{"id":"7eb8871d-2d85-4e38-858e-c85d6ba993b9","slug":"giga-energy-project-clay-hunt-county","name":"Giga Energy Project Clay (Hunt County, Texas)","aliases":["Project Clay"],"locationId":"45f67762-10f4-4255-be84-45c73efe25f9","lat":null,"lng":null,"locationPrecision":"county","landStatus":null,"lifecycleState":"under_construction","powerSourceMix":null,"interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":null,"expectedEnergizationPrecision":null,"expectedEnergizationMilestone":null,"dedicatedSubstation":null,"gridOperator":null,"waterSourceNotes":"Fully closed-loop cooling that operates independently of local municipal or groundwater supplies; local water use limited to sinks and employee bathrooms.","servingUtility":null,"acreage":30,"totalBuildingSqft":null,"streetAddress":null,"notes":"Giga Energy broke ground in July on Project Clay, a 60MW GigaBase AI data center in Hunt County, Texas, which it will develop, own and operate for an undisclosed U.S.-based AI cloud provider under a 10-year lease worth about $1 billion. The roughly 30-acre campus is expected to be ready for service in spring 2027 and uses a fully closed-loop system to cool its IT equipment, independent of municipal or groundwater supplies.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.gigaenergy.com/news/giga-news-hunt-county-deal","title":"Giga Energy Inks 10-Year, $1B Lease on Project Clay, a 60MW AI Data Center in Hunt County, TX","sourceName":"Giga Energy","publishedAt":"2026-11-17"},{"url":"https://www.channelnewsasia.com/business/giga-energy-signs-1-billion-lease-texas-ai-data-center-cloud-provider-6559516","title":"Giga Energy signs $1 billion lease for Texas AI data center with cloud provider","sourceName":"CNA (Reuters)","publishedAt":"2026-11-17"}],"reviewNote":null,"createdAt":"2026-11-20T00:33:23.408Z","updatedAt":"2026-11-20T00:33:23.933Z","location":{"id":"45f67762-10f4-4255-be84-45c73efe25f9","name":"Texas","slug":"texas","kind":"state","parentLocationId":"aa8b9c05-c836-4021-801f-59801970401e","region":"Southwest","lat":31.9686,"lng":-99.9018,"reviewStatus":"reviewed","aliases":["TX","texas-usa","Texas, USA"],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-05-31T04:22:22.644Z","updatedAt":"2026-08-08T16:40:41.381Z"},"parties":[{"id":"02a7daa0-642f-410b-8802-17980931f2b8","dataCenterId":"7eb8871d-2d85-4e38-858e-c85d6ba993b9","companyId":"474527e1-0dc4-4379-a407-db259185236e","externalName":null,"role":"developer","structureNotes":null,"createdAt":"2026-11-20T00:33:26.098Z","company":{"id":"474527e1-0dc4-4379-a407-db259185236e","name":"Giga Energy","slug":"giga-energy"}},{"id":"bdea4692-2cbf-441d-8235-50e7de07f4a6","dataCenterId":"7eb8871d-2d85-4e38-858e-c85d6ba993b9","companyId":"474527e1-0dc4-4379-a407-db259185236e","externalName":null,"role":"operator","structureNotes":null,"createdAt":"2026-11-20T00:33:27.406Z","company":{"id":"474527e1-0dc4-4379-a407-db259185236e","name":"Giga Energy","slug":"giga-energy"}},{"id":"91ddf92a-b898-4271-9783-047ac6cc81ea","dataCenterId":"7eb8871d-2d85-4e38-858e-c85d6ba993b9","companyId":null,"externalName":"Undisclosed U.S.