedAt":"2026-09-11"}],"reviewNote":null,"createdAt":"2026-09-27T05:17:30.446Z","updatedAt":"2026-11-18T03:31:33.666Z","location":{"id":"d6dddc4b-f1b3-4341-a9cf-bb206b69e94b","name":"Cameron County","slug":"cameron-county-texas","kind":"county","parentLocationId":"45f67762-10f4-4255-be84-45c73efe25f9","region":"Texas","lat":26.1291189,"lng":-97.4134281,"reviewStatus":"reviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-19T04:48:22.909Z","updatedAt":"2026-08-21T18:00:49.803Z"},"parties":[{"id":"791baa9a-f320-410d-8543-0acd4a95ce71","dataCenterId":"496783cf-1c91-4566-98ce-67d2b5403137","companyId":"6ab34159-5546-4815-8247-d4d5bd2b0e8a","externalName":null,"role":"developer","structureNotes":"Building and operating the Cameron County AI campus.","createdAt":"2026-09-27T05:17:32.038Z","company":{"id":"6ab34159-5546-4815-8247-d4d5bd2b0e8a","name":"Fluidstack","slug":"fluidstack"}},{"id":"27eb82e1-aecc-425f-befa-276c325a2c00","dataCenterId":"496783cf-1c91-4566-98ce-67d2b5403137","companyId":null,"externalName":"East Rio Hondo Water Supply Corporation","role":"utility","structureNotes":"Named cooling-water supplier for the closed-loop system (company).","createdAt":"2026-09-27T12:41:08.533Z","company":null}],"capacityClaims":[{"id":"d1e214e4-74e6-4d42-977a-932a23247def","dataCenterId":"496783cf-1c91-4566-98ce-67d2b5403137","series":"announced","valueGw":1.5,"asOf":"2026-09-21T00:00:00.000Z","sourceUrl":"https://fluidstack.io/community/building-compute-in-cameron-county","sourceType":"company","evidenceTier":"claimed","supersedesId":null,"note":"Company: $4B first phase planned to support up to 1.5 GW of capacity.","createdAt":"2026-09-27T05:17:31.502Z"}],"financialClaims":[{"id":"a26ee542-b3d5-4cb4-94ef-281a97ca08ce","dataCenterId":"496783cf-1c91-4566-98ce-67d2b5403137","kind":"capex","label":"First-phase campus investment (company)","valueUsd":"4000000000","capUsd":null,"conditions":"Company: $4 billion first phase planned to support up to 1.5 GW.","asOf":"2026-09-21T00:00:00.000Z","sourceUrl":"https://fluidstack.io/community/building-compute-in-cameron-county","sourceType":"company","evidenceTier":"claimed","createdAt":"2026-09-27T12:41:05.495Z"}],"metricClaims":[{"id":"78eda005-10c2-4bed-982b-6e2dacbabad1","dataCenterId":"496783cf-1c91-4566-98ce-67d2b5403137","metricType":"capex_usd","valueNumeric":4000000000,"valueText":null,"unit":null,"grantingJurisdiction":null,"asOf":"2026-09-21T00:00:00.000Z","sourceUrl":"https://fluidstack.io/community/building-compute-in-cameron-county","sourceType":"company","evidenceTier":"claimed","supersedesId":null,"note":null,"createdAt":"2026-09-27T12:41:06.245Z"},{"id":"66edc005-c1b7-4ad8-9983-3eda19b64c34","dataCenterId":"496783cf-1c91-4566-98ce-67d2b5403137","metricType":"cooling_type","valueNumeric":null,"valueText":"closed-loop recirculating (East Rio Hondo Water Supply Corporation)","unit":null,"grantingJurisdiction":null,"asOf":"2026-09-21T00:00:00.000Z","sourceUrl":"https://fluidstack.io/community/building-compute-in-cameron-county","sourceType":"company","evidenceTier":"claimed","supersedesId":null,"note":null,"createdAt":"2026-09-27T12:41:07.789Z"},{"id":"3b1d9cfb-c513-4e24-8b8e-132b4fd47d41","dataCenterId":"496783cf-1c91-4566-98ce-67d2b5403137","metricType":"jobs_construction","valueNumeric":2500,"valueText":null,"unit":null,"grantingJurisdiction":null,"asOf":"2026-09-21T00:00:00.000Z","sourceUrl":"https://fluidstack.io/community/building-compute-in-cameron-county","sourceType":"company","evidenceTier":"claimed","supersedesId":null,"note":null,"createdAt":"2026-09-27T12:41:07.020Z"}],"powerProjects":[],"permits":[],"facilities":[],"incidents":[],"events":[{"id":"f68a47f0-9551-4708-a13c-36642db8ce37","dataCenterId":"496783cf-1c91-4566-98ce-67d2b5403137","eventType":"energization_date_changed","series":null,"oldValue":null,"newValue":"2028-07-01|half","claimId":null,"detail":"intake