{"id":"025b7841-ad1f-47b2-ac65-6ffaa31b1c1a","slug":"freedom-akashi-data-center-astana","name":"Akashi Data Center (Astana)","aliases":["Freedom Telecom Akashi DC","Astana Tier IV data center"],"locationId":"23cd89c2-219f-49bc-99b0-f0d8186cb9c8","lat":51.1694,"lng":71.4491,"locationPrecision":"city","landStatus":null,"lifecycleState":"under_construction","powerSourceMix":null,"interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":null,"waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Freedom Holding's Tier IV AI data-center campus in Astana (operated via Freedom Telecom), a four-building, 4,224-rack, 11-hectare site built with China Mobile International. Announced total up to 100 MW; the operator's site reports 48.34 MW live. First-phase soft launch targeted for 2027, with a majority of racks reserved pre-launch. Related to Freedom's ~$2B NVIDIA-powered Sovereign AI Hub program.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://akashi.cloud/about/","title":"About — Akashi Data Center","sourceName":"Akashi Data Center"},{"url":"https://astanatimes.com/2025/06/kazakhstan-to-build-central-asias-first-tier-iv-data-center/","title":"Kazakhstan to Build Central Asia's First Tier IV Data Center","sourceName":"The Astana Times"},{"url":"https://ir.freedomholdingcorp.com/press-releases/detail/86/freedom-holding-corp-to-build-2b-sovereign-ai-hub-in","title":"Freedom Holding to Build $2B Sovereign AI Hub in Kazakhstan Powered by NVIDIA","sourceName":"Freedom Holding Corp"}],"reviewNote":null,"createdAt":"2026-08-31T00:39:48.572Z","updatedAt":"2026-08-31T01:13:30.444Z","location":{"id":"23cd89c2-219f-49bc-99b0-f0d8186cb9c8","name":"Astana, Kazakhstan","slug":"astana-kazakhstan","kind":"city","parentLocationId":null,"region":"Kazakhstan","lat":51.1605,"lng":71.4704,"reviewStatus":"reviewed","aliases":["Astana","Nur-Sultan","Астана","Astana, Kazakhstan"],"collisionRisk":"high","reviewNote":"Capital city of Kazakhstan. Site of [AutoFlight](/companies/autoflight)'s first air taxi demonstration flight on July 24, 2026, during the Games of the Future event. The ton-class eVTOL aircraft demonstration was conducted in partnership with Alatau Advance Air Group. Sources: https://evtolinsights.com/autoflight-completes-first-air-taxi-demonstration-in-astana-games-of-the-future/ ; https://m.youtube.com/watch?v=jxQ2uT9v3h0","createdAt":"2026-08-27T15:45:19.034Z","updatedAt":"2026-08-28T02:01:23.224Z"},"parties":[{"id":"828a0dda-3130-445f-98d6-f624059341f2","dataCenterId":"025b7841-ad1f-47b2-ac65-6ffaa31b1c1a","companyId":"d52c7d5a-96b5-4070-8090-98f3caf18228","externalName":null,"role":"operator","structureNotes":"Freedom Holding via Freedom Telecom.","createdAt":"2026-08-31T00:39:51.070Z","company":{"id":"d52c7d5a-96b5-4070-8090-98f3caf18228","name":"Freedom Holding","slug":"freedom-holding"}},{"id":"403cf694-965a-4c70-af4a-2038ca578860","dataCenterId":"025b7841-ad1f-47b2-ac65-6ffaa31b1c1a","companyId":null,"externalName":"China Mobile International","role":"construction","structureNotes":"Construction partner.","createdAt":"2026-08-31T00:39:51.837Z","company":null},{"id":"3f7183a3-d6a9-4255-b4b7-dc097d2c9da9","dataCenterId":"025b7841-ad1f-47b2-ac65-6ffaa31b1c1a","companyId":null,"externalName":"NVIDIA","role":"chip_supplier","structureNotes":"Program-level; sovereign AI hub.","createdAt":"2026-08-31T00:39:52.604Z","company":null}],"capacityClaims":[{"id":"def9ae1f-6936-4849-b6c6-dbda9e20d413","dataCenterId":"025b7841-ad1f-47b2-ac65-6ffaa31b1c1a","series":"announced","valueGw":0.1,"asOf":"2025-06-18T00:00:00.000Z","sourceUrl":"https://astanatimes.com/2025/06/kazakhstan-to-build-central-asias-first-tier-iv-data-center/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Up