{"id":"aca9e9b9-db6a-469a-926b-79c18512452f","slug":"meta-lebanon-leap-indiana","name":"Meta Lebanon Data Center (LEAP District)","aliases":["Hello Lebanon","Meta LEAP District data center"],"locationId":"b3ca5508-3241-4c38-be83-a96e30584053","lat":40.02,"lng":-86.47,"locationPrecision":"city","landStatus":"greenfield","lifecycleState":"under_construction","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":"2027-07-01T00:00:00.000Z","expectedEnergizationPrecision":"half","expectedEnergizationMilestone":"first_power","dedicatedSubstation":null,"gridOperator":"MISO","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Meta $10B+ campus in the LEAP Innovation and Research District, Boone County, targeting ~1 GW across 13 buildings (~4M sq ft) on 1,500 acres; groundbreaking Feb 2026. Served by Boone County REMC with 400+ MW of new Meta-backed renewables. MISO queue position and any IURC special-contract docket not located; coordinates approximate.","keyFacts":[{"label":"Investment (company-claimed, Feb 2026)","value":"$10B+; about 4,000 construction jobs at peak; 300+ operational jobs; about 4M sq ft"},{"label":"Capacity (company-claimed)","value":"1 GW for AI workloads and core products"},{"label":"Campus","value":"1,500 acres; 13 buildings including 10 data center buildings"},{"label":"Energy (company-claimed)","value":"Boone REMC and Wabash Valley Power Alliance; $1M a year for 20 years for energy aid"},{"label":"Infrastructure (company-claimed)","value":"$120M+ for water infrastructure; closed-loop liquid cooling; LEED Gold target"},{"label":"Community payment","value":"$1.5M a year to Lebanon per completed phase, up to six phases"}],"reviewStatus":"reviewed","sources":[{"url":"https://lebanon.in.gov/2026/02/11/meta-makes-lebanon-data-center-announcement-official/","date":"2026-02-11","title":"Meta Makes Lebanon Data Center Announcement Official","publisher":"City of Lebanon, Indiana"},{"url":"https://indianacapitalchronicle.com/2026/02/11/details-on-long-expected-meta-data-center-campus-unveiled/","date":"2026-02-11","title":"Details on long-expected Meta data center campus unveiled","publisher":"Indiana Capital Chronicle"},{"url":"https://datacenters.atmeta.com/2026/02/hello-lebanon/","date":"2026-02-11","title":"Hello, Lebanon!","publisher":"Meta Data Centers"},{"url":"https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/","date":"2026-02-11","title":"Meta's New Data Center in Lebanon, Indiana Marks a Milestone AI Investment","publisher":"Meta Newsroom"},{"url":"https://iedc.in.gov/events/news/details/2026/02/11/gov.-braun-breaks-ground-on-10b-meta-data-center-campus-at-leap-district","date":"2026-02-11","title":"Gov. Braun Breaks Ground on $10B Meta Data Center Campus at LEAP District","publisher":"Indiana Economic Development Corporation"},{"url":"https://www.spokesman.com/stories/2026/feb/11/meta-begins-construction-of-10-billion-indiana-dat/","title":"Meta begins construction of $10 billion Indiana data center to boost AI capabilities","sourceName":"Reuters via The Spokesman-Review","publishedAt":"2026-02-11"}],"reviewNote":null,"createdAt":"2026-08-17T20:21:06.684Z","updatedAt":"2026-11-18T03:31:16.665Z","location":{"id":"b3ca5508-3241-4c38-be83-a96e30584053","name":"Lebanon","slug":"lebanon-indiana","kind":"city","parentLocationId":"7fda7dfe-fa16-478b-b456-7a3f45a33844","region":"Middle