proposal 2db6148f-ed76-4703-83c7-48c03f9e2e4b","occurredAt":"2026-11-18T03:31:34.348Z","createdAt":"2026-11-18T03:31:34.348Z"},{"id":"6a1cf2e8-4709-48fd-9af5-677ff91d41d5","dataCenterId":"496783cf-1c91-4566-98ce-67d2b5403137","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: East Rio Hondo Water Supply Corporation","occurredAt":"2026-09-27T12:41:08.907Z","createdAt":"2026-09-27T12:41:08.907Z"},{"id":"da03a674-65ae-4c0b-b813-8cfd63de3b6f","dataCenterId":"496783cf-1c91-4566-98ce-67d2b5403137","eventType":"claim_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"metric:cooling_type","occurredAt":"2026-09-27T12:41:08.164Z","createdAt":"2026-09-27T12:41:08.164Z"},{"id":"25d406d1-a108-4f3f-aba4-b75a3b405309","dataCenterId":"496783cf-1c91-4566-98ce-67d2b5403137","eventType":"claim_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"metric:jobs_construction=2500","occurredAt":"2026-09-27T12:41:07.400Z","createdAt":"2026-09-27T12:41:07.400Z"},{"id":"2873e759-be22-4fd7-8b67-78066051ec65","dataCenterId":"496783cf-1c91-4566-98ce-67d2b5403137","eventType":"claim_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"metric:capex_usd=4000000000","occurredAt":"2026-09-27T12:41:06.618Z","createdAt":"2026-09-27T12:41:06.618Z"},{"id":"ecf0c1ad-4bbc-465c-81e2-3bc99cd3732c","dataCenterId":"496783cf-1c91-4566-98ce-67d2b5403137","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: First-phase campus investment (company)","occurredAt":"2026-09-27T12:41:05.873Z","createdAt":"2026-09-27T12:41:05.873Z"},{"id":"6c43545e-b0c1-4108-8920-2cd754babda3","dataCenterId":"496783cf-1c91-4566-98ce-67d2b5403137","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: 6ab34159-5546-4815-8247-d4d5bd2b0e8a","occurredAt":"2026-09-27T05:17:32.417Z","createdAt":"2026-09-27T05:17:32.417Z"},{"id":"b581bcb4-be79-4d2e-9841-adb58ce22e78","dataCenterId":"496783cf-1c91-4566-98ce-67d2b5403137","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"1.5","claimId":"d1e214e4-74e6-4d42-977a-932a23247def","detail":null,"occurredAt":"2026-09-27T05:17:31.809Z","createdAt":"2026-09-27T05:17:31.809Z"},{"id":"f1d0fc02-b55b-4e61-afa1-a5052737a8e7","dataCenterId":"496783cf-1c91-4566-98ce-67d2b5403137","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"1.5","claimId":"d1e214e4-74e6-4d42-977a-932a23247def","detail":"claimed · company","occurredAt":"2026-09-27T05:17:31.653Z","createdAt":"2026-09-27T05:17:31.653Z"}],"capacity_picture":{"announced_gw":1.5,"contracted_gw":null,"under_construction_gw":null,"energized_gw":null,"announced_minus_energized_gw":1.5,"by_series":{"announced":{"valueGw":1.5,"asOf":"2026-09-21T00:00:00.000Z","evidenceTier":"claimed","sourceUrl":"https://fluidstack.io/community/building-compute-in-cameron-county"},"contracted":null,"under_construction":null,"energized":null}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Fluidstack Cameron County AI Campus","url":"https://registry.deploy.report/datacenters/fluidstack-cameron-county-texas","geo":{"@type":"GeoCoordinates","latitude":26.1291189,"longitude":-97.4134281},"address":{"@type":"PostalAddress","addressLocality":"Cameron County"}}}