{"id":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","slug":"meta-blackrock-el-paso-texas","name":"Meta / BlackRock El Paso AI Data Center Campus","aliases":["Meta El Paso","Meta BlackRock El Paso venture"],"locationId":"50941799-df9d-424b-9bcb-ac459d1e38cc","lat":31.9868637,"lng":-106.3919548,"locationPrecision":null,"landStatus":"private","lifecycleState":"under_construction","powerSourceMix":"mixed","interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":"2028-01-01T00:00:00.000Z","expectedEnergizationPrecision":"year","expectedEnergizationMilestone":"first_power","dedicatedSubstation":null,"gridOperator":"WECC","waterSourceNotes":null,"servingUtility":null,"acreage":1039,"totalBuildingSqft":null,"streetAddress":null,"notes":"1 GW AI compute campus (~4M sq ft on ~1,039 acres) that Meta is building and then contributed into an 80/20 JV with BlackRock. Power is grid from El Paso Electric (WECC, not ERCOT) up to 1.0 GW plus a proposed dedicated ~366 MW on-site natural gas plant. Capacity is planned to begin coming online in 2028; nothing is energized yet. Exact site coordinates not disclosed in primary sources.","keyFacts":[{"label":"Capacity (company-claimed)","value":"1 GW, under construction; capacity online from 2028; Meta sole occupant"},{"label":"Ownership","value":"BlackRock funds 80%; Meta 20%"},{"label":"Development cost (company-claimed)","value":"About $14B"},{"label":"Lease (company-claimed)","value":"Meta leases the whole campus: four-year term plus options up to about 20 years"},{"label":"Jobs (company-claimed)","value":"4,000+ construction jobs at peak; 300 operational"},{"label":"Grid","value":"El Paso Electric, WECC (not ERCOT)"},{"label":"Gas plant ruling (state judges, Sep 2026)","value":"PUCT judges said El Paso Electric's 366 MW McCloud gas plant for the campus should be approved only if other customers never pay its costs. Commission order expected by Dec 7 2026."}],"reviewStatus":"reviewed","sources":[{"url":"https://about.fb.com/news/2026/07/meta-announces-new-venture-with-blackrock-to-develop-data-center-in-el-paso/","title":"Meta Announces New Strategic Venture with BlackRock to Develop Data Center in El Paso"},{"url":"https://www.cnbc.com/2026/07/28/meta-blackrock-partner-on-14-billion-el-paso-data-center.html","title":"Meta, BlackRock partner on $14 billion El Paso data center venture"},{"url":"https://www.cnbc.com/2026/03/26/meta-to-spend-10-billion-on-ai-data-center-in-el-paso-1gw-by-2028.html","title":"Meta to spend $10 billion on AI data center in El Paso, 1GW by 2028"},{"url":"https://w.media/meta-hands-blackrock-majority-stake-in-1-gw-el-paso-data-center/","title":"Meta hands BlackRock majority stake in 1 GW El Paso data center"},{"url":"https://kvia.com/news/2026/09/28/city-council-authorizes-ongoing-negotiations-to-protect-ratepayers-from-meta-data-center-energy-facility/","title":"City Council authorizes ongoing negotiations to protect ratepayers from Meta data center energy facility","sourceName":"KVIA","publishedAt":"2026-09-28"},{"url":"https://insideclimatenews.org/news/24092026/el-paso-electric-only-considered-gas-to-power-meta-data-center/","title":"Texas Electric Utility Only Considered Gas to Power $10 Billion Meta Data Center","sourceName":"Inside Climate News","publishedAt":"2026-09-24"},{"url":"https://techinformed.com/meta-to-build-1-5-billion-ai-data-center-in-el-paso/","title":"Meta to build $1.5 billion AI data center in El Paso","sourceName":"TechInformed","publishedAt":"2025-10-16"}],"reviewNote":null,"createdAt":"2026-08-17T18:20:32.848Z","updatedAt":"2026-11-18T03:25:29.518Z","location":{"id":"50941799-df9d-424b-9bcb-ac459d1e38cc","name":"El