{"id":"a1629c36-66b6-4b2a-b032-15c4882e56f5","slug":"microsoft-goodyear-phx70","name":"Microsoft Goodyear Data Center Campus (PHX70)","aliases":["PHX70","PHX-10","Microsoft Goodyear Airpark"],"locationId":"a0f820aa-b620-4286-a9d5-f57021cf8536","lat":null,"lng":null,"locationPrecision":null,"landStatus":"private","lifecycleState":"partially_energized","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"WECC","waterSourceNotes":"Microsoft committed ~$36M toward a ~$90M expansion of Goodyear wastewater treatment; targets ~42M gallons/yr water savings (tracker-reported). Sources conflict on total campus acreage (147-acre documented land parcel vs ~300-acre marketed campus).","servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Roughly $1.5B five-building hyperscale campus on ~300 acres; reported ~263 MW total capacity with early phases (PHX-10, PHX-11) operational. Exact contracted MW and buildout schedule for remaining buildings are not disclosed; the campus figure comes from an aggregator, not a primary utility filing.","keyFacts":[{"label":"2019 Arizona campuses announcement (primary city)","value":"On Jul 30, 2019 the City of Goodyear republished Microsoft's announcement that Arizona would host three new datacenter campuses (El Mirage and Goodyear) intended to run on 100% renewable energy, with a First Solar Sun Streams 2 150 MW PV plant partnership described as covering the energy load for each new campus once operational, LEED Gold pursuit, and hundreds of millions of dollars of investment creating more than 100 permanent jobs when fully operational plus more than 1,000 construction jobs in initial phases ([City of Goodyear, Jul 30 2019](https://www.goodyearaz.gov/Home/Components/News/News/9847/1549))","sourceUrl":"https://www.goodyearaz.gov/Home/Components/News/News/9847/1549"},{"label":"Five-building PHX10-11 campus / West US 3 (reported from city docs)","value":"DCD reports Microsoft's Goodyear plans began with PHX-10 and PHX-11 (~245,000 and ~243,000 sq ft) with potential for up to three more buildings on the PHX 10-11 site (between Broadway Road and MC-85, Bullard Avenue and Litchfield Road), and notes Azure West US 3 launched in Arizona in 2021. City documents cited by DCD describe original intent for five data centers each using direct evaporative cooling at no more than one million gallons per day of water ([DCD, Mar 16 2023](https://www.datacenterdynamics.com/en/news/microsoft-swapping-water-for-air-cooling-at-campus-in-phoenix-arizona/))","sourceUrl":"https://www.datacenterdynamics.com/en/news/microsoft-swapping-water-for-air-cooling-at-campus-in-phoenix-arizona/"},{"label":"2023 air-cooling / wastewater development agreement (reported)","value":"DCD reports the City Council approved an updated development agreement under which buildings after PHX-12 on the PHX 10-11 site must be air-cooled (first three may remain water-cooled), Microsoft committed to a dedicated industrial discharge line by end of August 2024, and Microsoft would pay about $36 million toward an estimated $90 million expansion of the 157th Avenue Wastewater Treatment Plant (plus more than $5 million assurance deposit), with total company wastewater investment described as more than $40 million in related coverage ([DCD, Mar 16 2023](https://www.datacenterdynamics.com/en/news/microsoft-swapping-water-for-air-cooling-at-campus-in-phoenix-arizona/))","sourceUrl":"https://www.datacenterdynamics.com/en/news/microsoft-swapping-water-for-air-cooling-at-campus-in-phoenix-arizona/"}],"reviewStatus":"reviewed","sources":[{"url":"https://mlq.ai/permit-filings/usa/arizona/goodyear/p0013042/","date":"2025-01-01","title":"Microsoft Azure P0013042 air permit filing (Goodyear)","publisher":"MLQ Infrastructure"},{"url":"https://www.goodyearaz.gov/Home/Components/News/News/9847/1549","date":"2023-04-01","title":"Microsoft Builds World-Class Datacenter Campus in Goodyear","publisher":"City of Goodyear"},{"url":"https://www.datacenterdynamics.com/en/news/microsoft-swapping-water-for-air-cooling-at-campus-in-phoenix-arizona/","date":"2023-03-16","title":"Microsoft to swap water