{"id":"242adcda-ceef-4893-a70a-153273e218ab","slug":"google-alamo-mission-midlothian-ellis-texas","name":"Google Midlothian Campus (Alamo Mission)","aliases":["Alamo Mission LLC","Sharka","Google Red Oak/Midlothian"],"locationId":"c741667c-fad5-4047-b86c-d728be7b5e07","lat":32.4464066,"lng":-97.0622467,"locationPrecision":"exact","landStatus":"private","lifecycleState":"partially_energized","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"ERCOT","waterSourceNotes":null,"servingUtility":null,"acreage":540,"totalBuildingSqft":null,"streetAddress":null,"notes":"Google's Ellis County hyperscale/AI campus (developed via Alamo Mission LLC, project 'Sharka'; ~266 MW at 3441 Railport Parkway, Midlothian) holds a TCEQ Federal Operating Permit and is expanding as part of Google's stated $40B Texas cloud/AI investment through 2027. Several buildings are operational; total ultimate capacity is not disclosed.","keyFacts":[{"label":"Fifth building / Sharka LLC / $880M (reported DCD via TDLR)","value":"DCD reports (Mar 3 2026) that Google, through shell company Sharka LLC, filed with the Texas Department of Licensing and Regulation for Sharka Data Center Building 5 at 3441 Railport Parkway in Ellis County (same address as the Midlothian campus): one-story, 288,000 sq ft, estimated $880 million including core/shell, interior finish, and site work, with construction begun late January 2026 and completion targeted February 24, 2027 ([DCD, Mar 3 2026](https://www.datacenterdynamics.com/en/news/google-files-for-fifth-data-center-at-midlothian-campus-in-texas/))","sourceUrl":"https://www.datacenterdynamics.com/en/news/google-files-for-fifth-data-center-at-midlothian-campus-in-texas/"},{"label":"Campus history / acreage (reported DCD)","value":"DCD states Google first built in Midlothian in 2019 via Alamo Mission LLC under project name Sharka, originally buying 375 acres and later another 165-acre tract, added a fourth building in 2024 (about $100 million, 170,600 sq ft), and launched a Texas cloud region in Dallas in June 2022. Treat acreage and prior building costs as journalist summaries of filings/press, not Google IR totals ([DCD, Mar 3 2026](https://www.datacenterdynamics.com/en/news/google-files-for-fifth-data-center-at-midlothian-campus-in-texas/))","sourceUrl":"https://www.datacenterdynamics.com/en/news/google-files-for-fifth-data-center-at-midlothian-campus-in-texas/"},{"label":"Texas AI/cloud expansion context (reported)","value":"DCD notes that in November 2025 Google said it would spend $40 billion to expand cloud and AI infrastructure in Texas through 2027, including Ellis County expansion plus new campuses in Armstrong and Haskell Counties. Separate from that commitment, DCD mentions Google backing a TeraWulf/Fluidstack Abernathy project and a Wilbarger County site with AES onsite clean energy. Prefer not to assign any share of the $40B figure solely to Midlothian ([DCD, Mar 3 2026](https://www.datacenterdynamics.com/en/news/google-files-for-fifth-data-center-at-midlothian-campus-in-texas/))","sourceUrl":"https://www.datacenterdynamics.com/en/news/google-files-for-fifth-data-center-at-midlothian-campus-in-texas/"}],"reviewStatus":"reviewed","sources":[{"url":"https://www.datacenterdynamics.com/en/news/google-files-for-fifth-data-center-at-midlothian-campus-in-texas/","date":"2026-03-01","title":"Google files for fifth data center at Midlothian campus in Texas","publisher":"DCD"},{"url":"https://www.datacenter.fyi/facility/google-tx-f8cfce73","date":"2026-01-01","title":"Google — Red Oak, TX (facility profile)","publisher":"datacenter.fyi"}],"reviewNote":null,"createdAt":"2026-08-17T20:23:50.597Z","updatedAt":"2026-09-29T06:43:42.562Z","location":{"id":"c741667c-fad5-4047-b86c-d728be7b5e07","name":"Midlothian","slug":"midlothian-texas","kind":"city","parentLocationId":"45f67762-10f4-4255-be84-45c73efe25f9","region":"Texas","lat":32.482361,"lng":-96.9944489,"reviewStatus":"reviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-17T20:23:50.212Z","updatedAt":"2026-08-21T03:20:12.226Z"},"parties":[{"id":"4569238c-0a77-4509-8321-9c1523911474","dataCenterId":"242adcda-ceef-4893-a70a-153273e218ab","companyId":"0ed0d0e3-6e8b-4701-a812-f13221399dd4","externalName":"Google","role":"developer","structureNotes":"Via Alamo Mission LLC shell","createdAt":"2026-08-17T20:23:51.854Z","company":{"id":"0ed0d0e3-6e8b-4701-a812-f13221399dd4","name":"Google","slug":"google"}},{"id":"39b295b0-4f53-411e-bd03-252ce898e346","dataCenterId":"242adcda-ceef-4893-a70a-153273e218ab","companyId":"0ed0d0e3-6e8b-4701-a812-f13221399dd4","externalName":"Google","role":"operator","structureNotes":null,"createdAt":"2026-08-17T20:23:52.607Z","company":{"id":"0ed0d0e3-6e8b-4701-a812-f13221399dd4","name":"Google","slug":"google"}},{"id":"35a008dd-3b08-445b-b1a8-b9daa903b854","dataCenterId":"242adcda-ceef-4893-a70a-153273e218ab","companyId":null,"externalName":"Alamo