Paso","slug":"el-paso-texas","kind":"city","parentLocationId":"45f67762-10f4-4255-be84-45c73efe25f9","region":"Texas","lat":31.7601001,"lng":-106.4870476,"reviewStatus":"reviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-17T18:20:32.398Z","updatedAt":"2026-08-21T18:03:12.185Z"},"parties":[{"id":"01de686d-71e2-4392-a118-71da80bed980","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","companyId":null,"externalName":"BlackRock (managed funds)","role":"financier","structureNotes":"Owns 80% of the venture; ~$4.9B cash contribution plus $12.5B debt financing","createdAt":"2026-08-17T18:20:40.816Z","company":null},{"id":"663ab0a6-705d-40b8-be99-cbadfc1d1483","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","companyId":null,"externalName":"El Paso Electric","role":"utility","structureNotes":"Grid supplier, up to 1.0 GW (WECC region)","createdAt":"2026-08-17T18:20:41.852Z","company":null},{"id":"e5654d58-1029-4a33-9906-993730615249","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","companyId":"303ca7c0-45ce-4503-97e7-d5e0d5adb2bb","externalName":"Meta Platforms","role":"developer","structureNotes":"Built the campus; retains 20% of the venture and leases capacity back (4-year initial term, up to ~20 years)","createdAt":"2026-08-17T18:20:39.765Z","company":{"id":"303ca7c0-45ce-4503-97e7-d5e0d5adb2bb","name":"Meta","slug":"meta"}},{"id":"a9c24b1f-55aa-4651-96c4-3bd59086d3fa","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","companyId":null,"externalName":"Global Infrastructure Partners (GIP)","role":"financier","structureNotes":"BlackRock unit; part of the 80% JV capital","createdAt":"2026-08-19T01:34:03.609Z","company":null},{"id":"b33ecbee-5e09-4f1a-a8ab-f885befb6e68","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","companyId":null,"externalName":"HPS Investment Partners","role":"financier","structureNotes":"BlackRock unit; part of the JV financing","createdAt":"2026-08-19T01:34:04.842Z","company":null}],"capacityClaims":[{"id":"fa688b42-12c7-4f10-91a6-bccdaddc4444","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","series":"announced","valueGw":1,"asOf":"2026-07-28T00:00:00.000Z","sourceUrl":"https://about.fb.com/news/2026/07/meta-announces-new-venture-with-blackrock-to-develop-data-center-in-el-paso/","sourceType":"press_release","evidenceTier":"verified","supersedesId":null,"note":"Official Meta figure: 1 gigawatt of compute capacity","createdAt":"2026-08-17T18:20:33.600Z"},{"id":"aff560af-4fc5-42af-928e-c8d0dd301fbc","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","series":"contracted","valueGw":1,"asOf":"2026-07-28T00:00:00.000Z","sourceUrl":"https://cryptobriefing.com/meta-el-paso-data-center-1gw/","sourceType":"utility_filing","evidenceTier":"reported","supersedesId":null,"note":"El Paso Electric contracted to deliver up to 1.0 GW, with right to request up to 1.4 GW","createdAt":"2026-08-17T18:20:34.727Z"},{"id":"bcf15300-b746-4e2d-9424-298bd1191511","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","series":"energized","valueGw":0,"asOf":"2026-07-28T00:00:00.000Z","sourceUrl":"https://about.fb.com/news/2026/07/meta-announces-new-venture-with-blackrock-to-develop-data-center-in-el-paso/","sourceType":"press_release","evidenceTier":"verified","supersedesId":null,"note":"Capacity expected to begin coming online in 2028; none energized as of announcement","createdAt":"2026-08-17T18:20:35.704Z"}],"financialClaims":[{"id":"faef6b4a-5240-44ab-a438-9a6db489312c","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","kind":"investment","label":"Meta construction and development investment","valueUsd":"10000000000","capUsd":null,"conditions":"Over $10B","asOf":"2026-07-28T00:00:00.000Z","sourceUrl":"https://about.fb.com/news/2026/07/meta-announces-new-venture-with-blackrock-to-develop-data-center-in-el-paso/","sourceType":"press_release","evidenceTier":"verified","createdAt":"2026-08-17T18:20:37.038Z"},{"id":"c6d6c052-7e22-44a0-ad87-5d00968cc6c9","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","kind":"capex","label":"Total venture development cost","valueUsd":"14000000000","capUsd":null,"conditions":"Approximately $14B for buildings and infrastructure","asOf":"2026-07-28T00:00:00.000Z","sourceUrl":"https://about.fb.com/news/2026/07/meta-announces-new-venture-with-blackrock-to-develop-data-center-in-el-paso/","sourceType":"press_release","evidenceTier":"verified","createdAt":"2026-08-17T18:20:37.897Z"},{"id":"0367172b-cf0b-4a38-9f2d-ce0710d9fdcb","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","kind":"equity","label":"BlackRock cash contribution at close","valueUsd":"4900000000","capUsd":null,"conditions":"80% JV interest; funded partly by $12.5B debt financing","asOf":"2026-07-28T00:00:00.000Z","sourceUrl":"https://about.fb.com/news/2026/07/meta-announces-new-venture-with-blackrock-to-develop-data-center-in-el-paso/","sourceType":"press_release","evidenceTier":"verified","createdAt":"2026-08-17T18:20:38.811Z"},{"id":"1a4d3882-05ef-4f8d-8201-93225465603b","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","kind":"capex","label":"Senior secured notes (Sopaipilla Investor LLC)","valueUsd":"12500000000","capUsd":null,"conditions":"~$12.5B of senior secured notes priced 2026-07-27 to fund the project","asOf":"2026-07-27T00:00:00.000Z","sourceUrl":"https://pulse2.com/meta-and-blackrock-form-14-billion-venture-to-develop-el-paso-ai-data-center-campus/","sourceType":"journalist_report","evidenceTier":"reported","createdAt":"2026-08-19T01:34:00.888Z"},{"id":"03d6173a-f50d-4fc6-9906-9bc37eaef32c","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","kind":"capex","label":"BlackRock cash contribution to JV","valueUsd":"4900000000","capUsd":null,"conditions":"BlackRock (with GIP and HPS) contributes ~$4.9B cash; Meta contributes ~$2.3B in land and construction-in-progress and receives a one-time $1B distribution","asOf":"2026-07-01T00:00:00.000Z","sourceUrl":"https://pulse2.com/meta-and-blackrock-form-14-billion-venture-to-develop-el-paso-ai-data-center-campus/","sourceType":"journalist_report","evidenceTier":"reported","createdAt":"2026-08-19T01:34:01.668Z"},{"id":"8c54a76a-f353-4923-96be-6baafa241573","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","kind":"capex","label":"Land purchase (1,039 acres from City of El Paso)","valueUsd":"8500000","capUsd":null,"conditions":"Meta bought 1,039 acres of vacant land in far Northeast El Paso from the city for $8.5M","asOf":"2023-12-29T00:00:00.000Z","sourceUrl":"https://www.aol.com/meta-completes-8-5m-purchase-132609504.html","sourceType":"journalist_report","evidenceTier":"reported","createdAt":"2026-08-19T01:34:02.426Z"}],"metricClaims":[{"id":"d63f431b-d9c8-41f9-ae36-7cdcb6b84429","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","metricType":"capex_usd","valueNumeric":10000000000,"valueText":null,"unit":null,"grantingJurisdiction":null,"asOf":"2026-01-01T00:00:00.000Z","sourceUrl":"https://datacenters.atmeta.com/asset/el-paso-data-center-info-sheet/","sourceType":"operator_page","evidenceTier":"reported","supersedesId":null,"note":"migrated from Tier2 facility meta-texas-el-paso","createdAt":"2026-08-18T13:51:56.156Z"},{"id":"76b65d3b-b7fc-4c1a-8422-10cb90329e0e","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","metricType":"jobs_construction","valueNumeric":4000,"valueText":null,"unit":null,"grantingJurisdiction":null,"asOf":"2026-01-01T00:00:00.000Z","sourceUrl":"https://datacenters.atmeta.com/asset/el-paso-data-center-info-sheet/","sourceType":"operator_page","evidenceTier":"reported","supersedesId":null,"note":"migrated