for air cooling at campus in Phoenix, Arizona","publisher":"Data Center Dynamics"}],"reviewNote":null,"createdAt":"2026-08-17T20:24:36.059Z","updatedAt":"2026-09-29T05:52:55.930Z","location":{"id":"a0f820aa-b620-4286-a9d5-f57021cf8536","name":"Goodyear","slug":"goodyear-arizona","kind":"city","parentLocationId":"559f49c3-1532-4c6f-b055-4d83a05fb88b","region":"Southwest","lat":33.4672279,"lng":-112.3853489,"reviewStatus":"reviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-17T20:24:35.678Z","updatedAt":"2026-08-21T03:20:12.226Z"},"parties":[{"id":"5a1a17cb-3900-4c49-9114-c678443cfb93","dataCenterId":"a1629c36-66b6-4b2a-b032-15c4882e56f5","companyId":null,"externalName":"Microsoft Azure","role":"operator","structureNotes":null,"createdAt":"2026-08-17T20:24:37.297Z","company":null},{"id":"1de3f711-2dad-40fd-9120-467e43105b94","dataCenterId":"a1629c36-66b6-4b2a-b032-15c4882e56f5","companyId":null,"externalName":"Arizona Public Service (APS)","role":"utility","structureNotes":null,"createdAt":"2026-08-17T20:24:38.077Z","company":null}],"capacityClaims":[{"id":"2021af20-70a1-402e-a5a2-b9973d80f963","dataCenterId":"a1629c36-66b6-4b2a-b032-15c4882e56f5","series":"announced","valueGw":0.263,"asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://www.datacenters.com/microsoft-azure-goodyear-usa-phx70","sourceType":"tracker","evidenceTier":"claimed","supersedesId":null,"note":"Tracker figure for full PHX70 build-out; other trackers cite ~143 MW. PHX-10 and PHX-11 phases reported operational since 2024. Address 3785 Citrus Rd, Goodyear AZ.","createdAt":"2026-08-19T00:14:15.801Z"}],"financialClaims":[],"metricClaims":[],"powerProjects":[],"facilities":[],"incidents":[],"events":[{"id":"5fbcd804-45c5-43f5-8f84-6785bf928d59","dataCenterId":"a1629c36-66b6-4b2a-b032-15c4882e56f5","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"0.263","claimId":"2021af20-70a1-402e-a5a2-b9973d80f963","detail":null,"occurredAt":"2026-08-19T00:14:16.145Z","createdAt":"2026-08-19T00:14:16.145Z"},{"id":"80cf97a8-12d6-4079-b2d8-13e5d3f295f2","dataCenterId":"a1629c36-66b6-4b2a-b032-15c4882e56f5","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"0.263","claimId":"2021af20-70a1-402e-a5a2-b9973d80f963","detail":"claimed · tracker","occurredAt":"2026-08-19T00:14:15.987Z","createdAt":"2026-08-19T00:14:15.987Z"},{"id":"ebaf71bd-d899-4cc2-b7d0-fe3f9625542a","dataCenterId":"a1629c36-66b6-4b2a-b032-15c4882e56f5","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: Arizona Public Service (APS)","occurredAt":"2026-08-17T20:24:38.462Z","createdAt":"2026-08-17T20:24:38.462Z"},{"id":"13d0b49b-3020-4a35-81e7-767f6715a851","dataCenterId":"a1629c36-66b6-4b2a-b032-15c4882e56f5","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"operator: Microsoft Azure","occurredAt":"2026-08-17T20:24:37.685Z","createdAt":"2026-08-17T20:24:37.685Z"},{"id":"de690839-3acb-49f6-bf5a-e10cdced2f20","dataCenterId":"a1629c36-66b6-4b2a-b032-15c4882e56f5","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"0.263","claimId":"f37f1500-f31a-4b74-9576-82e5564bef29","detail":null,"occurredAt":"2026-08-17T20:24:37.054Z","createdAt":"2026-08-17T20:24:37.054Z"},{"id":"48202ad6-151c-4592-8c6b-40be0cf4a51c","dataCenterId":"a1629c36-66b6-4b2a-b032-15c4882e56f5","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"0.263","claimId":"f37f1500-f31a-4b74-9576-82e5564bef29","detail":"reported · journalist_report","occurredAt":"2026-08-17T20:24:36.895Z","createdAt":"2026-08-17T20:24:36.895Z"}],"capacity_picture":{"announced_gw":0.263,"contracted_gw":null,"under_construction_gw":null,"energized_gw":null,"announced_minus_energized_gw":0.263,"by_series":{"announced":{"valueGw":0.263,"asOf":"2025-06-01T00:00:00.000Z","evidenceTier":"claimed","sourceUrl":"https://www.datacenters.com/microsoft-azure-goodyear-usa-phx70"},"contracted":null,"under_construction":null,"energized":null}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Microsoft Goodyear Data Center Campus (PHX70)","url":"https://registry.deploy.report/datacenters/microsoft-goodyear-phx70","address":{"@type":"PostalAddress","addressLocality":"Goodyear"}}}