{"id":"d7c13110-4def-4903-9828-a30b405f3afb","slug":"meta-prometheus-ohio","name":"Meta Prometheus Data Center (New Albany)","aliases":[],"locationId":"c8245e03-38b0-4243-9753-af44aa940c35","lat":40.0652,"lng":-82.7497,"locationPrecision":"exact","landStatus":"private","lifecycleState":"partially_energized","powerSourceMix":"mixed","interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"PJM","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Prometheus is Meta's ~1 GW New Albany supercluster (5 traditional buildings plus 7 weatherproof 'tent' structures on ~740 acres at 1500 Beech Road), billed as the world's first gigawatt-class AI data center and slated to come fully online by end of 2026. As of May 2026 more than 500 MW of AI compute was reported already installed, so it is partially energized rather than fully built. Power is a mix: Williams' Socrates South behind-the-meter gas (~200 MW firm) under construction, plus contracted renewables (~800 MW) and nuclear PPAs (Vistra, Constellation, plus future Oklo/TerraPower).","keyFacts":[{"label":"Campus capacity (announced)","value":"Meta states its New Albany, Ohio facility will have 1 GW or more of capacity once construction is complete ([Meta, Infrastructure Explained, Apr 28 2026](https://about.fb.com/news/2026/04/infrastructure-explained-meta-data-centers/))","sourceUrl":"https://about.fb.com/news/2026/04/infrastructure-explained-meta-data-centers/"},{"label":"Named supercluster","value":"Meta's January 2026 nuclear agreements are described as supporting operations including the Prometheus supercluster in New Albany, Ohio ([Meta newsroom, Jan 9 2026](https://about.fb.com/news/2026/01/meta-nuclear-energy-projects-power-american-ai-leadership/))","sourceUrl":"https://about.fb.com/news/2026/01/meta-nuclear-energy-projects-power-american-ai-leadership/"},{"label":"Nuclear offtake (platform)","value":"Agreements with Vistra, TerraPower, and Oklo (plus prior Constellation deal) expected to support up to 6.6 GW of new and existing clean energy by 2035 for grids serving Meta operations, including Prometheus ([Meta newsroom](https://about.fb.com/news/2026/01/meta-nuclear-energy-projects-power-american-ai-leadership/))","sourceUrl":"https://about.fb.com/news/2026/01/meta-nuclear-energy-projects-power-american-ai-leadership/"},{"label":"Ohio nuclear partners (announced)","value":"Vistra: 20-year deals covering Perry and Davis-Besse (Ohio) plus Beaver Valley (PA) with uprates totaling 433 MW targeted early 2030s. Oklo: advanced nuclear campus in Pike County, Ohio, up to 1.2 GW into PJM, possibly online as early as 2030 ([Meta newsroom](https://about.fb.com/news/2026/01/meta-nuclear-energy-projects-power-american-ai-leadership/))","sourceUrl":"https://about.fb.com/news/2026/01/meta-nuclear-energy-projects-power-american-ai-leadership/"},{"label":"Tent / behind-the-meter gas (HOLD)","value":"Secondary reporting describes tent-style halls and Williams/Socrates behind-the-meter gas plants at New Albany. No Meta primary located this wave confirming tent counts, acreage, or on-site gas MW. Held pending Meta or permit primary."}],"reviewStatus":"reviewed","sources":[{"url":"https://measuredai.substack.com/p/meta-prometheus-google-ohio","title":"Meta's Prometheus and Google's Central Ohio Cluster: An AI Data Center Primer","sourceName":"MeasuredAI"},{"url":"https://www.nbc4i.com/news/local-news/new-albany/meet-prometheus-worlds-highest-capacity-data-center-slated-to-open-in-ohio-in-2026/","title":"Meet Prometheus: World's highest capacity data center slated to open in Ohio in 2026","sourceName":"NBC4 WCMH-TV"},{"url":"https://www.nbc4i.com/news/local-news/new-albany/meta-will-use-nuclear-power-for-its-new-albany-a-i-data-center/","title":"Meta will use nuclear power for its New Albany A.I. data center","sourceName":"NBC4 WCMH-TV"},{"url":"https://about.fb.com/news/2026/01/meta-nuclear-energy-projects-power-american-ai-leadership/","date":"2026-01-09","title":"Meta Announces Nuclear Energy Projects (Prometheus / New Albany)","publisher":"Meta"},{"url":"https://about.fb.com/news/2026/04/infrastructure-explained-meta-data-centers/","date":"2026-04-28","title":"Infrastructure Explained: Data Centers (New Albany 1GW+)","publisher":"Meta"}],"reviewNote":null,"createdAt":"2026-08-17T18:11:19.103Z","updatedAt":"2026-09-28T05:30:13.410Z","location":{"id":"c8245e03-38b0-4243-9753-af44aa940c35","name":"New