{"id":"68549634-6d59-45db-864b-212966f675e3","slug":"humain-saudi-arabia","name":"HUMAIN (Riyadh & Dammam flagship data centers)","aliases":[],"locationId":"dbfe2930-6ef3-4852-83ad-2a138e235a5d","lat":24.7136,"lng":46.6753,"locationPrecision":"city","landStatus":"private","lifecycleState":"under_construction","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"Saudi Electricity Company (SEC)","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"PIF-owned sovereign AI champion (launched May 2025) that broke ground on twin 100MW flagship campuses in Riyadh and Dammam (Eastern Province), with first facilities expected to go live Q2 2026. Riyadh phase 1 uses 18,000 Nvidia GB300 chips, with Nvidia committed to several hundred thousand more (up to ~500MW), plus a $10B AMD deal and a Qualcomm MoU (up to 200MW). Stated roadmap: 1.9GW by 2030 scaling toward 6.6GW; no independently confirmed energized capacity as of Aug 2026.","keyFacts":[{"label":"Twin campuses / initial MW (reported)","value":"Aug 2025 trade press reported HUMAIN broke ground on twin flagship data centers in Riyadh and Dammam (Eastern Province), each with initial capacity of 100 MW, with first facilities expected to go live in Q2 2026 per CEO Tareq Amin comments to Bloomberg as carried by DCD ([Data Center Dynamics, Aug 26 2025](https://www.datacenterdynamics.com/en/news/humain-breaks-ground-two-data-centers-with-first-facilities-expected-to-go-live-in-q2-2026/); [Reuters, Aug 25 2025](https://www.reuters.com/world/middle-east/saudis-humain-launch-data-centers-with-us-chips-early-2026-bloomberg-news-2025-08-25/))","sourceUrl":"https://www.datacenterdynamics.com/en/news/humain-breaks-ground-two-data-centers-with-first-facilities-expected-to-go-live-in-q2-2026/"},{"label":"Ownership / launch (reported)","value":"HUMAIN is described as a PIF subsidiary AI venture established in May 2025, with a stated aim of delivering about 6.6 GW of data center capacity over the next decade ([Data Center Dynamics, Aug 26 2025](https://www.datacenterdynamics.com/en/news/humain-breaks-ground-two-data-centers-with-first-facilities-expected-to-go-live-in-q2-2026/))","sourceUrl":"https://www.datacenterdynamics.com/en/news/humain-breaks-ground-two-data-centers-with-first-facilities-expected-to-go-live-in-q2-2026/"},{"label":"NVIDIA GB300 phase one (reported)","value":"DCD reports HUMAIN purchased 18,000 NVIDIA GB300 chips for the sites, with company statements that several hundred thousand more are on the way, subject to US export approval timelines ([Data Center Dynamics, Aug 26 2025](https://www.datacenterdynamics.com/en/news/humain-breaks-ground-two-data-centers-with-first-facilities-expected-to-go-live-in-q2-2026/))","sourceUrl":"https://www.datacenterdynamics.com/en/news/humain-breaks-ground-two-data-centers-with-first-facilities-expected-to-go-live-in-q2-2026/"},{"label":"Chip / cloud partners (reported)","value":"Alongside NVIDIA, DCD cites an AWS $5 billion AI Zone partnership, an AMD deal framed at 500 MW of compute, Groq chips for inference, and MoUs with Qualcomm and Cisco ([Data Center Dynamics, Aug 26 2025](https://www.datacenterdynamics.com/en/news/humain-breaks-ground-two-data-centers-with-first-facilities-expected-to-go-live-in-q2-2026/))","sourceUrl":"https://www.datacenterdynamics.com/en/news/humain-breaks-ground-two-data-centers-with-first-facilities-expected-to-go-live-in-q2-2026/"},{"label":"Land bank / Qualcomm AI100 (reported)","value":"A later DCD piece says HUMAIN confirmed securing 211 plots of land across Saudi Arabia for data center expansion, and that CEO Amin posted about delivery of Qualcomm AI100-powered racks (phase one 1,024 accelerators, Adobe cited as first customer) into a data center under construction ([Data Center