{"id":"0a3c8d26-336c-4f7a-8ffd-0899b60c0928","slug":"google-pryor-midamerica-oklahoma","name":"Google Pryor (MidAmerica) Data Center Campus","aliases":[],"locationId":"c2453a71-9f7b-4f8f-b7c0-9c59a0731711","lat":null,"lng":null,"locationPrecision":null,"landStatus":"private","lifecycleState":"partially_energized","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"SPP","waterSourceNotes":"Evaporative cooling; the facility drew about 1.1 billion gallons of water in one year from the Neosho River via the MidAmerica Industrial Park, discharging ~253 million gallons back to the river with the remainder lost to evaporation (July 2024 to June 2025, via open-records request).","servingUtility":null,"acreage":800,"totalBuildingSqft":null,"streetAddress":null,"notes":"Google's Pryor campus in the MidAmerica Industrial Park has operated since 2011 and has drawn about $4.4 billion in cumulative investment, ranking as one of Google's largest data centers. In August 2025 Google announced an additional $9 billion, two-year Oklahoma investment in cloud and AI infrastructure covering a Pryor expansion plus a new campus in Stillwater.","keyFacts":[{"label":"$9B Oklahoma package (primary)","value":"On Aug 13, 2025 Google announced an additional $9 billion investment in Oklahoma within the next two years for cloud and AI infrastructure, covering expansion of the existing Pryor facility plus a new Stillwater campus, alongside education and workforce programs ([Google blog, Aug 13 2025](https://blog.google/company-news/inside-google/company-announcements/google-american-innovation-oklahoma/); [Reuters, Aug 13 2025](https://www.reuters.com/business/google-pledges-9-billion-expand-ai-cloud-infrastructure-oklahoma-2025-08-13/))","sourceUrl":"https://blog.google/company-news/inside-google/company-announcements/google-american-innovation-oklahoma/"},{"label":"Pryor expansion scope (reported)","value":"In a News On 6 Q&A, Google's Kate Franko said the Pryor work adds two new buildings on the existing campus (capacity expansion without expanding the campus border), with Stillwater as a new, initially smaller campus, and completion looking toward late 2027 and 2028 ([News On 6](https://www.newson6.com/story/689d0eb852a00b10681eed26/google-data-centger-9-billion-investment-stitt-franko))","sourceUrl":"https://www.newson6.com/story/689d0eb852a00b10681eed26/google-data-centger-9-billion-investment-stitt-franko"},{"label":"Prior Pryor investment / online since 2011 (reported)","value":"The Oklahoman reported the Pryor MidAmerica campus opened in 2011 and that Google had already invested about $4.4 billion there before the Aug 2025 package ([The Oklahoman, Aug 13 2025](https://www.oklahoman.com/story/business/2025/08/13/google-announces-new-data-center-in-stillwater-expansion-in-pryor/85640825007/))","sourceUrl":"https://www.oklahoman.com/story/business/2025/08/13/google-announces-new-data-center-in-stillwater-expansion-in-pryor/85640825007/"},{"label":"Jobs / workforce programs (reported + primary)","value":"News On 6 quotes Google saying Pryor supports over 800 jobs. Google's blog also cites OU and OSU in the Google AI for Education Accelerator cohort and funding to help the electrical training ALLIANCE increase Oklahoma's electrical workforce pipeline by 135% ([News On 