{"id":"a76e96bd-5e07-444b-ba92-4995dcb78add","slug":"meta-eagle-mountain-utah","name":"Meta Eagle Mountain Data Center Campus","aliases":["Facebook Eagle Mountain","Project Steeplechase"],"locationId":"dd558c03-98e5-4932-b6c1-e579a8a860b1","lat":40.366,"lng":-112.088,"locationPrecision":"exact","landStatus":"greenfield","lifecycleState":"partially_energized","powerSourceMix":"grid","interconnectionQueueStatus":"Grid connected and operating: the campus is served by Rocky Mountain Power and is serving traffic. Meta is bringing more than 800 MW of new solar onto that grid through nine projects across Iron, Tooele and Carbon counties, carrying about $260 million of local investment.","interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"WECC","waterSourceNotes":"Meta funds water restoration equal to 200% of the facility's consumption; in-house designs stated ~80% more water-efficient than industry average.","servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Operational Meta campus (online since 2021) under multi-phase expansion toward a ~4.5M sq ft footprint; ~200 MW currently with a new substation adding up to 1,000 MW of delivery capacity and headroom cited up to 1.8 GW. Powered via Rocky Mountain Power's renewable Schedule 34 tariff plus the Faraday Solar PPA. Meta has not published a firm total contracted MW figure for the full buildout.","keyFacts":[{"label":"Sep 2026 expansion / $3B+ Utah (primary)","value":"On Sep 14, 2026 Meta announced the Eagle Mountain Data Center is growing, increasing Meta's Utah investment to more than $3 billion, supporting more than 1,200 construction workers at peak and more than 300 jobs once completed ([Meta Data Centers, Sep 14 2026](https://datacenters.atmeta.com/2026/09/deepening-our-investment-in-eagle-mountain-utah/))","sourceUrl":"https://datacenters.atmeta.com/2026/09/deepening-our-investment-in-eagle-mountain-utah/"},{"label":"Cooling / water (primary)","value":"For new Eagle Mountain buildings, Meta says it will use a water-efficient closed-loop liquid cooling system with dry cooling, meaning no operational water use in the cooling system (water limited to domestic, fire protection, and equipment maintenance). Meta also cites Hobble Creek and Provo River flow restoration projects restoring more than 726 million gallons of water per year ([Meta Data Centers, Sep 14 2026](https://datacenters.atmeta.com/2026/09/deepening-our-investment-in-eagle-mountain-utah/))","sourceUrl":"https://datacenters.atmeta.com/2026/09/deepening-our-investment-in-eagle-mountain-utah/"},{"label":"Clean energy / Faraday battery (primary)","value":"Meta says Eagle Mountain electricity use is matched with 100% clean and renewable energy, that it has added more than 1.7 GW of clean energy and 600 MWh of battery storage to Utah across 13 sites, and that it is supporting the Faraday Energy Storage project (150 MW battery, Lydian Energy) ([Meta Data Centers, Sep 14 2026](https://datacenters.atmeta.com/2026/09/deepening-our-investment-in-eagle-mountain-utah/))","sourceUrl":"https://datacenters.atmeta.com/2026/09/deepening-our-investment-in-eagle-mountain-utah/"},{"label":"Faraday Solar COD (reported)","value":"Excelsior Energy Capital announced the 685.3 MWDC / 525 MWAC Faraday Solar project in Utah County reached commercial operations on Sep 30, 2025 under a 20-year PacifiCorp Schedule 34 PPA, with Meta purchasing energy and environmental attributes to match Utah operations ([Business Wire / Excelsior](https://www.businesswire.com/news/home/20251030925382/en/Excelsior-Energy-Capital-Brings-Faraday-Solar-Project-Online-in-Utah))","sourceUrl":"https://www.businesswire.com/news/home/20251030925382/en/Excelsior-Energy-Capital-Brings-Faraday-Solar-Project-Online-in-Utah"},{"label":"Online