Dynamics](https://www.datacenterdynamics.com/en/news/humain-secures-211-plots-of-land-in-saudi-arabia-for-data-centers/))","sourceUrl":"https://www.datacenterdynamics.com/en/news/humain-secures-211-plots-of-land-in-saudi-arabia-for-data-centers/"}],"reviewStatus":"reviewed","sources":[{"url":"https://www.datacenterdynamics.com/en/news/humain-breaks-ground-two-data-centers-with-first-facilities-expected-to-go-live-in-q2-2026/","title":"Humain breaks ground two data centers, first facilities expected Q2 2026","sourceName":"Data Center Dynamics"},{"url":"https://www.datacenterdynamics.com/en/news/saudi-arabian-ai-venture-humain-buys-18000-nvidia-gb300-chips-several-hundred-thousand-more-on-the-way/","title":"Saudi AI venture Humain buys 18,000 Nvidia GB300 chips","sourceName":"Data Center Dynamics"},{"url":"https://www.tomshardware.com/pc-components/gpus/nvidia-sending-18-000-ai-gpus-to-saudi-arabias-state-backed-ai-data-centers-in-wake-of-cancelled-export-rules","title":"Nvidia to send 18,000 AI GPUs to Saudi Arabia's state-backed AI data centers","sourceName":"Tom's Hardware"},{"url":"https://www.arabnews.com/node/2630217/business-economy","title":"PIF-backed Humain secures up to $1.2bn to expand AI infrastructure","sourceName":"Arab News"},{"url":"https://www.reuters.com/world/middle-east/saudis-humain-launch-data-centers-with-us-chips-early-2026-bloomberg-news-2025-08-25/","date":"2025-08-25","title":"Saudi's Humain to launch data centers with US chips in early 2026, Bloomberg News reports","publisher":"Reuters"},{"url":"https://www.datacenterdynamics.com/en/news/humain-secures-211-plots-of-land-in-saudi-arabia-for-data-centers/","title":"Humain secures 211 plots of land in Saudi Arabia for data centers","publisher":"Data Center Dynamics"}],"reviewNote":null,"createdAt":"2026-08-17T18:11:59.355Z","updatedAt":"2026-09-28T09:26:02.084Z","location":{"id":"dbfe2930-6ef3-4852-83ad-2a138e235a5d","name":"Riyadh","slug":"riyadh-riyadh-province","kind":"city","parentLocationId":"ebe579ff-086e-424f-bd25-89af910e6ada","region":"Middle East","lat":24.7136,"lng":46.6753,"reviewStatus":"reviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-17T18:11:58.979Z","updatedAt":"2026-08-21T03:20:12.226Z"},"parties":[{"id":"b83888ee-48a5-43c6-a76e-46f6c6dad480","dataCenterId":"68549634-6d59-45db-864b-212966f675e3","companyId":null,"externalName":"Public Investment Fund (PIF)","role":"financier","structureNotes":"Sole owner / sovereign backer.","createdAt":"2026-08-17T18:12:03.699Z","company":null},{"id":"b0c61f09-907a-45b5-9ebf-77f9adb33add","dataCenterId":"68549634-6d59-45db-864b-212966f675e3","companyId":null,"externalName":"Nvidia, AMD, Qualcomm","role":"chip_supplier","structureNotes":"Nvidia 18,000 GB300 (Riyadh) + hundreds of thousands more; $10B AMD deal; Qualcomm up to 200MW.","createdAt":"2026-08-17T18:12:04.462Z","company":null},{"id":"f243adcd-2724-4c1b-b3e4-065ebff205ec","dataCenterId":"68549634-6d59-45db-864b-212966f675e3","companyId":null,"externalName":"MIS (Middle East Specialized Cables / contractor consortium)","role":"construction","structureNotes":"Awarded HUMAIN AI data center construction project.","createdAt":"2026-08-17T18:12:05.207Z","company":null},{"id":"f0f0e273-62ef-499c-aa50-70122ac81009","dataCenterId":"68549634-6d59-45db-864b-212966f675e3","companyId":"c39dd490-8600-4e60-817d-a5dc1063bdb9","externalName":"HUMAIN","role":"developer","structureNotes":"PIF-owned sovereign AI company, launched May 2025.","createdAt":"2026-08-17T18:12:02.940Z","company":{"id":"c39dd490-8600-4e60-817d-a5dc1063bdb9","name":"HUMAIN","slug":"humain"}}],"capacityClaims":[{"id":"f70a7380-9400-4625-a590-44ee694d6ae3","dataCenterId":"68549634-6d59-45db-864b-212966f675e3","series":"announced","valueGw":1.9,"asOf":"2026-01-01T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/humain-breaks-ground-two-data-centers-with-first-facilities-expected-to-go-live-in-q2-2026/","sourceType":"journalist_report","evidenceTier":"claimed","supersedesId":null,"note":"Roadmap target 1.9GW by 2030, scaling toward 6.6GW