{"id":"aca9b61a-c103-4846-824b-97b2eebbb858","slug":"khazna-qaj1-ajman-ai-data-center","name":"Khazna QAJ1 Ajman AI-Optimized Data Center","aliases":["Khazna Ajman AI Campus","Khazna Ajman AJM1","Khazna Ajman"],"locationId":"650807a2-5d50-478b-9cba-22f7837e3b74","lat":null,"lng":null,"locationPrecision":null,"landStatus":"private","lifecycleState":"under_construction","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":"2026-12-01T00:00:00.000Z","expectedEnergizationPrecision":"month","expectedEnergizationMilestone":"phase_1","dedicatedSubstation":null,"gridOperator":"other","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Khazna Data Centers (a G42 company) is building the UAE's first AI-optimized, liquid-cooled data center in Ajman: 100MW across 20 data halls of 5MW each on ~100,000 sqm, announced October 2024 with Microsoft as anchor tenant. It received Uptime Tier III design certification in February 2026; phase 1 completion is expected December 2026.","keyFacts":[{"label":"Announcement (Oct 2024)","value":"100 MW AI data center in Ajman; Khazna's largest at announcement"},{"label":"Design (company-claimed)","value":"About 100,000 sq m; 20 halls of 5 MW; power from EtihadWE"},{"label":"Original schedule (company-claimed)","value":"Operations targeted Q3 2025"},{"label":"Tier III design (Feb 2026)","value":"Uptime Tier III design certification; liquid cooling"},{"label":"IT capacity (company-claimed)","value":"100 MW AI-capable capacity coming to Ajman"}],"reviewStatus":"reviewed","sources":[{"url":"https://www.g42.ai/resources/news/khazna-announces-uaes-first-ai-optimized-data-center-and-largest-its-portfolio","title":"Khazna Announces the UAE's First AI-Optimized Data Center (G42)"},{"url":"https://www.blackridgeresearch.com/project-profiles/ajman-data-center-project-khazna-location-cost-contractors-current-status-latest-updates","title":"Khazna QAJ1 Ajman Data Center: Latest Updates (BlackRidge Research)"},{"url":"https://khaznadatacenters.com/press-release/khazna-announces-the-uaes-first-ai-optimized-data-center-and-the-largest-in-its-portfolio-powering-the-nations-drive-toward-ai-leadership/","date":"2024-10-15","title":"Khazna Announces the UAE's First AI-Optimized Data Center","publisher":"Khazna Data Centers"},{"url":"https://khaznadatacenters.com/press-release/khazna-awarded-tier-iii-certification-of-design-documents-for-ajman-uae-facility/","date":"2026-02-24","title":"Khazna Awarded Tier III Certification of Design Documents for Ajman Facility","publisher":"Khazna / Uptime Institute"},{"url":"https://khaznadatacenters.com/about-us/","title":"Khazna Ajman AI Campus — khazna-data-centers facility"},{"url":"https://en.wikipedia.org/wiki/G42_(company)","title":"Khazna Ajman AJM1 — g42 facility"},{"url":"https://guest.meed.com/khazna-breaks-ground-on-new-uae-data-centre-projects","title":"Khazna breaks ground on new UAE data centre projects","sourceName":"MEED","publishedAt":"2025-04-22"}],"reviewNote":null,"createdAt":"2026-08-19T00:49:02.009Z","updatedAt":"2026-11-18T03:27:53.449Z","location":{"id":"650807a2-5d50-478b-9cba-22f7837e3b74","name":"Ajman","slug":"ajman-ajman","kind":"city","parentLocationId":"8c0ff643-dd96-4cc8-803a-8e49dd74d0d5","region":null,"lat":25.332875,"lng":55.9960073,"reviewStatus":"reviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-19T00:49:01.554Z","updatedAt":"2026-08-21T03:20:12.226Z"},"parties":[{"id":"6b5c66fa-e243-43b8-bc19-1695efba7304","dataCenterId":"aca9b61a-c103-4846-824b-97b2eebbb858","companyId":null,"externalName":"Khazna