{"id":"60054c7b-1a7e-492e-9871-dfbafcf75161","slug":"meta-los-lunas-new-mexico","name":"Meta Los Lunas Data Center Campus","aliases":[],"locationId":"567f7738-c39c-474b-a9a8-8a26a7a1aac7","lat":null,"lng":null,"landStatus":"private","lifecycleState":"partially_energized","powerSourceMix":"mixed","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"WECC","waterSourceNotes":"New AI-dedicated buildings designed to use substantially less water than earlier buildings","servingUtility":null,"acreage":750,"totalBuildingSqft":null,"streetAddress":null,"notes":"Meta's roughly 750-acre Los Lunas campus houses eight completed data center buildings (about 3.8 million sq ft). A 2025 expansion of two additional buildings, an approximately $800 million investment, is described as the first in Meta's portfolio dedicated to AI and machine learning hardware. Meta has procured more than 885 MW of renewable energy in New Mexico to offset the campus.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.datacenterdynamics.com/en/news/meta-planning-expansion-of-los-lunas-data-center-campus-in-new-mexico/","title":"DCD: Meta plans Los Lunas expansion"},{"url":"https://www.news-bulletin.com/news/los-lunas-meta-data-center-introduces-expansion-dedicated-to-artificial-intelligence/331733","title":"News-Bulletin: Los Lunas Meta AI expansion"}],"reviewNote":null,"createdAt":"2026-08-19T00:47:59.788Z","updatedAt":"2026-08-19T01:34:51.078Z","location":{"id":"567f7738-c39c-474b-a9a8-8a26a7a1aac7","name":"Los Lunas","slug":"los-lunas-new-mexico","kind":"city","parentLocationId":"569a3001-032e-42c6-8cee-d4cdb34dc29d","region":null,"lat":34.8142093,"lng":-106.7613067,"reviewStatus":"unreviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-18T03:20:30.056Z","updatedAt":"2026-08-18T15:06:56.335Z"},"parties":[{"id":"267a807d-4ec4-4575-a8a1-63272dee4c81","dataCenterId":"60054c7b-1a7e-492e-9871-dfbafcf75161","companyId":"303ca7c0-45ce-4503-97e7-d5e0d5adb2bb","externalName":null,"role":"operator","structureNotes":"Owner and operator","createdAt":"2026-08-19T00:48:01.960Z","company":{"id":"303ca7c0-45ce-4503-97e7-d5e0d5adb2bb","name":"Meta","slug":"meta"}},{"id":"b2e929aa-6c8e-41ee-9900-cd7100aec9c1","dataCenterId":"60054c7b-1a7e-492e-9871-dfbafcf75161","companyId":"303ca7c0-45ce-4503-97e7-d5e0d5adb2bb","externalName":null,"role":"developer","structureNotes":null,"createdAt":"2026-08-19T00:48:03.110Z","company":{"id":"303ca7c0-45ce-4503-97e7-d5e0d5adb2bb","name":"Meta","slug":"meta"}},{"id":"1a4e85ca-f7ff-4add-9405-3734e086822d","dataCenterId":"60054c7b-1a7e-492e-9871-dfbafcf75161","companyId":null,"externalName":"Public Service Company of New Mexico (PNM)","role":"utility","structureNotes":"Interconnecting utility; procures solar/wind/BESS to serve the campus","createdAt":"2026-08-19T01:32:52.102Z","company":null},{"id":"2e5ca2ad-9fc5-46c5-8071-0c89888eaa50","dataCenterId":"60054c7b-1a7e-492e-9871-dfbafcf75161","companyId":null,"externalName":"WECC","role":"grid_operator","structureNotes":null,"createdAt":"2026-08-19T01:32:53.248Z","company":null}],"capacityClaims":[{"id":"b13fd129-7f09-4c0b-b9c5-061720c14e4e","dataCenterId":"60054c7b-1a7e-492e-9871-dfbafcf75161","series":"energized","valueGw":0.04,"asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://servercountry.org/data/projects/meta-los-lunas-data-center-campus-nm/","sourceType":"tracker","evidenceTier":"claimed","supersedesId":null,"note":"Per-building load ~40MW per tracker; eight buildings operating (per-building figure only, campus total not disclosed by