{"id":"ff470a39-3010-4b20-99dd-e0585700574a","slug":"gmi-cloud-taiwan-ai-factory-taoyuan","name":"GMI Cloud Taiwan AI Factory (Taoyuan)","aliases":["GMI Taiwan AI Factory","GMI Cloud Taiwan AI Factory","Taiwan AI Factory Taoyuan","GMI GB300 NVL72 Taiwan","GMI NVIDIA Cloud Partner Taiwan"],"locationId":"90fc5243-0788-4070-9562-8d6544cdbf77","lat":24.99,"lng":121.3,"locationPrecision":"city","landStatus":null,"lifecycleState":"partially_energized","powerSourceMix":null,"interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":null,"expectedEnergizationPrecision":null,"expectedEnergizationMilestone":null,"dedicatedSubstation":null,"gridOperator":"Taiwan Power Company (Taipower)","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"GMI Cloud's ~$500M Taiwan AI Factory in Taoyuan, northern Taiwan: ~7,000 NVIDIA GB300 (Blackwell Ultra) GPUs across 96 GB300 NVL72 racks, ~2M tokens/sec, 16 MW power draw, targeted operational by March 2026. Anchors named include Wistron, Chunghwa Telecom, Trend Micro and VAST Data. Digitimes notes the 16 MW is expected to exceed Taipower's current 5 MW allocation limit.","keyFacts":[{"label":"Scale (company-claimed, Nov 2025)","value":"$500M AI Factory with 7,000 NVIDIA Blackwell Ultra GPUs in 96 GB300 NVL72 racks; about 16 MW."},{"label":"Online target (company-claimed)","value":"March 2026; billed as Taiwan's first sovereign AI Factory."},{"label":"Networking (company-claimed)","value":"NVLink, Quantum InfiniBand, Spectrum-X Ethernet and BlueField DPUs."},{"label":"Initial customers (reported, Nov 2025)","value":"NVIDIA, Trend Micro, Wistron, Chunghwa System Integration, VAST Data and TECO."},{"label":"Contract value (reported, Nov 2025)","value":"CEO Alex Yeh expects about $1B total contract value once fully operating."},{"label":"Operator footprint (reported)","value":"NVIDIA Cloud Partner with data centers in the US, Taiwan, Singapore, Thailand and Japan."},{"label":"Operating status (company-claimed, Mar 2026)","value":"TPE11 operational: 16 MW, 7,000+ GB300 GPUs; Phase 1 in Q2 2026, full buildout by Q4 2026."}],"reviewStatus":"reviewed","sources":[{"url":"https://www.prnewswire.com/news-releases/gmi-cloud-to-launch-next-gen-ai-factory-in-taiwan-with-nvidia-to-power-the-future-of-ai-infrastructure-in-asia-302616532.html","title":"GMI Cloud to Launch Next-Gen AI Factory in Taiwan with NVIDIA","sourceName":"PR Newswire"},{"url":"https://www.digitimes.com/news/a20251120PD207/cloud-taiwan-data-center-electricity-startup.html","title":"GMI Cloud plans AI factory in northern Taiwan amid grid challenges","sourceName":"Digitimes"},{"url":"https://www.gmicloud.ai/en/blog/gmi-cloud-brings-taiwans-first-ai-factory","date":"2025-11-18","title":"Taiwan Launches Its First AI Factory With GMI Cloud","publisher":"GMI Cloud"},{"url":"https://www.reuters.com/world/asia-pacific/gmi-cloud-build-500-million-ai-data-centre-in-taiwan-with-nvidia-chips-2025-11-17/","date":"2025-11-17","title":"GMI Cloud to build $500 million AI data centre in Taiwan with Nvidia chips","publisher":"Reuters"},{"url":"https://www.gmicloud.ai/en/blog/san-jose-gtc-2026-wrap-up","title":"San Jose GTC 2026 Wrap-Up","sourceName":"GMI Cloud","publishedAt":"2026-03-24"}],"reviewNote":null,"createdAt":"2026-08-31T01:26:25.334Z","updatedAt":"2026-10-12T23:52:41.442Z","location":{"id":"90fc5243-0788-4070-9562-8d6544cdbf77","name":"Taoyuan, Taiwan","slug":"taoyuan-taiwan","kind":"city","parentLocationId":"5a4df391-fad3-4bb9-8223-e3f444f3d2ac","region":null,"lat":24.99,"lng":121.3,"reviewStatus":"unreviewed","aliases":["Taoyuan"],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-31T01:26:24.545Z","updatedAt":"2026-11-02T18:32:15.604Z"},"parties":[{"id":"55b2a68a-6b89-4a05-8fc9-71626944aebb","dataCenterId":"ff470a39-3010-4b20-99dd-e0585700574a","companyId":"a00c2c91-f6bf-4aaf-bdfe-f2be8ab2e7aa","externalName":null,"role":"operator","structureNotes":"GMI