-based AI cloud provider","role":"tenant","structureNotes":null,"createdAt":"2026-11-20T00:33:28.721Z","company":null}],"capacityClaims":[{"id":"561f8924-80b1-4860-a6c2-3c7736d96771","dataCenterId":"7eb8871d-2d85-4e38-858e-c85d6ba993b9","series":"contracted","valueGw":0.06,"asOf":"2026-11-17T00:00:00.000Z","sourceUrl":"https://www.gigaenergy.com/news/giga-news-hunt-county-deal","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":"intake proposal 61ba8699-860a-4cb4-b232-84ced7989831","createdAt":"2026-11-20T00:33:30.366Z"}],"financialClaims":[{"id":"405cef75-e2d0-41fa-9759-cb661fdad608","dataCenterId":"7eb8871d-2d85-4e38-858e-c85d6ba993b9","kind":"lease_term","label":"10-year lease with an undisclosed AI cloud provider","valueUsd":"1000000000","capUsd":null,"conditions":null,"asOf":"2026-11-17T00:00:00.000Z","sourceUrl":"https://www.gigaenergy.com/news/giga-news-hunt-county-deal","sourceType":"press_release","evidenceTier":"claimed","createdAt":"2026-11-20T00:33:31.867Z"}],"metricClaims":[],"powerProjects":[],"permits":[],"facilities":[],"incidents":[],"events":[{"id":"f55ee735-aea0-404a-8193-a5948471374a","dataCenterId":"7eb8871d-2d85-4e38-858e-c85d6ba993b9","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"lease_term: 10-year lease with an undisclosed AI cloud provider","occurredAt":"2026-11-20T00:33:32.322Z","createdAt":"2026-11-20T00:33:32.322Z"},{"id":"0762e966-2b31-4c22-bbf8-a3c4ebbf4824","dataCenterId":"7eb8871d-2d85-4e38-858e-c85d6ba993b9","eventType":"capacity_changed","series":"contracted","oldValue":null,"newValue":"0.06","claimId":"561f8924-80b1-4860-a6c2-3c7736d96771","detail":null,"occurredAt":"2026-11-20T00:33:30.747Z","createdAt":"2026-11-20T00:33:30.747Z"},{"id":"6100ad27-e15a-4916-8836-e400ae81e9c3","dataCenterId":"7eb8871d-2d85-4e38-858e-c85d6ba993b9","eventType":"claim_recorded","series":"contracted","oldValue":null,"newValue":"0.06","claimId":"561f8924-80b1-4860-a6c2-3c7736d96771","detail":"claimed · press_release","occurredAt":"2026-11-20T00:33:30.551Z","createdAt":"2026-11-20T00:33:30.551Z"},{"id":"9e3050d9-82eb-49bd-b4de-967db222d0d8","dataCenterId":"7eb8871d-2d85-4e38-858e-c85d6ba993b9","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"tenant: Undisclosed U.S.-based AI cloud provider","occurredAt":"2026-11-20T00:33:29.174Z","createdAt":"2026-11-20T00:33:29.174Z"},{"id":"1fc31a4c-6b70-409d-a193-0bec8e4a1e4f","dataCenterId":"7eb8871d-2d85-4e38-858e-c85d6ba993b9","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"operator: 474527e1-0dc4-4379-a407-db259185236e","occurredAt":"2026-11-20T00:33:27.816Z","createdAt":"2026-11-20T00:33:27.816Z"},{"id":"3b0d8cd9-162c-4164-b9be-33a2a35dae66","dataCenterId":"7eb8871d-2d85-4e38-858e-c85d6ba993b9","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: 474527e1-0dc4-4379-a407-db259185236e","occurredAt":"2026-11-20T00:33:26.553Z","createdAt":"2026-11-20T00:33:26.553Z"}],"capacity_picture":{"announced_gw":null,"contracted_gw":0.06,"under_construction_gw":null,"energized_gw":null,"announced_minus_energized_gw":null,"by_series":{"announced":null,"contracted":{"valueGw":0.06,"asOf":"2026-11-17T00:00:00.000Z","evidenceTier":"claimed","sourceUrl":"https://www.gigaenergy.com/news/giga-news-hunt-county-deal"},"under_construction":null,"energized":null}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Giga Energy Project Clay (Hunt County, Texas)","url":"https://registry.deploy.report/datacenters/giga-energy-project-clay-hunt-county","address":{"@type":"PostalAddress","addressLocality":"Texas"}}}