East","lat":40.02,"lng":-86.47,"reviewStatus":"reviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-17T20:21:06.303Z","updatedAt":"2026-08-21T03:20:12.226Z"},"parties":[{"id":"63a2c9e6-1c61-45ba-b5e9-89628a32d0bc","dataCenterId":"aca9e9b9-db6a-469a-926b-79c18512452f","companyId":null,"externalName":"Boone County REMC","role":"utility","structureNotes":"serving co-op; Meta pays full energy cost per announcement","createdAt":"2026-08-17T20:21:08.660Z","company":null},{"id":"e54d61be-906b-436c-8f4f-11afdf38f019","dataCenterId":"aca9e9b9-db6a-469a-926b-79c18512452f","companyId":"303ca7c0-45ce-4503-97e7-d5e0d5adb2bb","externalName":"Meta Platforms","role":"operator","structureNotes":null,"createdAt":"2026-08-17T20:21:07.903Z","company":{"id":"303ca7c0-45ce-4503-97e7-d5e0d5adb2bb","name":"Meta","slug":"meta"}}],"capacityClaims":[{"id":"aba96197-d866-4a32-9664-a3cbf510ba79","dataCenterId":"aca9e9b9-db6a-469a-926b-79c18512452f","series":"announced","valueGw":1,"asOf":"2026-02-11T00:00:00.000Z","sourceUrl":"https://lebanon.in.gov/2026/02/11/meta-makes-lebanon-data-center-announcement-official/","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":"1 GW design target; phasing-to-MW not disclosed","createdAt":"2026-08-17T20:21:07.374Z"}],"financialClaims":[],"metricClaims":[{"id":"ca6adfea-4799-487d-9566-93ac68cedf5a","dataCenterId":"aca9e9b9-db6a-469a-926b-79c18512452f","metricType":"capex_usd","valueNumeric":10000000000,"valueText":null,"unit":null,"grantingJurisdiction":null,"asOf":"2026-01-01T00:00:00.000Z","sourceUrl":"https://datacenters.atmeta.com/asset/meta-lebanon-data-center-info-sheet/","sourceType":"operator_page","evidenceTier":"reported","supersedesId":null,"note":"migrated from Tier2 facility meta-indiana-lebanon","createdAt":"2026-08-18T13:51:52.037Z"},{"id":"3cfdbb06-c083-4b2c-9fac-878f703b4230","dataCenterId":"aca9e9b9-db6a-469a-926b-79c18512452f","metricType":"jobs_construction","valueNumeric":4000,"valueText":null,"unit":null,"grantingJurisdiction":null,"asOf":"2026-01-01T00:00:00.000Z","sourceUrl":"https://datacenters.atmeta.com/asset/meta-lebanon-data-center-info-sheet/","sourceType":"operator_page","evidenceTier":"reported","supersedesId":null,"note":"migrated from Tier2 facility meta-indiana-lebanon","createdAt":"2026-08-18T13:51:52.806Z"},{"id":"cc4be9c0-8458-412f-9f10-7b660c8d6c71","dataCenterId":"aca9e9b9-db6a-469a-926b-79c18512452f","metricType":"jobs_permanent","valueNumeric":300,"valueText":null,"unit":null,"grantingJurisdiction":null,"asOf":"2026-01-01T00:00:00.000Z","sourceUrl":"https://datacenters.atmeta.com/asset/meta-lebanon-data-center-info-sheet/","sourceType":"operator_page","evidenceTier":"reported","supersedesId":null,"note":"migrated from Tier2 facility meta-indiana-lebanon","createdAt":"2026-08-18T13:51:53.574Z"}],"powerProjects":[],"permits":[{"id":"ab0510d6-09b2-474d-8413-43b03d64a4dd","dataCenterId":"aca9e9b9-db6a-469a-926b-79c18512452f","agency":"IDEM","jurisdiction":"Indiana","kind":"air","permitType":"New source construction + Part 70 operating permit (stationary data center)","number":"T011-50034-00093","applicant":"Orla, LLC","status":"active","filedDate":null,"decidedDate":"2026-09-25T00:00:00.000Z","docket":null,"regulatedEntityId":null,"sourceUrl":"https://permits.air.idem.in.gov/50034f.pdf","reviewStatus":"reviewed","reviewNote":"Campus