Data Centers","role":"developer","structureNotes":"G42 Group subsidiary","createdAt":"2026-08-19T00:49:04.393Z","company":null},{"id":"15a19fd4-95ec-4d5e-ac0e-7e4a2a447963","dataCenterId":"aca9b61a-c103-4846-824b-97b2eebbb858","companyId":null,"externalName":"Khazna Data Centers","role":"operator","structureNotes":null,"createdAt":"2026-08-19T00:49:05.552Z","company":null},{"id":"7d16437c-b29b-4a3b-abc2-b103e4134d9a","dataCenterId":"aca9b61a-c103-4846-824b-97b2eebbb858","companyId":"b8670b58-67f2-4b87-9b46-9e16588dc1e6","externalName":null,"role":"tenant","structureNotes":"Anchor tenant; first 30MW AI deployment phase","createdAt":"2026-08-19T00:49:06.702Z","company":{"id":"b8670b58-67f2-4b87-9b46-9e16588dc1e6","name":"Microsoft","slug":"microsoft"}},{"id":"b9e7f4b3-c5c9-414a-b3d1-e38c8b71022b","dataCenterId":"aca9b61a-c103-4846-824b-97b2eebbb858","companyId":null,"externalName":"Etihad Water and Electricity Company (EtihadWE)","role":"utility","structureNotes":"Power supply","createdAt":"2026-08-19T00:49:07.828Z","company":null},{"id":"1b064393-0016-4ef0-8e92-4e1de6fcb1fb","dataCenterId":"aca9b61a-c103-4846-824b-97b2eebbb858","companyId":null,"externalName":"Laing O'Rourke","role":"construction","structureNotes":"Main contractor","createdAt":"2026-08-19T00:49:08.970Z","company":null},{"id":"045f8dc9-48b6-407a-ae7c-a49f1d3b36dc","dataCenterId":"aca9b61a-c103-4846-824b-97b2eebbb858","companyId":"e9d5815b-544a-4ddd-b5d3-8b5ee490775c","externalName":null,"role":"developer","structureNotes":null,"createdAt":"2026-08-27T22:22:44.216Z","company":{"id":"e9d5815b-544a-4ddd-b5d3-8b5ee490775c","name":"Khazna Data Centers","slug":"khazna-data-centers"}},{"id":"50228185-d02c-4f59-9327-5d3c71e4e41a","dataCenterId":"aca9b61a-c103-4846-824b-97b2eebbb858","companyId":"cd2ae1e8-3aa0-49ab-b4e4-494da9114b87","externalName":null,"role":"developer","structureNotes":null,"createdAt":"2026-08-28T00:09:04.711Z","company":{"id":"cd2ae1e8-3aa0-49ab-b4e4-494da9114b87","name":"G42","slug":"g42"}}],"capacityClaims":[{"id":"7bd99528-db3d-4b06-be6e-6d246fd18528","dataCenterId":"aca9b61a-c103-4846-824b-97b2eebbb858","series":"announced","valueGw":0.1,"asOf":"2024-10-01T00:00:00.000Z","sourceUrl":"https://www.g42.ai/resources/news/khazna-announces-uaes-first-ai-optimized-data-center-and-largest-its-portfolio","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"100MW across 20 data halls of 5MW each","createdAt":"2026-08-19T00:49:03.080Z"},{"id":"ea247de7-c395-448c-9394-f181fd6b5471","dataCenterId":"aca9b61a-c103-4846-824b-97b2eebbb858","series":"under_construction","valueGw":0.1,"asOf":"2024-10-01T00:00:00.000Z","sourceUrl":"https://www.g42.ai/resources/news/khazna-announces-uaes-first-ai-optimized-data-center-and-largest-its-portfolio","sourceType":"press_release","evidenceTier":"verified","supersedesId":null,"note":"100 MW IT capacity across 20 data halls (5 MW each) on ~100,000 sqm; UAE's first AI-optimized liquid-cooled data center; Microsoft anchor tenant. Uptime Tier III design certification awarded Feb 2026; phase due Dec 