long-term.","createdAt":"2026-08-17T18:12:00.022Z"},{"id":"7ea7962c-0a8c-4e70-9c2d-87479f85e3f7","dataCenterId":"68549634-6d59-45db-864b-212966f675e3","series":"energized","valueGw":0,"asOf":"2026-07-31T00:00:00.000Z","sourceUrl":"https://vision2030.ai/analysis/humain-data-centers-riyadh-dammam-status/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"As of July 31 2026 no filing or credible report confirms HUMAIN's Riyadh or Dammam sites (each ~100MW announced) in commercial service; both under construction, original Q2 2026 go-live missed. No operational confirmation.","createdAt":"2026-08-17T18:33:50.559Z"},{"id":"cd1371e0-84b5-4d75-8cf5-c6c3508d9b4e","dataCenterId":"68549634-6d59-45db-864b-212966f675e3","series":"under_construction","valueGw":0.2,"asOf":"2026-01-01T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/humain-breaks-ground-two-data-centers-with-first-facilities-expected-to-go-live-in-q2-2026/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Twin 100MW flagship campuses (Riyadh + Dammam) under construction, go-live expected Q2 2026.","createdAt":"2026-08-17T18:12:00.861Z"}],"financialClaims":[{"id":"8ae5a1af-d7a9-4407-aa03-aa793b829399","dataCenterId":"68549634-6d59-45db-864b-212966f675e3","kind":"backstop","label":"Debt financing framework to develop up to 250MW","valueUsd":"1200000000","capUsd":null,"conditions":"Up to $1.2bn financing framework to fund additional AI data center capacity.","asOf":"2026-01-01T00:00:00.000Z","sourceUrl":"https://www.arabnews.com/node/2630217/business-economy","sourceType":"journalist_report","evidenceTier":"reported","createdAt":"2026-08-17T18:12:02.181Z"},{"id":"1bbbac60-d2a5-432a-b349-08da021b91c3","dataCenterId":"68549634-6d59-45db-864b-212966f675e3","kind":"capex","label":"AMD strategic AI infrastructure deal","valueUsd":"10000000000","capUsd":null,"conditions":"Multi-year AMD compute buildout; may become a JV with AMD equity in a Saudi fund.","asOf":"2025-05-13T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/saudi-arabian-ai-venture-humain-buys-18000-nvidia-gb300-chips-several-hundred-thousand-more-on-the-way/","sourceType":"journalist_report","evidenceTier":"claimed","createdAt":"2026-08-17T18:12:01.414Z"}],"metricClaims":[{"id":"a543cda1-8f52-47cd-a246-e73ef236e3c4","dataCenterId":"68549634-6d59-45db-864b-212966f675e3","metricType":"gpu_count","valueNumeric":18000,"valueText":"18,000 GB300","unit":null,"grantingJurisdiction":null,"asOf":"2026-01-01T00:00:00.000Z","sourceUrl":"https://nvidianews.nvidia.com/news/humain-and-nvidia","sourceType":"press","evidenceTier":"reported","supersedesId":null,"note":null,"createdAt":"2026-08-18T21:53:40.261Z"}],"powerProjects":[],"facilities":[],"incidents":[],"events":[{"id":"690c3270-be2d-47e3-acb0-9615952b9ad1","dataCenterId":"68549634-6d59-45db-864b-212966f675e3","eventType":"party_linked","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: linked externalName \"HUMAIN\" to company humain","occurredAt":"2026-08-31T01:15:07.511Z","createdAt":"2026-08-31T01:15:07.511Z"},{"id":"ffa54bb0-92ff-4ab1-9211-988d54b00c08","dataCenterId":"68549634-6d59-45db-864b-212966f675e3","eventType":"capacity_changed","series":"energized","oldValue":null,"newValue":"0","claimId":"7ea7962c-0a8c-4e70-9c2d-87479f85e3f7","detail":null,"occurredAt":"2026-08-17T18:33:50.863Z","createdAt":"2026-08-17T18:33:50.863Z"},{"id":"27b98557-214b-4681-b0fb-803f8220d753","dataCenterId":"68549634-6d59-45db-864b-212966f675e3","eventType":"claim_recorded","series":"energized","oldValue":null,"newValue":"0","claimId":"7ea7962c-0a8c-4e70-9c2d-87479f85e3f7","detail":"reported · journalist_report","occurredAt":"2026-08-17T18:33:50.712Z","createdAt":"2026-08-17T18:33:50.712Z"},{"id":"2eff99f8-3edf-43e5-aad7-12562a68f08c","dataCenterId":"68549634-6d59-45db-864b-212966f675e3","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"construction: MIS (Middle East Specialized Cables / contractor consortium)","occurredAt":"2026-08-17T18:12:05.592Z","createdAt":"2026-08-17T18:12:05.592Z"},{"id":"d95f28e5-7d17-4fc5-8ae2-daeaa74260cc","dataCenterId":"68549634-6d59-45db-864b-212966f675e3","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"chip_supplier: Nvidia, AMD, Qualcomm","occurredAt":"2026-08-17T18:12:04.832Z","createdAt":"2026-08-17T18:12:04.832Z"},{"id":"2a5d0202-c200-4a10-99cf-7b97c82d3f07","dataCenterId":"68549634-6d59-45db-864b-212966f675e3","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"financier: Public Investment Fund (PIF)","occurredAt":"2026-08-17T18:12:04.081Z","createdAt":"2026-08-17T18:12:04.081Z"},{"id":"c77dfdac-e2ad-4878-85ac-5d0dc3777056","dataCenterId":"68549634-6d59-45db-864b-212966f675e3","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: HUMAIN","occurredAt":"2026-08-17T18:12:03.315Z","createdAt":"2026-08-17T18:12:03.315Z"},{"id":"a37f4011-7f93-4a8b-94be-91cc3b49e2a4","dataCenterId":"68549634-6d59-45db-864b-212966f675e3","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"backstop: Debt financing framework to develop up to 250MW","occurredAt":"2026-08-17T18:12:02.557Z","createdAt":"2026-08-17T18:12:02.557Z"},{"id":"fa11888d-b438-4af9-a15e-a59e0cca595b","dataCenterId":"68549634-6d59-45db-864b-212966f675e3","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: AMD strategic AI infrastructure deal","occurredAt":"2026-08-17T18:12:01.797Z","createdAt":"2026-08-17T18:12:01.797Z"},{"id":"65d605f9-7798-4bf8-99f9-1df3c93a5aac","dataCenterId":"68549634-6d59-45db-864b-212966f675e3","eventType":"capacity_changed","series":"under_construction","oldValue":null,"newValue":"0.2","claimId":"cd1371e0-84b5-4d75-8cf5-c6c3508d9b4e","detail":null,"occurredAt":"2026-08-17T18:12:01.186Z","createdAt":"2026-08-17T18:12:01.186Z"},{"id":"ccf53f7c-ef6f-4aad-b43e-b67c666d7092","dataCenterId":"68549634-6d59-45db-864b-212966f675e3","eventType":"claim_recorded","series":"under_construction","oldValue":null,"newValue":"0.2","claimId":"cd1371e0-84b5-4d75-8cf5-c6c3508d9b4e","detail":"reported · journalist_report","occurredAt":"2026-08-17T18:12:01.012Z","createdAt":"2026-08-17T18:12:01.012Z"},{"id":"ed1d1bb6-a95b-4850-93cf-57c3d1eb01dc","dataCenterId":"68549634-6d59-45db-864b-212966f675e3","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"1.9","claimId":"f70a7380-9400-4625-a590-44ee694d6ae3","detail":null,"occurredAt":"2026-08-17T18:12:00.328Z","createdAt":"2026-08-17T18:12:00.328Z"},{"id":"4d6d1172-5586-47d8-8a18-5f08d83ce0ba","dataCenterId":"68549634-6d59-45db-864b-212966f675e3","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"1.9","claimId":"f70a7380-9400-4625-a590-44ee694d6ae3","detail":"claimed · journalist_report","occurredAt":"2026-08-17T18:12:00.173Z","createdAt":"2026-08-17T18:12:00.173Z"}],"capacity_picture":{"announced_gw":1.9,"contracted_gw":null,"under_construction_gw":0.2,"energized_gw":0,"announced_minus_energized_gw":1.9,"by_series":{"announced":{"valueGw":1.9,"asOf":"2026-01-01T00:00:00.000Z","evidenceTier":"claimed","sourceUrl":"https://www.datacenterdynamics.com/en/news/humain-breaks-ground-two-data-centers-with-first-facilities-expected-to-go-live-in-q2-2026/"},"contracted":null,"under_construction":{"valueGw":0.2,"asOf":"2026-01-01T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://www.datacenterdynamics.com/en/news/humain-breaks-ground-two-data-centers-with-first-facilities-expected-to-go-live-in-q2-2026/"},"energized":{"valueGw":0,"asOf":"2026-07-31T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://vision2030.ai/analysis/humain-data-centers-riyadh-dammam-status/"}}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"HUMAIN (Riyadh & Dammam flagship data centers)","url":"https://registry.deploy.report/datacenters/humain-saudi-arabia","geo":{"@type":"GeoCoordinates","latitude":24.7136,"longitude":46.6753},"address":{"@type":"PostalAddress","addressLocality":"Riyadh"}}}