from Tier2 facility meta-texas-el-paso","createdAt":"2026-08-18T13:51:56.923Z"},{"id":"ff6e8d58-a6d4-4af1-ac33-79bb0bba2ba9","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","metricType":"jobs_permanent","valueNumeric":300,"valueText":null,"unit":null,"grantingJurisdiction":null,"asOf":"2026-01-01T00:00:00.000Z","sourceUrl":"https://datacenters.atmeta.com/asset/el-paso-data-center-info-sheet/","sourceType":"operator_page","evidenceTier":"reported","supersedesId":null,"note":"migrated from Tier2 facility meta-texas-el-paso","createdAt":"2026-08-18T13:51:57.779Z"}],"powerProjects":[{"id":"e367a134-76b9-4a1f-aadc-8550768d1fe4","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","name":"El Paso Electric grid supply","type":"grid_interconnect","capacityGw":1,"lifecycleState":"announced","sourceUrl":"https://cryptobriefing.com/meta-el-paso-data-center-1gw/","evidenceTier":"reported","note":"Up to 1.0 GW committed, right to request up to 1.4 GW; El Paso Electric is a WECC utility","createdAt":"2026-08-17T18:20:36.264Z"},{"id":"cffa2d98-731c-4ff2-ab6e-1a7e48750ddb","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","name":"Proposed on-site natural gas plant","type":"gas","capacityGw":0.366,"lifecycleState":"announced","sourceUrl":"https://cryptobriefing.com/meta-el-paso-data-center-1gw/","evidenceTier":"reported","note":"Meta-proposed dedicated ~366 MW gas plant","createdAt":"2026-08-17T18:20:36.649Z"}],"permits":[{"id":"48c4ea32-3b2a-4bf4-a96c-4eedc128df22","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","agency":"TCEQ","jurisdiction":"Texas","kind":"air","permitType":"Air registration (standard permit or permit by rule)","number":"181733","applicant":"Enchanted Rock, LLC","status":"active","filedDate":null,"decidedDate":"2025-10-22T00:00:00.000Z","docket":null,"regulatedEntityId":"RN112295597","sourceUrl":"https://www15.tceq.texas.gov/crpub/index.cfm?fuseaction=iwr.viewAddnDetail&addn_id=593469372025275&rn=RN112295597&return=regent&re_id=588469362025275","reviewStatus":"reviewed","reviewNote":"Campus link confirmed 2026-11-18: TCEQ lists this air registration at EL PASO DATACENTER - EGUS, a gas power site owned and operated by Enchanted Rock off State Line Drive in northeast El Paso, where the Meta campus sits. Enchanted Rock builds and runs the gas plant that serves the campus. https://baxtel.com/campus/meta-el-paso-campus \"Until those lines are in service, the utility plans a 366 MW natural-gas plant beside the campus, built and run by Enchanted Rock.\"","lastCheckedAt":"2026-11-17T21:27:16.770Z","createdAt":"2026-11-17T21:14:07.425Z","updatedAt":"2026-11-18T18:51:14.890Z"},{"id":"4d1283ff-a327-4b14-ba80-2cec93af86bc","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","agency":"TCEQ","jurisdiction":"Texas","kind":"stormwater","permitType":"Construction stormwater authorization","number":"TXR1523YV","applicant":"Enchanted Rock, LLC","status":"active","filedDate":null,"decidedDate":null,"docket":null,"regulatedEntityId":"RN112488143","sourceUrl":"https://www15.tceq.texas.gov/crpub/index.cfm?fuseaction=iwr.viewAddnDetail&addn_id=718711092026194&rn=RN112488143&return=regent&re_id=713711082026194","reviewStatus":"reviewed","reviewNote":"Campus link confirmed 2026-11-18: TCEQ lists this permit at MCCLOUD POWER STATION, operated by Enchanted Rock off Gateway N. Blvd. and State Line Dr. The McCloud plant is the gas plant beside the Meta campus that Enchanted Rock builds and runs for it. https://baxtel.com/campus/meta-el-paso-campus \"Until those lines are in service, the utility plans a 366 MW natural-gas plant beside the campus, built and run by Enchanted Rock.