since 2021 (primary)","value":"Meta's July 2021 Data Centers post marked the Utah County / Eagle Mountain campus as online ([Meta Data Centers, July 2021](https://datacenters.atmeta.com/2021/07/utah-county-we-are-online/))","sourceUrl":"https://datacenters.atmeta.com/2021/07/utah-county-we-are-online/"}],"reviewStatus":"reviewed","sources":[{"url":"https://www.deseret.com/utah/2022/9/30/23380151/facebook-meta-announces-expansion-eagle-mountain-data-center-tax-breaks/","date":"2022-09-30","title":"Facebook parent Meta announces mega expansion to Eagle Mountain data center project","publisher":"Deseret News"},{"url":"https://www.heraldextra.com/news/2025/nov/21/rays-of-power-utahs-largest-solar-plant-becomes-operational-set-to-power-eagle-mountain-data-center/","date":"2025-11-21","title":"Utah's largest solar plant becomes operational, set to power Eagle Mountain data center","publisher":"Daily Herald"},{"url":"https://datacenters.atmeta.com/2021/07/utah-county-we-are-online/","title":"Utah County, We Are Online!","sourceName":"Meta Data Centers"},{"url":"https://datacenters.atmeta.com/2026/09/deepening-our-investment-in-eagle-mountain-utah/","date":"2026-09-14","title":"Deepening Our Investment in Eagle Mountain, Utah","publisher":"Meta Data Centers"},{"url":"https://www.businesswire.com/news/home/20251030925382/en/Excelsior-Energy-Capital-Brings-Faraday-Solar-Project-Online-in-Utah","date":"2025-10-30","title":"Excelsior Energy Capital Brings Faraday Solar Project Online in Utah","publisher":"Business Wire"}],"reviewNote":null,"createdAt":"2026-08-17T20:25:17.497Z","updatedAt":"2026-09-28T10:33:49.209Z","location":{"id":"dd558c03-98e5-4932-b6c1-e579a8a860b1","name":"Eagle Mountain","slug":"eagle-mountain-utah","kind":"city","parentLocationId":"d4c6c7ee-123a-4e8a-b272-47962ebad057","region":"Utah","lat":40.3093488,"lng":-112.0119825,"reviewStatus":"reviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-17T20:25:17.111Z","updatedAt":"2026-08-21T18:03:03.174Z"},"parties":[{"id":"6f43f7df-591c-49a9-8dbe-eb7c1dec48da","dataCenterId":"a76e96bd-5e07-444b-ba92-4995dcb78add","companyId":null,"externalName":"Rocky Mountain Power (PacifiCorp)","role":"utility","structureNotes":"Schedule 34 renewable tariff","createdAt":"2026-08-17T20:25:20.765Z","company":null},{"id":"717b27be-93b0-4b8f-87d9-870ac00e9499","dataCenterId":"a76e96bd-5e07-444b-ba92-4995dcb78add","companyId":"a9a34db8-5719-4789-b681-7ba6643a92b2","externalName":"Meta Platforms","role":"operator","structureNotes":null,"createdAt":"2026-08-17T20:25:19.991Z","company":{"id":"a9a34db8-5719-4789-b681-7ba6643a92b2","name":"Meta Platforms","slug":"meta-platforms"}},{"id":"c886a45d-3e86-46e3-a07a-15ca7b96b31f","dataCenterId":"a76e96bd-5e07-444b-ba92-4995dcb78add","companyId":null,"externalName":"Excelsior Energy Capital","role":"developer","structureNotes":"Owner/developer of the Faraday Solar project supplying the Meta campus via a 20-year renewable PPA (acquired the project from Parasol/Clenera in 2023).","createdAt":"2026-08-19T01:34:19.042Z","company":null}],"capacityClaims":[{"id":"689a58fe-76b9-4f36-b0b2-7653486e7458","dataCenterId":"a76e96bd-5e07-444b-ba92-4995dcb78add","series":"announced","valueGw":1.8,"asOf":"2025-11-21T00:00:00.000Z","sourceUrl":"https://www.heraldextra.com/news/2025/nov/21/rays-of-power-utahs-largest-solar-plant-becomes-operational-set-to-power-eagle-mountain-data-center/","sourceType":"journalist_report","evidenceTier":"claimed","supersedesId":null,"note":"Cited