{"id":"a91b1386-c93a-4a94-b298-767521f80726","slug":"lancium-fort-stockton-clean-campus-texas","name":"Lancium Fort Stockton Clean Campus","aliases":["Fort Stockton Clean Campus","Lancium Pecos County"],"locationId":"ae3cd15c-df05-435c-8296-4bcacf2b37b6","lat":30.904473,"lng":-102.9177867,"locationPrecision":"exact","landStatus":"greenfield","lifecycleState":"partially_energized","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"ERCOT","waterSourceNotes":"Closed-loop, non-evaporative liquid cooling that recirculates a sealed water volume; once filled it requires no additional water for the life of the project.","servingUtility":null,"acreage":110,"totalBuildingSqft":null,"streetAddress":null,"notes":"Lancium's first Clean Campus in Pecos County, distinct from its Abilene campus. Designed for up to 325 MW of flexible/controllable load co-located with West Texas renewable oversupply; an initial ~25 MW stage energized and substations built out for expansion. ERCOT designated the site a Controllable Load Resource (Nov 2022) using Lancium Smart Response, a grid/ancillary-services signal. Current energized MW versus the 325 MW target and the AI-tenant mix are not fully disclosed.","keyFacts":[{"label":"Groundbreaking / 325 MW plan / first 25 MW stage (primary)","value":"On Sep 15, 2021, Lancium announced groundbreaking on its first Clean Campus in Fort Stockton, Texas, stating initial use would be a 100,000+ sq ft facility for Bitcoin mining and other high-throughput computing, with first 25 MW stage targeted for Q1 2022 and full capacity of 325 MW by year-end 2022 (company target at announcement; later energized MW vs that target is not restated in the CLR release) ([Lancium / PR Newswire, Sep 15 2021](https://www.prnewswire.com/news-releases/lancium-breaks-ground-on-first-clean-campus-in-fort-stockton-texas-301377974.html))","sourceUrl":"https://www.prnewswire.com/news-releases/lancium-breaks-ground-on-first-clean-campus-in-fort-stockton-texas-301377974.html"},{"label":"Controllable Load Resource design (primary)","value":"The groundbreaking release frames Clean Campuses as sited at transmission points often overwhelmed with renewable energy and enabled by Lancium Smart Response to act as Controllable Load Resources (CLRs) that can absorb renewable oversupply and provide grid reliability products usually associated with fossil plants ([Lancium / PR Newswire, Sep 15 2021](https://www.prnewswire.com/news-releases/lancium-breaks-ground-on-first-clean-campus-in-fort-stockton-texas-301377974.html))","sourceUrl":"https://www.prnewswire.com/news-releases/lancium-breaks-ground-on-first-clean-campus-in-fort-stockton-texas-301377974.html"},{"label":"ERCOT CLR qualification Nov 2022 (primary)","value":"On Nov 2, 2022, Lancium announced ERCOT had qualified the Fort Stockton Clean Campus as a Controllable Load Resource, stating CLRs can adjust load up or down within seconds as directed by ERCOT and must proportionally respond to grid needs rather than simply shutting off. The release says Lancium used Smart Response during summer 2022 peak-demand days to dynamically adjust Fort Stockton usage, and notes Lancium had previously qualified the first datacenter CLR in ERCOT in June 2020 ([Lancium / PR Newswire, Nov 2 2022](https://www.prnewswire.com/news-releases/lanciums-fort-stockton-facility-qualifies-as-ercot-controllable-load-resource-301666370.html))","sourceUrl":"https://www.prnewswire.com/news-releases/lanciums-fort-stockton-facility-qualifies-as-ercot-controllable-load-resource-301666370.html"}],"reviewStatus":"reviewed","sources":[{"url":"https://www.prnewswire.com/news-releases/lancium-breaks-ground-on-first-clean-campus-in-fort-stockton-texas-301377974.html","date":"2021-09-14","title":"Lancium