\"","lastCheckedAt":"2026-11-17T21:27:16.770Z","createdAt":"2026-11-17T21:14:07.806Z","updatedAt":"2026-11-18T18:51:15.270Z"}],"facilities":[{"slug":"meta-el-paso-campus-tx","name":"Meta El Paso Campus","status":"under_construction","criticalItMw":null,"facilityType":"hyperscale"},{"slug":"meta-el-paso-tx-campus","name":"El Paso Data Center Campus","status":"under_construction","criticalItMw":1000,"facilityType":"hyperscale"},{"slug":"meta-el-paso-tx","name":"Meta El Paso Data Center","status":"under_construction","criticalItMw":1000,"facilityType":"hyperscale"}],"incidents":[],"events":[{"id":"4c3a5adc-14da-46fc-a20f-852c5c1c6a9f","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","eventType":"energization_date_changed","series":null,"oldValue":null,"newValue":"2028-01-01|year","claimId":null,"detail":"intake proposal 34dfda67-9d9a-4477-bdc8-c5b3a6245ef1","occurredAt":"2026-11-18T03:25:30.114Z","createdAt":"2026-11-18T03:25:30.114Z"},{"id":"9b324a85-0707-4752-b3b5-1342f4db91e6","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","eventType":"permit_recorded","series":null,"oldValue":null,"newValue":"TCEQ TXR1523YV: active","claimId":null,"detail":"Construction stormwater authorization TXR1523YV recorded from https://www15.tceq.texas.gov/crpub/index.cfm?fuseaction=iwr.viewAddnDetail&addn_id=718711092026194&rn=RN112488143&return=regent&re_id=713711082026194","occurredAt":"2026-11-17T21:14:07.961Z","createdAt":"2026-11-17T21:14:07.961Z"},{"id":"50bb828f-56bd-49b4-9951-4a12a362a7c0","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","eventType":"permit_recorded","series":null,"oldValue":null,"newValue":"TCEQ 181733: active","claimId":null,"detail":"Air registration (standard permit or permit by rule) 181733 recorded from https://www15.tceq.texas.gov/crpub/index.cfm?fuseaction=iwr.viewAddnDetail&addn_id=593469372025275&rn=RN112295597&return=regent&re_id=588469362025275","occurredAt":"2026-11-17T21:14:07.650Z","createdAt":"2026-11-17T21:14:07.650Z"},{"id":"ac40180f-9aa7-496a-987c-625c4bdaf3a3","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"financier: HPS Investment Partners","occurredAt":"2026-08-19T01:34:05.224Z","createdAt":"2026-08-19T01:34:05.224Z"},{"id":"e6cd1c3a-1015-4bc7-9ce4-d68850a9731a","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"financier: Global Infrastructure Partners (GIP)","occurredAt":"2026-08-19T01:34:03.995Z","createdAt":"2026-08-19T01:34:03.995Z"},{"id":"c8078e83-300d-4cbe-af7d-148ce444780c","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: Land purchase (1,039 acres from City of El Paso)","occurredAt":"2026-08-19T01:34:02.807Z","createdAt":"2026-08-19T01:34:02.807Z"},{"id":"a373100c-1e9e-42f1-bf30-88860ede3b2f","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: BlackRock cash contribution to JV","occurredAt":"2026-08-19T01:34:02.049Z","createdAt":"2026-08-19T01:34:02.049Z"},{"id":"280a2ac0-de89-4e9c-9cf1-7bde8dd3ef59","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: Senior secured notes (Sopaipilla Investor LLC)","occurredAt":"2026-08-19T01:34:01.285Z","createdAt":"2026-08-19T01:34:01.285Z"},{"id":"b61438ce-919d-4b99-99f5-d17c9adaa8bc","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: El Paso Electric","occurredAt":"2026-08-17T18:20:42.307Z","createdAt":"2026-08-17T18:20:42.307Z"},{"id":"e3fa4782-2054-4403-8811-b5892562b665","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"financier: BlackRock (managed funds)","occurredAt":"2026-08-17T18:20:41.373Z","createdAt":"2026-08-17T18:20:41.373Z"},{"id":"089ee6dc-7428-4a76-8244-1f54f842d364","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: Meta