link confirmed 2026-11-18: IDEM's air permit is issued to Orla, LLC for a data center at 3062 West SR 32, Lebanon, and local reporting identifies Orla LLC as the Meta subsidiary developing the Lebanon campus. The permit was issued September 25, 2026. https://permits.air.idem.in.gov/50034f.pdf \"IDEM permit: \"Orla, LLC 3062 West SR 32 Lebanon, Indiana 46052\", \"The Permittee owns and operates a stationary data center.\", \"Issuance Date: September 25, 2026\". The Lebanon Reporter (Feb 15, 2026): \"Meta subsidiary Orla LLC had been the face of the project\". The Lebanon Reporter (Sep 3, 2025): \"the existing right-of-way for Ind. 32 will be vacated to Orla LLC, the Meta property developers.\"\"","lastCheckedAt":"2026-11-17T00:00:00.000Z","createdAt":"2026-11-18T02:56:32.692Z","updatedAt":"2026-11-18T18:53:15.037Z"},{"id":"e3e693e5-3728-4a6f-8137-881d2336fd37","dataCenterId":"aca9e9b9-db6a-469a-926b-79c18512452f","agency":"IDEM","jurisdiction":"Indiana","kind":"air","permitType":"Part 70 administrative operating permit (gas-fired bridge power station)","number":"T011-50087-00094","applicant":"Life Cycle Power","status":"active","filedDate":null,"decidedDate":"2026-09-25T00:00:00.000Z","docket":null,"regulatedEntityId":null,"sourceUrl":"https://permits.air.idem.in.gov/50087f.pdf","reviewStatus":"reviewed","reviewNote":"Campus link confirmed 2026-11-18: IDEM treats Life Cycle Power's generating plant at 3602 West SR 32 as one source with Orla, LLC's data center, and Orla LLC is Meta's subsidiary for the Lebanon campus. The permit was issued September 25, 2026. https://permits.air.idem.in.gov/50087f.pdf \"IDEM permit: \"Orla, LLC (011-00093), 3062 West SR 32, Lebanon, IN 46052 - This source owns and operates a stationary Data Center.\" \"IDEM has determined that Orla, LLC and Life Cycle Power are considered one source\". Issuance Date: September 25, 2026. The Lebanon Reporter (Feb 15, 2026): \"Meta subsidiary Orla LLC had been the face of the project\".\"","lastCheckedAt":"2026-11-17T00:00:00.000Z","createdAt":"2026-11-18T02:56:33.068Z","updatedAt":"2026-11-18T18:53:14.555Z"}],"facilities":[{"slug":"meta-lebanon-in","name":"Lebanon Data Center","status":"under_construction","criticalItMw":null,"facilityType":"hyperscale"},{"slug":"meta-lebanon-leap-domino-in","name":"Meta Lebanon LEAP Campus (Project Domino)","status":"under_construction","criticalItMw":null,"facilityType":"hyperscale"}],"incidents":[],"events":[{"id":"fec30620-2cc9-4dd0-a1c9-4e5d56e2017e","dataCenterId":"aca9e9b9-db6a-469a-926b-79c18512452f","eventType":"air_facility_recorded","series":"IN0000001801100094","oldValue":null,"newValue":"Operating|No Classification In ICIS||No High Priority Violation","claimId":null,"detail":"EPA's Clean Air Act records list LIFE CYCLE POWER (3602 W Sr 32, Lebanon, IN) as operating. Source: EPA ECHO facility IN0000001801100094.","occurredAt":"2026-11-18T18:54:43.844Z","createdAt":"2026-11-18T18:54:43.844Z"},{"id":"72df519f-e43c-4e7c-9639-e1f7591b949d","dataCenterId":"aca9e9b9-db6a-469a-926b-79c18512452f","eventType":"air_facility_recorded","series":"IN0000001801100093","oldValue":null,"newValue":"Operating|No Classification In ICIS||No High Priority Violation","claimId":null,"detail":"EPA's