to 100 MW across four data-center buildings.","createdAt":"2026-08-31T00:39:49.627Z"},{"id":"43d9335b-336a-4959-afcb-e1ca6997b04a","dataCenterId":"025b7841-ad1f-47b2-ac65-6ffaa31b1c1a","series":"energized","valueGw":0.04834,"asOf":"2026-08-30T00:00:00.000Z","sourceUrl":"https://akashi.cloud/about/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"48.34 MW live power per the operator's site.","createdAt":"2026-08-31T00:39:50.531Z"}],"financialClaims":[],"metricClaims":[],"powerProjects":[],"facilities":[],"incidents":[],"events":[{"id":"13735203-f488-4285-9c55-a2c647bb9773","dataCenterId":"025b7841-ad1f-47b2-ac65-6ffaa31b1c1a","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"chip_supplier: NVIDIA","occurredAt":"2026-08-31T00:39:52.994Z","createdAt":"2026-08-31T00:39:52.994Z"},{"id":"ef0b29df-3463-427f-9494-4343b51a6c8c","dataCenterId":"025b7841-ad1f-47b2-ac65-6ffaa31b1c1a","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"construction: China Mobile International","occurredAt":"2026-08-31T00:39:52.222Z","createdAt":"2026-08-31T00:39:52.222Z"},{"id":"ad92b92c-7dd1-46a1-ab9c-b04923a938e7","dataCenterId":"025b7841-ad1f-47b2-ac65-6ffaa31b1c1a","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"operator: d52c7d5a-96b5-4070-8090-98f3caf18228","occurredAt":"2026-08-31T00:39:51.450Z","createdAt":"2026-08-31T00:39:51.450Z"},{"id":"3187d740-d1dd-446a-a0f3-39cd67528f36","dataCenterId":"025b7841-ad1f-47b2-ac65-6ffaa31b1c1a","eventType":"capacity_changed","series":"energized","oldValue":null,"newValue":"0.04834","claimId":"43d9335b-336a-4959-afcb-e1ca6997b04a","detail":null,"occurredAt":"2026-08-31T00:39:50.834Z","createdAt":"2026-08-31T00:39:50.834Z"},{"id":"3cdf0ae4-107b-4a09-a0c1-f2dd215bae8e","dataCenterId":"025b7841-ad1f-47b2-ac65-6ffaa31b1c1a","eventType":"claim_recorded","series":"energized","oldValue":null,"newValue":"0.04834","claimId":"43d9335b-336a-4959-afcb-e1ca6997b04a","detail":"reported · journalist_report","occurredAt":"2026-08-31T00:39:50.680Z","createdAt":"2026-08-31T00:39:50.680Z"},{"id":"8a730c2a-8558-4629-8b4f-bcc7a07469b5","dataCenterId":"025b7841-ad1f-47b2-ac65-6ffaa31b1c1a","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"0.1","claimId":"def9ae1f-6936-4849-b6c6-dbda9e20d413","detail":null,"occurredAt":"2026-08-31T00:39:49.925Z","createdAt":"2026-08-31T00:39:49.925Z"},{"id":"2ca21d95-8587-495d-a754-9da3d2fec02b","dataCenterId":"025b7841-ad1f-47b2-ac65-6ffaa31b1c1a","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"0.1","claimId":"def9ae1f-6936-4849-b6c6-dbda9e20d413","detail":"reported · journalist_report","occurredAt":"2026-08-31T00:39:49.773Z","createdAt":"2026-08-31T00:39:49.773Z"}],"capacity_picture":{"announced_gw":0.1,"contracted_gw":null,"under_construction_gw":null,"energized_gw":0.04834,"announced_minus_energized_gw":0.051660000000000005,"by_series":{"announced":{"valueGw":0.1,"asOf":"2025-06-18T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://astanatimes.com/2025/06/kazakhstan-to-build-central-asias-first-tier-iv-data-center/"},"contracted":null,"under_construction":null,"energized":{"valueGw":0.04834,"asOf":"2026-08-30T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://akashi.cloud/about/"}}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Akashi Data Center (Astana)","url":"https://registry.deploy.report/datacenters/freedom-akashi-data-center-astana","geo":{"@type":"GeoCoordinates","latitude":51.1694,"longitude":71.4491},"address":{"@type":"PostalAddress","addressLocality":"Astana, Kazakhstan"}}}