Platforms","occurredAt":"2026-08-17T18:20:40.338Z","createdAt":"2026-08-17T18:20:40.338Z"},{"id":"0af6356a-883e-414e-b7b2-f55badcd1e4d","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"equity: BlackRock cash contribution at close","occurredAt":"2026-08-17T18:20:39.288Z","createdAt":"2026-08-17T18:20:39.288Z"},{"id":"d574a927-df48-4cf7-b85a-0e3300156eaf","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: Total venture development cost","occurredAt":"2026-08-17T18:20:38.353Z","createdAt":"2026-08-17T18:20:38.353Z"},{"id":"956367fe-c1ee-4b21-9eb1-0fff5df48773","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"investment: Meta construction and development investment","occurredAt":"2026-08-17T18:20:37.482Z","createdAt":"2026-08-17T18:20:37.482Z"},{"id":"73416d1a-8923-4dd4-90b3-0ee26ed8a84d","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","eventType":"capacity_changed","series":"energized","oldValue":null,"newValue":"0","claimId":"bcf15300-b746-4e2d-9424-298bd1191511","detail":null,"occurredAt":"2026-08-17T18:20:36.038Z","createdAt":"2026-08-17T18:20:36.038Z"},{"id":"3999237a-f251-4435-8ada-cc1cc20f4ac8","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","eventType":"claim_recorded","series":"energized","oldValue":null,"newValue":"0","claimId":"bcf15300-b746-4e2d-9424-298bd1191511","detail":"verified · press_release","occurredAt":"2026-08-17T18:20:35.881Z","createdAt":"2026-08-17T18:20:35.881Z"},{"id":"0e89b52a-3715-4d40-b158-64dc26f5653d","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","eventType":"capacity_changed","series":"contracted","oldValue":null,"newValue":"1","claimId":"aff560af-4fc5-42af-928e-c8d0dd301fbc","detail":null,"occurredAt":"2026-08-17T18:20:35.075Z","createdAt":"2026-08-17T18:20:35.075Z"},{"id":"7c6f9643-20fd-47c3-808f-67536f799926","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","eventType":"claim_recorded","series":"contracted","oldValue":null,"newValue":"1","claimId":"aff560af-4fc5-42af-928e-c8d0dd301fbc","detail":"reported · utility_filing","occurredAt":"2026-08-17T18:20:34.910Z","createdAt":"2026-08-17T18:20:34.910Z"},{"id":"908f75e5-d318-4660-b18b-d7abd802b4e1","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"1","claimId":"fa688b42-12c7-4f10-91a6-bccdaddc4444","detail":null,"occurredAt":"2026-08-17T18:20:33.972Z","createdAt":"2026-08-17T18:20:33.972Z"},{"id":"5c5c0d43-7628-42e3-9805-5440f1b122fd","dataCenterId":"cca163a4-35f9-4342-b4fa-2e44ddfbd03a","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"1","claimId":"fa688b42-12c7-4f10-91a6-bccdaddc4444","detail":"verified · press_release","occurredAt":"2026-08-17T18:20:33.756Z","createdAt":"2026-08-17T18:20:33.756Z"}],"capacity_picture":{"announced_gw":1,"contracted_gw":1,"under_construction_gw":null,"energized_gw":0,"announced_minus_energized_gw":1,"by_series":{"announced":{"valueGw":1,"asOf":"2026-07-28T00:00:00.000Z","evidenceTier":"verified","sourceUrl":"https://about.fb.com/news/2026/07/meta-announces-new-venture-with-blackrock-to-develop-data-center-in-el-paso/"},"contracted":{"valueGw":1,"asOf":"2026-07-28T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://cryptobriefing.com/meta-el-paso-data-center-1gw/"},"under_construction":null,"energized":{"valueGw":0,"asOf":"2026-07-28T00:00:00.000Z","evidenceTier":"verified","sourceUrl":"https://about.fb.com/news/2026/07/meta-announces-new-venture-with-blackrock-to-develop-data-center-in-el-paso/"}}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Meta / BlackRock El Paso AI Data Center Campus","url":"https://registry.deploy.report/datacenters/meta-blackrock-el-paso-texas","geo":{"@type":"GeoCoordinates","latitude":31.9868637,"longitude":-106.3919548},"address":{"@type":"PostalAddress","addressLocality":"El Paso"}}}