Albany","slug":"new-albany-ohio","kind":"city","parentLocationId":"d126605a-1dcb-49d1-ae70-b54e02f5c72b","region":"Ohio","lat":40.09,"lng":-82.71,"reviewStatus":"reviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-17T18:11:18.717Z","updatedAt":"2026-08-21T03:20:12.226Z"},"parties":[{"id":"71f75d85-093b-4cf5-a1c1-6ff75a716e8c","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","companyId":null,"externalName":"AEP Ohio","role":"utility","structureNotes":"Grid interconnection utility.","createdAt":"2026-08-17T18:11:24.664Z","company":null},{"id":"3865a489-99b1-4f69-aad8-6d76f844558e","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","companyId":null,"externalName":"PJM","role":"grid_operator","structureNotes":"AEP Ohio operates within PJM Interconnection.","createdAt":"2026-08-17T18:11:25.422Z","company":null},{"id":"4af536b3-7249-4a32-9e36-9e7986bd116d","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","companyId":null,"externalName":"Williams Companies","role":"construction","structureNotes":"Building the Socrates South behind-the-meter gas facility.","createdAt":"2026-08-17T18:11:26.197Z","company":null},{"id":"638b9f9f-dc63-4aec-94b3-043126dde32e","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","companyId":null,"externalName":"Vistra / Constellation / Oklo / TerraPower","role":"utility","structureNotes":"Nuclear power counterparties (PPAs and future SMR/advanced-reactor deals).","createdAt":"2026-08-17T18:11:26.944Z","company":null},{"id":"2da4eca9-45fe-44ff-97f9-93ab7634006d","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","companyId":"a9a34db8-5719-4789-b681-7ba6643a92b2","externalName":"Meta Platforms","role":"developer","structureNotes":"Owner-operator; New Albany campus.","createdAt":"2026-08-17T18:11:23.146Z","company":{"id":"a9a34db8-5719-4789-b681-7ba6643a92b2","name":"Meta Platforms","slug":"meta-platforms"}},{"id":"c2995093-baa0-4500-bed7-4d03f5feecf3","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","companyId":"a9a34db8-5719-4789-b681-7ba6643a92b2","externalName":"Meta Platforms","role":"tenant","structureNotes":"Self-tenant; AI supercluster compute.","createdAt":"2026-08-17T18:11:23.915Z","company":{"id":"a9a34db8-5719-4789-b681-7ba6643a92b2","name":"Meta Platforms","slug":"meta-platforms"}}],"capacityClaims":[{"id":"228dd5de-1edc-4e06-b4ca-be483e4224f0","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","series":"announced","valueGw":1,"asOf":"2026-05-01T00:00:00.000Z","sourceUrl":"https://measuredai.substack.com/p/meta-prometheus-google-ohio","sourceType":"journalist_report","evidenceTier":"claimed","supersedesId":null,"note":"~1 GW spanning multiple buildings; described as world's first 1 GW-class data center.","createdAt":"2026-08-17T18:11:19.800Z"},{"id":"a834afe5-e82f-446d-9e0b-f2fa2d7b80ce","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","series":"energized","valueGw":0.5,"asOf":"2026-05-01T00:00:00.000Z","sourceUrl":"https://measuredai.substack.com/p/meta-prometheus-google-ohio","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"More than 500 MW of AI compute reported already installed as of May 2026; full campus targeted to come online by end of 2026.","createdAt":"2026-08-17T18:11:20.627Z"}],"financialClaims":[{"id":"46905476-9e01-4eeb-bc3f-f3a07d90afbf","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","kind":"capex","label":"Meta New Albany campus investment (to date)","valueUsd":"1500000000","capUsd":null,"conditions":"Cumulative since breaking ground in 2017; understates full Prometheus buildout.","asOf":"2026-05-01T00:00:00.000Z","sourceUrl":"https://measuredai.substack.com/p/meta-prometheus-google-ohio","sourceType":"journalist_report","evidenceTier":"reported","createdAt":"2026-08-17T18:11:22.376Z"}],"metricClaims":[],"powerProjects":[{"id":"77b9c360-3a61-450a-b5ee-2923cfc65b0c","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","name":"Williams Socrates South (behind-the-meter gas)","type":"gas","capacityGw":0.2,"lifecycleState":"under_construction","sourceUrl":"https://measuredai.substack.com/p/meta-prometheus-google-ohio","evidenceTier":"reported","note":"~307.5 MW nameplate, ~258 MW at design ambient, 200 MW firm; construction began June 2025, targeted before end of 2026.","createdAt":"2026-08-17T18:11:21.161Z"},{"id":"bfd86379-4d79-4a11-a6a6-9f89d1824674","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","name":"Vistra Ohio nuclear