6](https://www.newson6.com/story/689d0eb852a00b10681eed26/google-data-centger-9-billion-investment-stitt-franko); [Google blog, Aug 13 2025](https://blog.google/company-news/inside-google/company-announcements/google-american-innovation-oklahoma/))","sourceUrl":"https://blog.google/company-news/inside-google/company-announcements/google-american-innovation-oklahoma/"}],"reviewStatus":"reviewed","sources":[{"url":"https://www.datacenterdynamics.com/en/news/google-to-invest-9bn-in-cloud-and-ai-infrastructure-in-oklahoma/","title":"DCD: Google to invest $9bn in Oklahoma cloud and AI"},{"url":"https://www.kosu.org/local-news/2025-08-14/google-announces-a-new-9-billion-cloud-and-ai-investment-in-oklahoma","title":"KOSU: Google $9B Oklahoma investment"},{"url":"https://www.okcommerce.gov/google-planning-another-expansion-for-pryor-data-center/","title":"Oklahoma Commerce: Google Pryor expansion"},{"url":"https://www.readfrontier.org/stories/as-data-centers-boom-in-oklahoma-so-does-water-demand/","title":"As data centers boom in Oklahoma, so does water demand","sourceName":"The Frontier"},{"url":"https://blog.google/company-news/inside-google/company-announcements/google-american-innovation-oklahoma/","date":"2025-08-13","title":"Google announces new $9 billion investment in Oklahoma","publisher":"Google"},{"url":"https://www.reuters.com/business/google-pledges-9-billion-expand-ai-cloud-infrastructure-oklahoma-2025-08-13/","date":"2025-08-13","title":"Google pledges $9 billion to expand AI, cloud infrastructure in Oklahoma","publisher":"Reuters"},{"url":"https://www.newson6.com/story/689d0eb852a00b10681eed26/google-data-centger-9-billion-investment-stitt-franko","title":"Google expands Oklahoma data centers with $9 billion investment: Q&A","publisher":"News On 6"},{"url":"https://www.oklahoman.com/story/business/2025/08/13/google-announces-new-data-center-in-stillwater-expansion-in-pryor/85640825007/","date":"2025-08-13","title":"Google announces new data center in Stillwater, expansion in Pryor","publisher":"The Oklahoman"}],"reviewNote":null,"createdAt":"2026-08-19T00:48:20.185Z","updatedAt":"2026-09-28T10:33:47.651Z","location":{"id":"c2453a71-9f7b-4f8f-b7c0-9c59a0731711","name":"Pryor","slug":"pryor-oklahoma","kind":"city","parentLocationId":"289036be-4e8f-4093-bace-28da0ec08890","region":"Oklahoma","lat":36.3084275,"lng":-95.3169136,"reviewStatus":"reviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-19T00:48:19.807Z","updatedAt":"2026-08-21T03:20:12.226Z"},"parties":[{"id":"862e1d68-c734-4aef-b47e-01193fcbef8f","dataCenterId":"0a3c8d26-336c-4f7a-8ffd-0899b60c0928","companyId":"0ed0d0e3-6e8b-4701-a812-f13221399dd4","externalName":null,"role":"operator","structureNotes":"Owner and operator","createdAt":"2026-08-19T00:48:21.720Z","company":{"id":"0ed0d0e3-6e8b-4701-a812-f13221399dd4","name":"Google","slug":"google"}},{"id":"868f9877-fd79-40d8-a7e6-e17b8856229d","dataCenterId":"0a3c8d26-336c-4f7a-8ffd-0899b60c0928","companyId":null,"externalName":"MidAmerica Industrial Park","role":"land_owner","structureNotes":"Host industrial park","createdAt":"2026-08-19T00:48:22.863Z","company":null},{"id":"dedaa6bb-38ad-4068-9b31-dccd6ac72311","dataCenterId":"0a3c8d26-336c-4f7a-8ffd-0899b60c0928","companyId":null,"externalName":"Grand River Dam Authority (GRDA)","role":"utility","structureNotes":"Supplies power to Google's Pryor campus, including Leeward solar