scaling ceiling up to 1.8 GW; not a contracted figure.","createdAt":"2026-08-17T20:25:19.075Z"},{"id":"58550a3c-72ec-48dc-b5a4-ad01527a1a7b","dataCenterId":"a76e96bd-5e07-444b-ba92-4995dcb78add","series":"energized","valueGw":0.2,"asOf":"2025-02-01T00:00:00.000Z","sourceUrl":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Metas-Eagle-Mountain-Data-Center.pdf","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"Reported ~200 MW operational capacity.","createdAt":"2026-08-17T20:25:18.190Z"}],"financialClaims":[{"id":"5084c5a3-d4a4-48a9-bf32-630d9a22410c","dataCenterId":"a76e96bd-5e07-444b-ba92-4995dcb78add","kind":"capex","label":"Meta cumulative campus investment","valueUsd":"1500000000","capUsd":null,"conditions":"Total capital investment cited at 2022 Phase 3 expansion toward ~4.5M sq ft campus.","asOf":"2022-06-01T00:00:00.000Z","sourceUrl":"https://www.deseret.com/utah/2022/9/30/23380151/facebook-meta-announces-expansion-eagle-mountain-data-center-tax-breaks/","sourceType":"journalist_report","evidenceTier":"reported","createdAt":"2026-08-19T01:34:17.099Z"}],"metricClaims":[{"id":"99ae162b-821d-46fe-9a0b-0d26ba59378f","dataCenterId":"a76e96bd-5e07-444b-ba92-4995dcb78add","metricType":"capex_usd","valueNumeric":1500000000,"valueText":null,"unit":null,"grantingJurisdiction":null,"asOf":"2026-01-01T00:00:00.000Z","sourceUrl":"https://datacenters.atmeta.com/asset/eagle-mountain-data-center-sheet/","sourceType":"operator_page","evidenceTier":"reported","supersedesId":null,"note":"migrated from Tier2 facility meta-utah-eagle-mountain","createdAt":"2026-08-18T13:51:30.000Z"},{"id":"14af64ce-511f-4054-a87d-579b89da100b","dataCenterId":"a76e96bd-5e07-444b-ba92-4995dcb78add","metricType":"jobs_construction","valueNumeric":1200,"valueText":null,"unit":null,"grantingJurisdiction":null,"asOf":"2026-01-01T00:00:00.000Z","sourceUrl":"https://datacenters.atmeta.com/asset/eagle-mountain-data-center-sheet/","sourceType":"operator_page","evidenceTier":"reported","supersedesId":null,"note":"migrated from Tier2 facility meta-utah-eagle-mountain","createdAt":"2026-08-18T13:51:30.770Z"},{"id":"7bad7c0b-71bf-436e-99e9-6216e11582bb","dataCenterId":"a76e96bd-5e07-444b-ba92-4995dcb78add","metricType":"jobs_permanent","valueNumeric":300,"valueText":null,"unit":null,"grantingJurisdiction":null,"asOf":"2026-01-01T00:00:00.000Z","sourceUrl":"https://datacenters.atmeta.com/asset/eagle-mountain-data-center-sheet/","sourceType":"operator_page","evidenceTier":"reported","supersedesId":null,"note":"migrated from Tier2 facility meta-utah-eagle-mountain","createdAt":"2026-08-18T13:51:31.534Z"}],"powerProjects":[{"id":"f1fa5cc3-2284-4af6-8817-79756ea776d2","dataCenterId":"a76e96bd-5e07-444b-ba92-4995dcb78add","name":"Faraday Solar","type":"solar","capacityGw":0.685,"lifecycleState":"energized","sourceUrl":"https://www.heraldextra.com/news/2025/nov/21/rays-of-power-utahs-largest-solar-plant-becomes-operational-set-to-power-eagle-mountain-data-center/","evidenceTier":"reported","note":"685.3 MWdc; 20-year PPA via Rocky Mountain Power Schedule 34.","createdAt":"2026-08-17T20:25:19.607Z"},{"id":"e3682a81-6bfd-49ec-ad7f-edde0db1336a","dataCenterId":"a76e96bd-5e07-444b-ba92-4995dcb78add","name":"Spanish Fork (Mapleton) to Mercer 345 kV transmission line","type":"grid","capacityGw":null,"lifecycleState":"announced","sourceUrl":"https://www.heraldextra.com/news/2025/aug/17/rocky-mountain-power-proposing-new-transmission-line-in-utah-county-some-residents-cast-concerns/","evidenceTier":"reported","note":"45-mile 345 kV line proposed by Rocky Mountain Power (Aug 2025) to add capacity serving