2026.","createdAt":"2026-08-19T01:33:17.223Z"}],"financialClaims":[],"metricClaims":[{"id":"9a616b31-9ac6-4261-97df-51ad48c4b194","dataCenterId":"aca9b61a-c103-4846-824b-97b2eebbb858","metricType":"cooling_type","valueNumeric":null,"valueText":"liquid cooling (first certified liquid-cooled AI data center in MENA)","unit":null,"grantingJurisdiction":null,"asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://www.blackridgeresearch.com/project-profiles/ajman-data-center-project-khazna-location-cost-contractors-current-status-latest-updates","sourceType":"tracker","evidenceTier":"claimed","supersedesId":null,"note":null,"createdAt":"2026-08-19T00:49:03.624Z"},{"id":"ca4dd9d1-89df-4a4b-9d80-5501ad3b83cf","dataCenterId":"aca9b61a-c103-4846-824b-97b2eebbb858","metricType":"cooling_type","valueNumeric":null,"valueText":"Liquid cooling (first certified AI data center with liquid cooling in MENA); Tier III design","unit":null,"grantingJurisdiction":null,"asOf":"2024-06-01T00:00:00.000Z","sourceUrl":"https://www.g42.ai/resources/news/khazna-announces-uaes-first-ai-optimized-data-center-and-largest-its-portfolio","sourceType":"press_release","evidenceTier":"verified","supersedesId":null,"note":null,"createdAt":"2026-08-19T01:33:17.761Z"}],"powerProjects":[],"permits":[],"facilities":[],"incidents":[],"events":[{"id":"dcfffb51-b6c3-4eeb-ab32-ae5224af308f","dataCenterId":"aca9b61a-c103-4846-824b-97b2eebbb858","eventType":"energization_date_changed","series":null,"oldValue":null,"newValue":"2026-12-01|month","claimId":null,"detail":"intake proposal b4e937b6-1f37-46bc-a3fa-4f6093a1ffb2","occurredAt":"2026-11-18T03:27:54.132Z","createdAt":"2026-11-18T03:27:54.132Z"},{"id":"93e24dc5-43a7-4c4b-a8f8-aef80a213c98","dataCenterId":"aca9b61a-c103-4846-824b-97b2eebbb858","eventType":"merged_duplicate","series":null,"oldValue":"g42-khazna-ajman-ajm1","newValue":"khazna-qaj1-ajman-ai-data-center","claimId":null,"detail":"Duplicate campus record g42-khazna-ajman-ajm1 merged into this one (dc-merge-2026-11-17)","occurredAt":"2026-11-18T02:53:03.148Z","createdAt":"2026-11-18T02:53:03.148Z"},{"id":"8d40182a-189b-44ab-badf-b3119b1b340d","dataCenterId":"aca9b61a-c103-4846-824b-97b2eebbb858","eventType":"merged_duplicate","series":null,"oldValue":"khazna-data-centers-khazna-ajman-ai-campus","newValue":"khazna-qaj1-ajman-ai-data-center","claimId":null,"detail":"Duplicate campus record khazna-data-centers-khazna-ajman-ai-campus merged into this one (dc-merge-2026-11-17)","occurredAt":"2026-11-18T02:52:56.157Z","createdAt":"2026-11-18T02:52:56.157Z"},{"id":"129874dd-e49f-4899-8621-948e9f15241f","dataCenterId":"aca9b61a-c103-4846-824b-97b2eebbb858","eventType":"capacity_changed","series":"under_construction","oldValue":null,"newValue":"0.1","claimId":"ea247de7-c395-448c-9394-f181fd6b5471","detail":null,"occurredAt":"2026-08-19T01:33:17.531Z","createdAt":"2026-08-19T01:33:17.531Z"},{"id":"029849ef-5461-43fe-9d45-ba950cb5240b","dataCenterId":"aca9b61a-c103-4846-824b-97b2eebbb858","eventType":"claim_recorded","series":"under_construction","oldValue":null,"newValue":"0.1","claimId":"ea247de7-c395-448c-9394-f181fd6b5471","detail":"verified · press_release","occurredAt":"2026-08-19T01:33:17.376Z","createdAt":"2026-08-19T01:33:17.376Z"},{"id":"a69b2ce6-9021-4e43-a113-a10ea0b4a547","dataCenterId":"aca9b61a-c103-4846-824b-97b2eebbb858","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"construction: Laing O'Rourke","occurredAt":"2026-08-19T00:49:09.356Z","createdAt":"2026-08-19T00:49:09.356Z"},{"id":"d23be73f-60ba-4c74-ad20-1d3cb964c401","dataCenterId":"aca9b61a-c103-4846-824b-97b2eebbb858","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: Etihad Water and Electricity Company (EtihadWE)","occurredAt":"2026-08-19T00:49:08.210Z","createdAt":"2026-08-19T00:49:08.210Z"},{"id":"2c4c6147-6db9-4c4c-aebe-c2b37ee9a84e","dataCenterId":"aca9b61a-c103-4846-824b-97b2eebbb858","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"tenant: b8670b58-67f2-4b87-9b46-9e16588dc1e6","occurredAt":"2026-08-19T00:49:07.071Z","createdAt":"2026-08-19T00:49:07.071Z"},{"id":"4ac40dc3-4a9d-42a3-8268-3f53afe7ee98","dataCenterId":"aca9b61a-c103-4846-824b-97b2eebbb858","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"operator: Khazna Data Centers","occurredAt":"2026-08-19T00:49:05.931Z","createdAt":"2026-08-19T00:49:05.931Z"},{"id":"8c67a08c-aa67-4353-8e48-181e145636c8","dataCenterId":"aca9b61a-c103-4846-824b-97b2eebbb858","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: Khazna Data Centers","occurredAt":"2026-08-19T00:49:04.775Z","createdAt":"2026-08-19T00:49:04.775Z"},{"id":"a3a53d94-5185-45ff-bb3a-997eb3800e70","dataCenterId":"aca9b61a-c103-4846-824b-97b2eebbb858","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"0.1","claimId":"7bd99528-db3d-4b06-be6e-6d246fd18528","detail":null,"occurredAt":"2026-08-19T00:49:03.393Z","createdAt":"2026-08-19T00:49:03.393Z"},{"id":"17d56067-ab5d-4e53-8eaf-311f772019fc","dataCenterId":"aca9b61a-c103-4846-824b-97b2eebbb858","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"0.1","claimId":"7bd99528-db3d-4b06-be6e-6d246fd18528","detail":"reported · press_release","occurredAt":"2026-08-19T00:49:03.238Z","createdAt":"2026-08-19T00:49:03.238Z"},{"id":"cd77714a-cfc3-4710-b9b4-c2f75b5378fb","dataCenterId":"aca9b61a-c103-4846-824b-97b2eebbb858","eventType":"energization_date_changed","series":null,"oldValue":"2025-07-01|quarter","newValue":"2026-12-01|month","claimId":null,"detail":"Earlier: \"Q3 2025\" (ThePrint, 2024-10-16) https://theprint.in/world/uae-khazna-to-build-mena-regions-first-ai-optimised-data-center-in-ajman/2315124. Later: \"December 2026\" (MEED, 2025-04-22) https://guest.meed.com/khazna-breaks-ground-on-new-uae-data-centre-projects","occurredAt":"2025-04-22T00:00:00.000Z","createdAt":"2026-11-18T03:34:49.676Z"}],"capacity_picture":{"announced_gw":0.1,"contracted_gw":null,"under_construction_gw":0.1,"energized_gw":null,"announced_minus_energized_gw":0.1,"by_series":{"announced":{"valueGw":0.1,"asOf":"2024-10-01T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://www.g42.ai/resources/news/khazna-announces-uaes-first-ai-optimized-data-center-and-largest-its-portfolio"},"contracted":null,"under_construction":{"valueGw":0.1,"asOf":"2024-10-01T00:00:00.000Z","evidenceTier":"verified","sourceUrl":"https://www.g42.ai/resources/news/khazna-announces-uaes-first-ai-optimized-data-center-and-largest-its-portfolio"},"energized":null}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Khazna QAJ1 Ajman AI-Optimized Data Center","url":"https://registry.deploy.report/datacenters/khazna-qaj1-ajman-ai-data-center","address":{"@type":"PostalAddress","addressLocality":"Ajman"}}}