Clean Air Act records list ORLA LLC (3062 W Sr 32, Lebanon, IN) as operating. Source: EPA ECHO facility IN0000001801100093.","occurredAt":"2026-11-18T18:49:47.789Z","createdAt":"2026-11-18T18:49:47.789Z"},{"id":"e4c088ab-4577-4ce4-9a56-47d19d690e87","dataCenterId":"aca9e9b9-db6a-469a-926b-79c18512452f","eventType":"energization_date_changed","series":null,"oldValue":null,"newValue":"2027-07-01|half","claimId":null,"detail":"intake proposal d925b145-f09b-4113-a8b1-9c21cf9b5646","occurredAt":"2026-11-18T03:31:17.270Z","createdAt":"2026-11-18T03:31:17.270Z"},{"id":"e8d54f49-55c2-4484-945a-0cce41028250","dataCenterId":"aca9e9b9-db6a-469a-926b-79c18512452f","eventType":"permit_recorded","series":null,"oldValue":null,"newValue":"IDEM T011-50087-00094: active","claimId":null,"detail":"Part 70 administrative operating permit (gas-fired bridge power station) T011-50087-00094 recorded from https://permits.air.idem.in.gov/50087f.pdf","occurredAt":"2026-11-18T02:56:33.216Z","createdAt":"2026-11-18T02:56:33.216Z"},{"id":"09860f2d-a7f8-4aff-91ce-61cbd07e4244","dataCenterId":"aca9e9b9-db6a-469a-926b-79c18512452f","eventType":"permit_recorded","series":null,"oldValue":null,"newValue":"IDEM T011-50034-00093: active","claimId":null,"detail":"New source construction + Part 70 operating permit (stationary data center) T011-50034-00093 recorded from https://permits.air.idem.in.gov/50034f.pdf","occurredAt":"2026-11-18T02:56:32.837Z","createdAt":"2026-11-18T02:56:32.837Z"},{"id":"44747770-dac8-455e-aa6a-24b3491a88ab","dataCenterId":"aca9e9b9-db6a-469a-926b-79c18512452f","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: Boone County REMC","occurredAt":"2026-08-17T20:21:09.046Z","createdAt":"2026-08-17T20:21:09.046Z"},{"id":"a23ba330-5668-4f09-b895-140d89836e8c","dataCenterId":"aca9e9b9-db6a-469a-926b-79c18512452f","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"operator: Meta Platforms","occurredAt":"2026-08-17T20:21:08.282Z","createdAt":"2026-08-17T20:21:08.282Z"},{"id":"724c18c0-3a32-4055-9926-259f864a3e01","dataCenterId":"aca9e9b9-db6a-469a-926b-79c18512452f","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"1","claimId":"aba96197-d866-4a32-9664-a3cbf510ba79","detail":null,"occurredAt":"2026-08-17T20:21:07.675Z","createdAt":"2026-08-17T20:21:07.675Z"},{"id":"edb8ca1c-7f94-4d3e-888d-71aa31a35053","dataCenterId":"aca9e9b9-db6a-469a-926b-79c18512452f","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"1","claimId":"aba96197-d866-4a32-9664-a3cbf510ba79","detail":"claimed · press_release","occurredAt":"2026-08-17T20:21:07.528Z","createdAt":"2026-08-17T20:21:07.528Z"}],"capacity_picture":{"announced_gw":1,"contracted_gw":null,"under_construction_gw":null,"energized_gw":null,"announced_minus_energized_gw":1,"by_series":{"announced":{"valueGw":1,"asOf":"2026-02-11T00:00:00.000Z","evidenceTier":"claimed","sourceUrl":"https://lebanon.in.gov/2026/02/11/meta-makes-lebanon-data-center-announcement-official/"},"contracted":null,"under_construction":null,"energized":null}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Meta Lebanon Data Center (LEAP District)","url":"https://registry.deploy.report/datacenters/meta-lebanon-leap-indiana","geo":{"@type":"GeoCoordinates","latitude":40.02,"longitude":-86.47},"address":{"@type":"PostalAddress","addressLocality":"Lebanon"}}}