Cloud (CEO Alex Yeh).","createdAt":"2026-08-31T01:26:26.991Z","company":{"id":"a00c2c91-f6bf-4aaf-bdfe-f2be8ab2e7aa","name":"GMI Cloud","slug":"gmi-cloud"}},{"id":"c933c498-28c6-4f3a-9238-f15b0600c9ff","dataCenterId":"ff470a39-3010-4b20-99dd-e0585700574a","companyId":null,"externalName":"Taiwan Power Company (Taipower)","role":"grid_operator","structureNotes":"16 MW expected to exceed the 5 MW allocation limit.","createdAt":"2026-08-31T01:26:27.942Z","company":null},{"id":"5104ab40-d069-48f6-af4e-25278a8dce1b","dataCenterId":"ff470a39-3010-4b20-99dd-e0585700574a","companyId":null,"externalName":"NVIDIA","role":"chip_supplier","structureNotes":"~7,000 GB300 (Blackwell Ultra).","createdAt":"2026-08-31T01:26:28.726Z","company":null}],"capacityClaims":[{"id":"346d18e8-2d8f-480e-a4ad-825fa2a59603","dataCenterId":"ff470a39-3010-4b20-99dd-e0585700574a","series":"announced","valueGw":0.016,"asOf":"2025-11-17T00:00:00.000Z","sourceUrl":"https://www.prnewswire.com/news-releases/gmi-cloud-to-launch-next-gen-ai-factory-in-taiwan-with-nvidia-to-power-the-future-of-ai-infrastructure-in-asia-302616532.html","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"16 MW power draw; ~7,000 GB300 across 96 NVL72 racks.","createdAt":"2026-08-31T01:26:26.434Z"}],"financialClaims":[],"metricClaims":[],"powerProjects":[],"permits":[],"facilities":[],"incidents":[],"events":[{"id":"61c7b2b2-8000-48fd-80c2-452d198d0d31","dataCenterId":"ff470a39-3010-4b20-99dd-e0585700574a","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"chip_supplier: NVIDIA","occurredAt":"2026-08-31T01:26:29.124Z","createdAt":"2026-08-31T01:26:29.124Z"},{"id":"e35b84e8-b703-439b-9b7d-909d391c116d","dataCenterId":"ff470a39-3010-4b20-99dd-e0585700574a","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"grid_operator: Taiwan Power Company (Taipower)","occurredAt":"2026-08-31T01:26:28.328Z","createdAt":"2026-08-31T01:26:28.328Z"},{"id":"3bec88d0-03d3-4dda-92dd-95002ae46f99","dataCenterId":"ff470a39-3010-4b20-99dd-e0585700574a","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"operator: a00c2c91-f6bf-4aaf-bdfe-f2be8ab2e7aa","occurredAt":"2026-08-31T01:26:27.551Z","createdAt":"2026-08-31T01:26:27.551Z"},{"id":"1a2810a5-7c4e-4c6d-8846-a3513ab427ad","dataCenterId":"ff470a39-3010-4b20-99dd-e0585700574a","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"0.016","claimId":"346d18e8-2d8f-480e-a4ad-825fa2a59603","detail":null,"occurredAt":"2026-08-31T01:26:26.750Z","createdAt":"2026-08-31T01:26:26.750Z"},{"id":"b2a15c13-c045-4f00-82c5-46b73994bbe4","dataCenterId":"ff470a39-3010-4b20-99dd-e0585700574a","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"0.016","claimId":"346d18e8-2d8f-480e-a4ad-825fa2a59603","detail":"reported · journalist_report","occurredAt":"2026-08-31T01:26:26.594Z","createdAt":"2026-08-31T01:26:26.594Z"}],"capacity_picture":{"announced_gw":0.016,"contracted_gw":null,"under_construction_gw":null,"energized_gw":null,"announced_minus_energized_gw":0.016,"by_series":{"announced":{"valueGw":0.016,"asOf":"2025-11-17T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://www.prnewswire.com/news-releases/gmi-cloud-to-launch-next-gen-ai-factory-in-taiwan-with-nvidia-to-power-the-future-of-ai-infrastructure-in-asia-302616532.html"},"contracted":null,"under_construction":null,"energized":null}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"GMI Cloud Taiwan AI Factory (Taoyuan)","url":"https://registry.deploy.report/datacenters/gmi-cloud-taiwan-ai-factory-taoyuan","geo":{"@type":"GeoCoordinates","latitude":24.99,"longitude":121.3},"address":{"@type":"PostalAddress","addressLocality":"Taoyuan, Taiwan"}}}