portfolio","createdAt":"2026-08-19T01:32:21.134Z","company":null},{"id":"6af425f8-5bbd-401d-b345-37545b62da51","dataCenterId":"0a3c8d26-336c-4f7a-8ffd-0899b60c0928","companyId":null,"externalName":"Southwest Power Pool (SPP)","role":"grid_operator","structureNotes":null,"createdAt":"2026-08-19T01:32:22.265Z","company":null},{"id":"4f2fe01c-ee3d-4290-a0dc-e4c4256f0387","dataCenterId":"0a3c8d26-336c-4f7a-8ffd-0899b60c0928","companyId":null,"externalName":"Leeward Renewable Energy","role":"developer","structureNotes":"Solar generation developer for Google OK PPA","createdAt":"2026-08-19T01:32:23.437Z","company":null}],"capacityClaims":[{"id":"aeeb5f8b-c67c-4503-bea8-91d1a952b594","dataCenterId":"0a3c8d26-336c-4f7a-8ffd-0899b60c0928","series":"energized","valueGw":0.088,"asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://cleanview.co/data-centers/oklahoma","sourceType":"tracker","evidenceTier":"claimed","supersedesId":null,"note":"Google Pryor Building 2 per Cleanview tracker; campus operating since 2011","createdAt":"2026-08-19T01:32:18.602Z"}],"financialClaims":[{"id":"184816cc-8dc9-4b10-9c71-49970f946dd4","dataCenterId":"0a3c8d26-336c-4f7a-8ffd-0899b60c0928","kind":"capex","label":"Google Oklahoma cloud/AI investment (2-year)","valueUsd":"9000000000","capUsd":null,"conditions":"Covers Pryor expansion and a new Stillwater campus; Pryor has ~$4.4B cumulative to date","asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/google-to-invest-9bn-in-cloud-and-ai-infrastructure-in-oklahoma/","sourceType":"press_release","evidenceTier":"reported","createdAt":"2026-08-19T00:48:20.570Z"},{"id":"454f9404-1dfa-43de-83d8-c5f67bde9e6a","dataCenterId":"0a3c8d26-336c-4f7a-8ffd-0899b60c0928","kind":"capex","label":"New OK cloud/AI investment (Pryor + Stillwater), 2 yrs","valueUsd":"9000000000","capUsd":null,"conditions":"Statewide (Pryor expansion + new Stillwater campus), not Pryor-only","asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://www.kosu.org/local-news/2025-08-14/google-announces-a-new-9-billion-cloud-and-ai-investment-in-oklahoma","sourceType":"journalist_report","evidenceTier":"reported","createdAt":"2026-08-19T01:32:19.138Z"}],"metricClaims":[{"id":"5ea5bde8-095d-492c-a8f0-1389d43017ff","dataCenterId":"0a3c8d26-336c-4f7a-8ffd-0899b60c0928","metricType":"jobs_permanent","valueNumeric":400,"valueText":"400+ employed at MidAmerica campus","unit":null,"grantingJurisdiction":null,"asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://www.newson6.com/story/689ceb7935c02bda0f23fd03/google-9-billion-oklahoma-investment-pryor-stillwater-data-centers-workforce-programs-jobs-ai","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":null,"createdAt":"2026-08-19T01:32:20.331Z"}],"powerProjects":[{"id":"fac923d0-0c70-462f-b201-0c680ed2f9b7","dataCenterId":"0a3c8d26-336c-4f7a-8ffd-0899b60c0928","name":"Leeward 724MW solar portfolio (via GRDA)","type":"solar","capacityGw":0.724,"lifecycleState":"financed","sourceUrl":"https://www.datacenterdynamics.com/en/news/google-signs-ppa-with-leeward-to-power-oklahoma-data-center-operations/","evidenceTier":"reported","note":"Solar delivered to Grand River Dam Authority, which supplies Google's Pryor operations; part of >700MW new clean capacity added for OK ops","createdAt":"2026-08-19T01:32:19.940Z"}],"facilities":[{"slug":"google-mayes-county-ok","name":"Mayes