Meta)","createdAt":"2026-08-19T01:32:48.109Z"}],"financialClaims":[{"id":"ba67370c-c2b3-4bf7-8ed5-988ba2dfc525","dataCenterId":"60054c7b-1a7e-492e-9871-dfbafcf75161","kind":"capex","label":"Meta AI-dedicated expansion (two buildings)","valueUsd":"800000000","capUsd":null,"conditions":"About three-year construction timeline","asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/meta-planning-expansion-of-los-lunas-data-center-campus-in-new-mexico/","sourceType":"journalist_report","evidenceTier":"reported","createdAt":"2026-08-19T00:48:00.168Z"},{"id":"bd67a4b8-668f-4152-904a-b52a55c73630","dataCenterId":"60054c7b-1a7e-492e-9871-dfbafcf75161","kind":"capex","label":"2025 AI-dedicated expansion (2 buildings)","valueUsd":"800000000","capUsd":null,"conditions":null,"asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://www.news-bulletin.com/news/los-lunas-meta-data-center-introduces-expansion-dedicated-to-artificial-intelligence/331733","sourceType":"journalist_report","evidenceTier":"reported","createdAt":"2026-08-19T01:32:48.654Z"},{"id":"c7a8a60b-d93e-49b5-9839-bed704c5f418","dataCenterId":"60054c7b-1a7e-492e-9871-dfbafcf75161","kind":"capex","label":"Cumulative investment in eight campus buildings","valueUsd":"2000000000","capUsd":null,"conditions":"~$2B invested to date across eight buildings","asOf":"2024-06-01T00:00:00.000Z","sourceUrl":"https://baxtel.com/data-center/meta-los-lunas-campus","sourceType":"tracker","evidenceTier":"reported","createdAt":"2026-08-19T01:32:49.418Z"}],"metricClaims":[{"id":"d949c490-2dd5-4b5b-b9fd-b8cab7d10d0e","dataCenterId":"60054c7b-1a7e-492e-9871-dfbafcf75161","metricType":"cooling_type","valueNumeric":null,"valueText":"Eight completed buildings totaling ~3.8 million sq ft on ~750-acre parcel","unit":null,"grantingJurisdiction":null,"asOf":"2024-06-01T00:00:00.000Z","sourceUrl":"https://baxtel.com/data-center/meta-los-lunas-campus","sourceType":"tracker","evidenceTier":"reported","supersedesId":null,"note":null,"createdAt":"2026-08-19T01:32:51.337Z"},{"id":"5236e430-cc66-4ba7-a0a5-0ff2e9f7656e","dataCenterId":"60054c7b-1a7e-492e-9871-dfbafcf75161","metricType":"jobs_permanent","valueNumeric":300,"valueText":"~300 full-time Meta employees (plus ~30 new from expansion)","unit":null,"grantingJurisdiction":null,"asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://www.news-bulletin.com/news/los-lunas-meta-data-center-introduces-expansion-dedicated-to-artificial-intelligence/331733","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":null,"createdAt":"2026-08-19T01:32:50.952Z"}],"powerProjects":[{"id":"8eb1085d-1d9a-4341-ae8f-95f6e6113653","dataCenterId":"60054c7b-1a7e-492e-9871-dfbafcf75161","name":"Meta New Mexico renewable procurement","type":"solar","capacityGw":0.885,"lifecycleState":"energized","sourceUrl":"https://www.news-bulletin.com/news/los-lunas-meta-data-center-introduces-expansion-dedicated-to-artificial-intelligence/331733","evidenceTier":"reported","note":"More than 885 MW of renewable capacity procured in New Mexico to offset campus use","createdAt":"2026-08-19T00:48:01.012Z"},{"id":"77db3694-d7a7-49cc-806a-d4b0529bf1f6","dataCenterId":"60054c7b-1a7e-492e-9871-dfbafcf75161","name":"Contracted solar + wind portfolio (~885MW) for Meta Los Lunas","type":"solar","capacityGw":0.885,"lifecycleState":"financed","sourceUrl":"https://www.mmcginvest.com/post/the-desert-becomes-a-data-center-meta-s-3-3-billion-bet-on-los-lunas-new-mexico","evidenceTier":"reported","note":"~885MW contracted solar/wind capacity powering the campus","createdAt":"2026-08-19T01:32:50.177Z"},{"id":"7facf528-658c-4644-87b1-66f04eb504c1","dataCenterId":"60054c7b-1a7e-492e-9871-dfbafcf75161","name":"PNM hybrid battery energy storage (BESS) offtake","type":"storage","capacityGw":0.1,"lifecycleState":"announced","sourceUrl":"https://www.energy-storage.news/new-mexico-utility-seeks-approval-of-hybrid-bess-offtake-contracts-to-power-meta-data-centres/","evidenceTier":"reported","note":"~100MW battery storage; PNM sought PRC approval of hybrid BESS offtake to serve Meta","createdAt":"2026-08-19T01:32:50.560Z"}],"facilities":[],"incidents":[],"events":[{"id":"9115e3b3-b95e-4675-8dd5-4b15f3e4d73a","dataCenterId":"60054c7b-1a7e-492e-9871-dfbafcf75161","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"grid_operator: WECC","occurredAt":"2026-08-19T01:32:53.631Z","createdAt":"2026-08-19T01:32:53.631Z"},{"id":"e9d0eea5-5fd5-4b19-af8f-e5689e2e734b","dataCenterId":"60054c7b-1a7e-492e-9871-dfbafcf75161","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: Public Service Company of New Mexico (PNM)","occurredAt":"2026-08-19T01:32:52.484Z","createdAt":"2026-08-19T01:32:52.484Z"},{"id":"5c8ad862-fd2f-40ac-8657-d34bee84b20c","dataCenterId":"60054c7b-1a7e-492e-9871-dfbafcf75161","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: Cumulative investment in eight campus buildings","occurredAt":"2026-08-19T01:32:49.797Z","createdAt":"2026-08-19T01:32:49.797Z"},{"id":"83eecc7b-0a75-499c-a9ea-b0d0ef103eb2","dataCenterId":"60054c7b-1a7e-492e-9871-dfbafcf75161","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: 2025 AI-dedicated expansion (2 buildings)","occurredAt":"2026-08-19T01:32:49.037Z","createdAt":"2026-08-19T01:32:49.037Z"},{"id":"02b72fa5-89e8-45fc-a5d3-e2d18eec068e","dataCenterId":"60054c7b-1a7e-492e-9871-dfbafcf75161","eventType":"capacity_changed","series":"energized","oldValue":null,"newValue":"0.04","claimId":"b13fd129-7f09-4c0b-b9c5-061720c14e4e","detail":null,"occurredAt":"2026-08-19T01:32:48.424Z","createdAt":"2026-08-19T01:32:48.424Z"},{"id":"940e6f4c-d124-441c-948a-0c4c1de36b49","dataCenterId":"60054c7b-1a7e-492e-9871-dfbafcf75161","eventType":"claim_recorded","series":"energized","oldValue":null,"newValue":"0.04","claimId":"b13fd129-7f09-4c0b-b9c5-061720c14e4e","detail":"claimed · tracker","occurredAt":"2026-08-19T01:32:48.271Z","createdAt":"2026-08-19T01:32:48.271Z"},{"id":"f102a235-622b-4cff-aec7-a8ff31f1f20d","dataCenterId":"60054c7b-1a7e-492e-9871-dfbafcf75161","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: 303ca7c0-45ce-4503-97e7-d5e0d5adb2bb","occurredAt":"2026-08-19T00:48:03.496Z","createdAt":"2026-08-19T00:48:03.496Z"},{"id":"3b851f84-ccc1-4f20-923e-61fb4947ac12","dataCenterId":"60054c7b-1a7e-492e-9871-dfbafcf75161","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"operator: 303ca7c0-45ce-4503-97e7-d5e0d5adb2bb","occurredAt":"2026-08-19T00:48:02.342Z","createdAt":"2026-08-19T00:48:02.342Z"},{"id":"bacd9a67-fdb7-448b-893f-7410196f00a4","dataCenterId":"60054c7b-1a7e-492e-9871-dfbafcf75161","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: Meta AI-dedicated expansion (two buildings)","occurredAt":"2026-08-19T00:48:00.552Z","createdAt":"2026-08-19T00:48:00.552Z"}],"capacity_picture":{"announced_gw":null,"contracted_gw":null,"under_construction_gw":null,"energized_gw":0.04,"announced_minus_energized_gw":null,"by_series":{"announced":null,"contracted":null,"under_construction":null,"energized":{"valueGw":0.04,"asOf":"2025-06-01T00:00:00.000Z","evidenceTier":"claimed","sourceUrl":"https://servercountry.org/data/projects/meta-los-lunas-data-center-campus-nm/"}}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Meta Los Lunas Data Center Campus","url":"https://registry.deploy.report/datacenters/meta-los-lunas-new-mexico","address":{"@type":"PostalAddress","addressLocality":"Los Lunas"}}}