Breaks Ground On First Clean Campus In Fort Stockton, Texas","publisher":"Lancium / PR Newswire"},{"url":"https://www.gem.wiki/Fort_Stockton_Clean_Campus","date":"2024-01-01","title":"Fort Stockton Clean Campus","publisher":"Global Energy Monitor"},{"url":"https://www.datacentermap.com/usa/texas/fort-stockton/fort-stockton-clean-campus/","date":"2024-01-01","title":"Fort Stockton Clean Campus Data Center (325 MW)","publisher":"Data Center Map"},{"url":"https://lancium.com/locations/","title":"Lancium Locations","sourceName":"Lancium"},{"url":"https://www.prnewswire.com/news-releases/lanciums-fort-stockton-facility-qualifies-as-ercot-controllable-load-resource-301666370.html","date":"2022-11-02","title":"Lancium's Fort Stockton Facility Qualifies as ERCOT Controllable Load Resource","publisher":"Lancium / PR Newswire"}],"reviewNote":null,"createdAt":"2026-08-17T20:23:18.896Z","updatedAt":"2026-09-29T04:42:44.835Z","location":{"id":"ae3cd15c-df05-435c-8296-4bcacf2b37b6","name":"Fort Stockton","slug":"fort-stockton-texas","kind":"city","parentLocationId":"45f67762-10f4-4255-be84-45c73efe25f9","region":"West Coast","lat":30.891901,"lng":-102.883662,"reviewStatus":"reviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-17T18:20:54.166Z","updatedAt":"2026-08-21T03:20:12.226Z"},"parties":[{"id":"68956daf-4276-4cbe-adff-2a9c13937ccd","dataCenterId":"a91b1386-c93a-4a94-b298-767521f80726","companyId":null,"externalName":"Lancium","role":"operator","structureNotes":"Blackstone-backed (~$500M investment reported)","createdAt":"2026-08-17T20:23:20.521Z","company":null},{"id":"acec4e6d-f3e3-41ac-957f-0ea46d92eb0a","dataCenterId":"a91b1386-c93a-4a94-b298-767521f80726","companyId":null,"externalName":"ERCOT","role":"utility","structureNotes":"Controllable Load Resource designation Nov 2022","createdAt":"2026-08-17T20:23:21.275Z","company":null},{"id":"13f60a07-23c4-4ec0-aee0-003a7dfe92df","dataCenterId":"a91b1386-c93a-4a94-b298-767521f80726","companyId":null,"externalName":"Broad Reach Power","role":"utility","structureNotes":"Retail energy supplier and qualified scheduling entity (QSE) for a portion of the Fort Stockton Clean Campus; also battery-storage arrangement. Broad Reach holds a ~21 GW wind/solar/storage portfolio. Per lancium.com/2022/07/07 partnership announcement.","createdAt":"2026-08-19T00:16:11.106Z","company":null}],"capacityClaims":[{"id":"736a8142-3992-4e1b-b15c-e1d8d11ff56e","dataCenterId":"a91b1386-c93a-4a94-b298-767521f80726","series":"announced","valueGw":0.325,"asOf":"2021-09-15T00:00:00.000Z","sourceUrl":"https://www.prnewswire.com/news-releases/lancium-breaks-ground-on-first-clean-campus-in-fort-stockton-texas-301377974.html","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"325 MW full capacity. Original claimant Lancium own groundbreaking release 2021-09-15.","createdAt":"2026-08-17T20:23:19.598Z"},{"id":"7ea4c2b8-e6bb-49af-89d4-642abcbe58ba","dataCenterId":"a91b1386-c93a-4a94-b298-767521f80726","series":"energized","valueGw":0.025,"asOf":"2024-06-01T00:00:00.000Z","sourceUrl":"https://www.gem.wiki/Fort_Stockton_Clean_Campus","sourceType":"tracker","evidenceTier":"claimed","supersedesId":null,"note":"GEM describes a 25 MW operating Bitcoin mining / data processing center on grid-powered substation; full 325 MW expansion not confirmed as built.","createdAt":"2026-08-19T00:16:09.755Z"}],"financialClaims":[],"metricClaims":[{"id":"59e570a0-d11f-453c-a68e-9c9100f0e73d","dataCenterId":"a91b1386-c93a-4a94-b298-767521f80726","metricType":"jobs_permanent","valueNumeric":null,"valueText":"dozens of local high-paying jobs (company estimate, not