Mission LLC","role":"developer","structureNotes":"Google development/shell entity (project code name 'Sharka') used to acquire Midlothian/Ellis County land and file permits at 3441 Railport Parkway","createdAt":"2026-08-19T00:15:35.262Z","company":null}],"capacityClaims":[{"id":"94fe3ae1-75a1-4364-b030-3a2a27cb086b","dataCenterId":"242adcda-ceef-4893-a70a-153273e218ab","series":"energized","valueGw":0.2663,"asOf":"2026-03-01T00:00:00.000Z","sourceUrl":"https://www.datacenter.fyi/facility/google-tx-f8cfce73","sourceType":"permit","evidenceTier":"verified","supersedesId":null,"note":"266.3 MW cited; buildout continuing","createdAt":"2026-08-17T20:23:51.321Z"}],"financialClaims":[{"id":"0a1d368d-977e-4363-8dee-dc2b24640f4a","dataCenterId":"242adcda-ceef-4893-a70a-153273e218ab","kind":"capex","label":"Sharka Building 5 (fifth Midlothian data center)","valueUsd":"880000000","capUsd":null,"conditions":"One-story, 288,000 sq ft data center at 3441 Railport Parkway; TDLR project registered Dec 8, 2025 (estimates subject to change)","asOf":"2025-12-08T00:00:00.000Z","sourceUrl":"https://finance.yahoo.com/news/north-texas-city-earmarked-nearly-220200323.html","sourceType":"journalist_report","evidenceTier":"reported","createdAt":"2026-08-19T00:15:33.742Z"}],"metricClaims":[{"id":"91dd9f4c-532a-4cde-ad3c-2f6d820454b5","dataCenterId":"242adcda-ceef-4893-a70a-153273e218ab","metricType":"capex_usd","valueNumeric":880000000,"valueText":"Fifth data center building (project Sharka), 288,000 sq ft","unit":null,"grantingJurisdiction":null,"asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://finance.yahoo.com/news/north-texas-city-earmarked-nearly-220200323.html","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":null,"createdAt":"2026-08-19T00:15:34.507Z"}],"powerProjects":[],"facilities":[{"slug":"google-midlothian-fifth-building-ellis-tx","name":"Google Midlothian Data Center (5th building)","status":"planned","criticalItMw":null,"facilityType":"hyperscale"},{"slug":"google-midlothian-tx","name":"Midlothian Data Center","status":"operating","criticalItMw":null,"facilityType":"hyperscale"}],"incidents":[],"events":[{"id":"d0abaf15-864d-4720-840e-ffdc7c1ca24c","dataCenterId":"242adcda-ceef-4893-a70a-153273e218ab","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: Alamo Mission LLC","occurredAt":"2026-08-19T00:15:35.646Z","createdAt":"2026-08-19T00:15:35.646Z"},{"id":"b1874090-a053-4133-83b9-d29e22737396","dataCenterId":"242adcda-ceef-4893-a70a-153273e218ab","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: Sharka Building 5 (fifth Midlothian data center)","occurredAt":"2026-08-19T00:15:34.126Z","createdAt":"2026-08-19T00:15:34.126Z"},{"id":"93ac2d8a-b7d4-4533-8011-9b8a5ef81275","dataCenterId":"242adcda-ceef-4893-a70a-153273e218ab","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"operator: Google","occurredAt":"2026-08-17T20:23:52.987Z","createdAt":"2026-08-17T20:23:52.987Z"},{"id":"0169e0f9-93de-433d-a513-c6c81d427cac","dataCenterId":"242adcda-ceef-4893-a70a-153273e218ab","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: Google","occurredAt":"2026-08-17T20:23:52.234Z","createdAt":"2026-08-17T20:23:52.234Z"},{"id":"63604b76-c9e0-4f73-bb29-9ecab6211ae8","dataCenterId":"242adcda-ceef-4893-a70a-153273e218ab","eventType":"capacity_changed","series":"energized","oldValue":null,"newValue":"0.2663","claimId":"94fe3ae1-75a1-4364-b030-3a2a27cb086b","detail":null,"occurredAt":"2026-08-17T20:23:51.628Z","createdAt":"2026-08-17T20:23:51.628Z"},{"id":"ffd13a9a-0939-49fc-873d-ae23f574b1c5","dataCenterId":"242adcda-ceef-4893-a70a-153273e218ab","eventType":"claim_recorded","series":"energized","oldValue":null,"newValue":"0.2663","claimId":"94fe3ae1-75a1-4364-b030-3a2a27cb086b","detail":"verified · permit","occurredAt":"2026-08-17T20:23:51.474Z","createdAt":"2026-08-17T20:23:51.474Z"}],"capacity_picture":{"announced_gw":null,"contracted_gw":null,"under_construction_gw":null,"energized_gw":0.2663,"announced_minus_energized_gw":null,"by_series":{"announced":null,"contracted":null,"under_construction":null,"energized":{"valueGw":0.2663,"asOf":"2026-03-01T00:00:00.000Z","evidenceTier":"verified","sourceUrl":"https://www.datacenter.fyi/facility/google-tx-f8cfce73"}}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Google Midlothian Campus (Alamo Mission)","url":"https://registry.deploy.report/datacenters/google-alamo-mission-midlothian-ellis-texas","geo":{"@type":"GeoCoordinates","latitude":32.4464066,"longitude":-97.0622467},"address":{"@type":"PostalAddress","addressLocality":"Midlothian"}}}