Utah County load growth; delivers to the Mercer substation (built 2019 to serve the Meta campus).","createdAt":"2026-08-19T01:34:17.915Z"}],"facilities":[{"slug":"meta-eagle-mountain-ut","name":"Eagle Mountain Data Center","status":"operating","criticalItMw":null,"facilityType":"hyperscale"}],"incidents":[],"events":[{"id":"adbcc1c0-f312-4fee-aec0-3866d02b7b41","dataCenterId":"a76e96bd-5e07-444b-ba92-4995dcb78add","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: Excelsior Energy Capital","occurredAt":"2026-08-19T01:34:19.419Z","createdAt":"2026-08-19T01:34:19.419Z"},{"id":"63bed6bb-bcad-4851-957c-cde9fd98844b","dataCenterId":"a76e96bd-5e07-444b-ba92-4995dcb78add","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: Meta cumulative campus investment","occurredAt":"2026-08-19T01:34:17.502Z","createdAt":"2026-08-19T01:34:17.502Z"},{"id":"2059bc6f-c0a3-4599-b77c-fceed198c036","dataCenterId":"a76e96bd-5e07-444b-ba92-4995dcb78add","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: Rocky Mountain Power (PacifiCorp)","occurredAt":"2026-08-17T20:25:21.145Z","createdAt":"2026-08-17T20:25:21.145Z"},{"id":"6de0df31-1b18-4f48-b9cc-aeec21c3e3d8","dataCenterId":"a76e96bd-5e07-444b-ba92-4995dcb78add","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"operator: Meta Platforms","occurredAt":"2026-08-17T20:25:20.378Z","createdAt":"2026-08-17T20:25:20.378Z"},{"id":"ea855414-aacf-4380-9f50-1fd9bc3261f6","dataCenterId":"a76e96bd-5e07-444b-ba92-4995dcb78add","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"1.8","claimId":"689a58fe-76b9-4f36-b0b2-7653486e7458","detail":null,"occurredAt":"2026-08-17T20:25:19.380Z","createdAt":"2026-08-17T20:25:19.380Z"},{"id":"219836b7-36a1-4a58-b854-4d2dbf3e4e17","dataCenterId":"a76e96bd-5e07-444b-ba92-4995dcb78add","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"1.8","claimId":"689a58fe-76b9-4f36-b0b2-7653486e7458","detail":"claimed · journalist_report","occurredAt":"2026-08-17T20:25:19.227Z","createdAt":"2026-08-17T20:25:19.227Z"},{"id":"6ebcc473-e1e6-4981-8fe2-2c41fef0ec13","dataCenterId":"a76e96bd-5e07-444b-ba92-4995dcb78add","eventType":"capacity_changed","series":"energized","oldValue":null,"newValue":"0.2","claimId":"58550a3c-72ec-48dc-b5a4-ad01527a1a7b","detail":null,"occurredAt":"2026-08-17T20:25:18.498Z","createdAt":"2026-08-17T20:25:18.498Z"},{"id":"63176690-ec18-4536-be00-dfd11e463f25","dataCenterId":"a76e96bd-5e07-444b-ba92-4995dcb78add","eventType":"claim_recorded","series":"energized","oldValue":null,"newValue":"0.2","claimId":"58550a3c-72ec-48dc-b5a4-ad01527a1a7b","detail":"reported · press_release","occurredAt":"2026-08-17T20:25:18.343Z","createdAt":"2026-08-17T20:25:18.343Z"}],"capacity_picture":{"announced_gw":1.8,"contracted_gw":null,"under_construction_gw":null,"energized_gw":0.2,"announced_minus_energized_gw":1.6,"by_series":{"announced":{"valueGw":1.8,"asOf":"2025-11-21T00:00:00.000Z","evidenceTier":"claimed","sourceUrl":"https://www.heraldextra.com/news/2025/nov/21/rays-of-power-utahs-largest-solar-plant-becomes-operational-set-to-power-eagle-mountain-data-center/"},"contracted":null,"under_construction":null,"energized":{"valueGw":0.2,"asOf":"2025-02-01T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://datacenters.atmeta.com/wp-content/uploads/2025/02/Metas-Eagle-Mountain-Data-Center.pdf"}}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Meta Eagle Mountain Data Center Campus","url":"https://registry.deploy.report/datacenters/meta-eagle-mountain-utah","geo":{"@type":"GeoCoordinates","latitude":40.366,"longitude":-112.088},"address":{"@type":"PostalAddress","addressLocality":"Eagle Mountain"}}}