itemized)","unit":null,"grantingJurisdiction":null,"asOf":"2021-06-01T00:00:00.000Z","sourceUrl":"https://www.prnewswire.com/news-releases/lancium-breaks-ground-on-first-clean-campus-in-fort-stockton-texas-301377974.html","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":null,"createdAt":"2026-08-19T00:16:10.289Z"}],"powerProjects":[{"id":"c7a57ea4-3273-4338-b1cb-a9937d5bceae","dataCenterId":"a91b1386-c93a-4a94-b298-767521f80726","name":"ERCOT grid interconnection (Controllable Load Resource)","type":"grid_interconnect","capacityGw":0.325,"lifecycleState":"partially_energized","sourceUrl":"https://www.gem.wiki/Fort_Stockton_Clean_Campus","evidenceTier":"reported","note":"Lancium Smart Response demand-flexibility; designated CLR by ERCOT","createdAt":"2026-08-17T20:23:20.134Z"}],"facilities":[],"incidents":[],"events":[{"id":"1ed38307-e0de-4315-8e1f-9c1b3b3e0453","dataCenterId":"a91b1386-c93a-4a94-b298-767521f80726","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: Broad Reach Power","occurredAt":"2026-08-19T00:16:11.487Z","createdAt":"2026-08-19T00:16:11.487Z"},{"id":"53211606-a534-43b3-97e4-ae131c88b013","dataCenterId":"a91b1386-c93a-4a94-b298-767521f80726","eventType":"capacity_changed","series":"energized","oldValue":null,"newValue":"0.025","claimId":"7ea4c2b8-e6bb-49af-89d4-642abcbe58ba","detail":null,"occurredAt":"2026-08-19T00:16:10.058Z","createdAt":"2026-08-19T00:16:10.058Z"},{"id":"ee9fc91c-cc81-4fe3-9e8d-2c6467a0b716","dataCenterId":"a91b1386-c93a-4a94-b298-767521f80726","eventType":"claim_recorded","series":"energized","oldValue":null,"newValue":"0.025","claimId":"7ea4c2b8-e6bb-49af-89d4-642abcbe58ba","detail":"claimed · tracker","occurredAt":"2026-08-19T00:16:09.906Z","createdAt":"2026-08-19T00:16:09.906Z"},{"id":"9b0191f2-dca0-45cc-93d8-7b0ee7e09f70","dataCenterId":"a91b1386-c93a-4a94-b298-767521f80726","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: ERCOT","occurredAt":"2026-08-17T20:23:21.652Z","createdAt":"2026-08-17T20:23:21.652Z"},{"id":"252463a7-63e8-423a-bac3-ed3db9de2e53","dataCenterId":"a91b1386-c93a-4a94-b298-767521f80726","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"operator: Lancium","occurredAt":"2026-08-17T20:23:20.897Z","createdAt":"2026-08-17T20:23:20.897Z"},{"id":"13cee46d-9473-47ca-a8b9-0086579e5a27","dataCenterId":"a91b1386-c93a-4a94-b298-767521f80726","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"0.325","claimId":"736a8142-3992-4e1b-b15c-e1d8d11ff56e","detail":null,"occurredAt":"2026-08-17T20:23:19.902Z","createdAt":"2026-08-17T20:23:19.902Z"},{"id":"27561a93-5a70-43ee-adf5-e5de47a38106","dataCenterId":"a91b1386-c93a-4a94-b298-767521f80726","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"0.325","claimId":"736a8142-3992-4e1b-b15c-e1d8d11ff56e","detail":"reported · utility_filing","occurredAt":"2026-08-17T20:23:19.751Z","createdAt":"2026-08-17T20:23:19.751Z"}],"capacity_picture":{"announced_gw":0.325,"contracted_gw":null,"under_construction_gw":null,"energized_gw":0.025,"announced_minus_energized_gw":0.3,"by_series":{"announced":{"valueGw":0.325,"asOf":"2021-09-15T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://www.prnewswire.com/news-releases/lancium-breaks-ground-on-first-clean-campus-in-fort-stockton-texas-301377974.html"},"contracted":null,"under_construction":null,"energized":{"valueGw":0.025,"asOf":"2024-06-01T00:00:00.000Z","evidenceTier":"claimed","sourceUrl":"https://www.gem.wiki/Fort_Stockton_Clean_Campus"}}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Lancium Fort Stockton Clean Campus","url":"https://registry.deploy.report/datacenters/lancium-fort-stockton-clean-campus-texas","geo":{"@type":"GeoCoordinates","latitude":30.904473,"longitude":-102.9177867},"address":{"@type":"PostalAddress","addressLocality":"Fort Stockton"}}}