PPA","type":"nuclear","capacityGw":2.1,"lifecycleState":"financed","sourceUrl":"https://www.nbc4i.com/news/local-news/new-albany/meta-will-use-nuclear-power-for-its-new-albany-a-i-data-center/","evidenceTier":"reported","note":"Meta to buy >2.1 GW from two Vistra nuclear plants in Ohio plus expansions; also TerraPower, Oklo (Aurora Powerhouse, Pike County) and Constellation agreements.","createdAt":"2026-08-17T18:11:21.535Z"},{"id":"a23d3418-b428-4f12-b4e8-91891cae4dc6","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","name":"Contracted renewables (Ohio solar / Indiana wind)","type":"solar_storage","capacityGw":0.8,"lifecycleState":"financed","sourceUrl":"https://measuredai.substack.com/p/meta-prometheus-google-ohio","evidenceTier":"reported","note":"Over 800 MW of renewable energy contracted.","createdAt":"2026-08-17T18:11:21.918Z"}],"facilities":[{"slug":"meta-ohio-new-albany","name":"Meta New Albany Data Center","status":"operating","criticalItMw":null,"facilityType":"hyperscale"}],"incidents":[],"events":[{"id":"0bdc36e9-1c0f-4ad1-b46b-540eb2fdb617","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: Vistra / Constellation / Oklo / TerraPower","occurredAt":"2026-08-17T18:11:27.320Z","createdAt":"2026-08-17T18:11:27.320Z"},{"id":"fbb25e22-b561-4d1f-92f0-5234518d0385","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"construction: Williams Companies","occurredAt":"2026-08-17T18:11:26.568Z","createdAt":"2026-08-17T18:11:26.568Z"},{"id":"ff8b8fbb-363c-41ec-861a-b7f9c5ea356b","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"grid_operator: PJM","occurredAt":"2026-08-17T18:11:25.814Z","createdAt":"2026-08-17T18:11:25.814Z"},{"id":"c912848b-592f-47c2-b137-9a3cebf3a05a","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: AEP Ohio","occurredAt":"2026-08-17T18:11:25.039Z","createdAt":"2026-08-17T18:11:25.039Z"},{"id":"ff1734a9-0f0e-4bbc-b700-c0b1a90d97c4","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"tenant: Meta Platforms","occurredAt":"2026-08-17T18:11:24.291Z","createdAt":"2026-08-17T18:11:24.291Z"},{"id":"550a3811-448d-41b0-8197-388666b61dff","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: Meta Platforms","occurredAt":"2026-08-17T18:11:23.530Z","createdAt":"2026-08-17T18:11:23.530Z"},{"id":"2d252f8e-c93a-4c95-b35e-39aed0d17a74","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: Meta New Albany campus investment (to date)","occurredAt":"2026-08-17T18:11:22.760Z","createdAt":"2026-08-17T18:11:22.760Z"},{"id":"74860686-9f32-49eb-b568-3eeee6500907","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","eventType":"capacity_changed","series":"energized","oldValue":null,"newValue":"0.5","claimId":"a834afe5-e82f-446d-9e0b-f2fa2d7b80ce","detail":null,"occurredAt":"2026-08-17T18:11:20.932Z","createdAt":"2026-08-17T18:11:20.932Z"},{"id":"f87fb1ae-9dea-468e-a51f-e933d4b9708e","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","eventType":"claim_recorded","series":"energized","oldValue":null,"newValue":"0.5","claimId":"a834afe5-e82f-446d-9e0b-f2fa2d7b80ce","detail":"reported · journalist_report","occurredAt":"2026-08-17T18:11:20.779Z","createdAt":"2026-08-17T18:11:20.779Z"},{"id":"e20266bf-60af-41d7-9c26-99854f50a25b","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"1","claimId":"228dd5de-1edc-4e06-b4ca-be483e4224f0","detail":null,"occurredAt":"2026-08-17T18:11:20.099Z","createdAt":"2026-08-17T18:11:20.099Z"},{"id":"04a21676-ddf5-49b7-93eb-bb6266e680e2","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"1","claimId":"228dd5de-1edc-4e06-b4ca-be483e4224f0","detail":"claimed · journalist_report","occurredAt":"2026-08-17T18:11:19.950Z","createdAt":"2026-08-17T18:11:19.950Z"}],"capacity_picture":{"announced_gw":1,"contracted_gw":null,"under_construction_gw":null,"energized_gw":0.5,"announced_minus_energized_gw":0.5,"by_series":{"announced":{"valueGw":1,"asOf":"2026-05-01T00:00:00.000Z","evidenceTier":"claimed","sourceUrl":"https://measuredai.substack.com/p/meta-prometheus-google-ohio"},"contracted":null,"under_construction":null,"energized":{"valueGw":0.5,"asOf":"2026-05-01T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://measuredai.substack.com/p/meta-prometheus-google-ohio"}}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Meta Prometheus Data Center (New Albany)","url":"https://registry.deploy.report/datacenters/meta-prometheus-ohio","geo":{"@type":"GeoCoordinates","latitude":40.0652,"longitude":-82.7497},"address":{"@type":"PostalAddress","addressLocality":"New Albany"}}}