County Data Center (Pryor)","status":"operating","criticalItMw":null,"facilityType":"hyperscale"}],"incidents":[],"events":[{"id":"4df8da97-e287-4077-a437-a32f917befb9","dataCenterId":"0a3c8d26-336c-4f7a-8ffd-0899b60c0928","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: Leeward Renewable Energy","occurredAt":"2026-08-19T01:32:23.827Z","createdAt":"2026-08-19T01:32:23.827Z"},{"id":"552c025a-e841-439c-9f9a-03123615a0aa","dataCenterId":"0a3c8d26-336c-4f7a-8ffd-0899b60c0928","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"grid_operator: Southwest Power Pool (SPP)","occurredAt":"2026-08-19T01:32:22.656Z","createdAt":"2026-08-19T01:32:22.656Z"},{"id":"7d86a21a-ef28-461b-807a-89c75cb6fc3a","dataCenterId":"0a3c8d26-336c-4f7a-8ffd-0899b60c0928","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: Grand River Dam Authority (GRDA)","occurredAt":"2026-08-19T01:32:21.508Z","createdAt":"2026-08-19T01:32:21.508Z"},{"id":"665c8ee2-5d18-4c2b-94b3-44900eee4454","dataCenterId":"0a3c8d26-336c-4f7a-8ffd-0899b60c0928","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: New OK cloud/AI investment (Pryor + Stillwater), 2 yrs","occurredAt":"2026-08-19T01:32:19.528Z","createdAt":"2026-08-19T01:32:19.528Z"},{"id":"eb630606-a743-496a-9007-b0eb7a089f82","dataCenterId":"0a3c8d26-336c-4f7a-8ffd-0899b60c0928","eventType":"capacity_changed","series":"energized","oldValue":null,"newValue":"0.088","claimId":"aeeb5f8b-c67c-4503-bea8-91d1a952b594","detail":null,"occurredAt":"2026-08-19T01:32:18.913Z","createdAt":"2026-08-19T01:32:18.913Z"},{"id":"fa6cfe30-9e5c-4e56-b402-965b4bca4e53","dataCenterId":"0a3c8d26-336c-4f7a-8ffd-0899b60c0928","eventType":"claim_recorded","series":"energized","oldValue":null,"newValue":"0.088","claimId":"aeeb5f8b-c67c-4503-bea8-91d1a952b594","detail":"claimed · tracker","occurredAt":"2026-08-19T01:32:18.759Z","createdAt":"2026-08-19T01:32:18.759Z"},{"id":"a4abf159-8f26-4d37-9786-cb6da3f67bde","dataCenterId":"0a3c8d26-336c-4f7a-8ffd-0899b60c0928","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"land_owner: MidAmerica Industrial Park","occurredAt":"2026-08-19T00:48:23.254Z","createdAt":"2026-08-19T00:48:23.254Z"},{"id":"4a198e3a-3a73-4fff-9ab7-1ffb9abc15ec","dataCenterId":"0a3c8d26-336c-4f7a-8ffd-0899b60c0928","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"operator: 0ed0d0e3-6e8b-4701-a812-f13221399dd4","occurredAt":"2026-08-19T00:48:22.100Z","createdAt":"2026-08-19T00:48:22.100Z"},{"id":"998e77a6-b440-40aa-8ebb-78bcfad31f2e","dataCenterId":"0a3c8d26-336c-4f7a-8ffd-0899b60c0928","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: Google Oklahoma cloud/AI investment (2-year)","occurredAt":"2026-08-19T00:48:20.953Z","createdAt":"2026-08-19T00:48:20.953Z"}],"capacity_picture":{"announced_gw":null,"contracted_gw":null,"under_construction_gw":null,"energized_gw":0.088,"announced_minus_energized_gw":null,"by_series":{"announced":null,"contracted":null,"under_construction":null,"energized":{"valueGw":0.088,"asOf":"2025-06-01T00:00:00.000Z","evidenceTier":"claimed","sourceUrl":"https://cleanview.co/data-centers/oklahoma"}}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Google Pryor (MidAmerica) Data Center Campus","url":"https://registry.deploy.report/datacenters/google-pryor-midamerica-oklahoma","address":{"@type":"PostalAddress","addressLocality":"Pryor"}}}