{"id":"83d09a11-d7f1-4ca9-8ca2-19e9b7e4d17d","slug":"mistral-mgx-bruyeres-le-chatel","name":"MGX/Bpifrance/Nvidia/Mistral AI Campus (Bruyeres-le-Chatel)","aliases":["Europe's largest AI campus","Mistral Eclairion Bruyeres-le-Chatel","France AI gigafactory"],"locationId":"4aee0440-710e-4ceb-86aa-b7a60ea2f255","lat":48.5667,"lng":2.1667,"locationPrecision":"city","landStatus":"private","lifecycleState":"announced","powerSourceMix":"grid","interconnectionQueueStatus":"On the French nuclear grid, but the connection is not yet settled: reporting on the campus states that deployment still depends on power agreements with EDF and RTE alongside land and local authorisations. A first 44 MW phase is tied to the 13,800 GPU build; full capacity is targeted for 2030.","interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"other","waterSourceNotes":"Not published for this site. The operator, Eclairion, commits across its estate to high energy and water efficiency and carbon-free energy, but publishes no cooling method, water source or volume for Bruyeres-le-Chatel specifically, which it lists at 120 MW.","servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Joint venture (MGX, Bpifrance, NVIDIA, Mistral AI) announced 19 May 2025 at the Choose France Summit to build what partners call Europe's largest AI campus, ultimately 1.4GW, in the Paris region near Bruyeres-le-Chatel, Essonne. A smaller ~44MW first data center hosted by Eclairion at the same site is the near-term phase (in service targeted Q2 2026); full-campus construction is slated to begin H2 2026 with operations by 2028. Total campus capex is not publicly disclosed; runs on France's low-carbon (nuclear-heavy) grid.","keyFacts":[{"label":"Joint venture partners","value":"At the Choose France Summit (May 19 2025), Bpifrance, MGX, Mistral AI, and NVIDIA announced a joint venture to build what partners call Europe's largest AI Campus in the Paris region ([Ecole Polytechnique / JV press release](https://www.polytechnique.edu/en/press-room/press-releases/mgx-bpifrance-mistral-ai-and-nvidia-launch-joint-venture-build-europes-largest-ai-campus-france))","sourceUrl":"https://www.polytechnique.edu/en/press-room/press-releases/mgx-bpifrance-mistral-ai-and-nvidia-launch-joint-venture-build-europes-largest-ai-campus-france"},{"label":"Ultimate capacity target (announced)","value":"Partners say the campus is expected to ultimately reach 1.4 GW capacity ([Ecole Polytechnique / JV press release](https://www.polytechnique.edu/en/press-room/press-releases/mgx-bpifrance-mistral-ai-and-nvidia-launch-joint-venture-build-europes-largest-ai-campus-france))","sourceUrl":"https://www.polytechnique.edu/en/press-room/press-releases/mgx-bpifrance-mistral-ai-and-nvidia-launch-joint-venture-build-europes-largest-ai-campus-france"},{"label":"Construction / operations timeline (announced)","value":"Construction expected to begin in H2 2026, with operations launching by 2028 ([Ecole Polytechnique / JV press release](https://www.polytechnique.edu/en/press-room/press-releases/mgx-bpifrance-mistral-ai-and-nvidia-launch-joint-venture-build-europes-largest-ai-campus-france))","sourceUrl":"https://www.polytechnique.edu/en/press-room/press-releases/mgx-bpifrance-mistral-ai-and-nvidia-launch-joint-venture-build-europes-largest-ai-campus-france"},{"label":"Platform scope (announced)","value":"Partners describe a purpose-built intelligence hub for the full AI lifecycle (training, inference, deployment), with exascale-class computing, sovereign cloud integration, and low-carbon hyperscale data centers ([Ecole Polytechnique / JV press release](https://www.polytechnique.edu/en/press-room/press-releases/mgx-bpifrance-mistral-ai-and-nvidia-launch-joint-venture-build-europes-largest-ai-campus-france))","sourceUrl":"https://www.polytechnique.edu/en/press-room/press-releases/mgx-bpifrance-mistral-ai-and-nvidia-launch-joint-venture-build-europes-largest-ai-campus-france"},{"label":"Confirmed ecosystem partners","value":"Confirmed partners named in the JV release include Bouygues, EDF Group, Ecole Polytechnique (Institut Polytechnique de Paris), RTE, and Sipartech ([Ecole Polytechnique / JV press release](https://www.polytechnique.edu/en/press-room/press-releases/mgx-bpifrance-mistral-ai-and-nvidia-launch-joint-venture-build-europes-largest-ai-campus-france))","sourceUrl":"https://www.polytechnique.edu/en/press-room/press-releases/mgx-bpifrance-mistral-ai-and-nvidia-launch-joint-venture-build-europes-largest-ai-campus-france"},{"label":"Near-term Bruyeres-le-Chatel phase (trade press)","value":"Trade press links a smaller near-term Eclairion-hosted facility at Bruyeres-le-Chatel (Essonne) to the broader Paris-region AI campus story; treat site-level MW/GPU counts from secondary coverage as reported, not JV-release figures ([Data Center Dynamics](https://www.datacenterdynamics.com/en/news/mgx-bpifrance-nvidia-and-mistral-ai-plan-14gw-paris-data-center-campus/))","sourceUrl":"https://www.datacenterdynamics.com/en/news/mgx-bpifrance-nvidia-and-mistral-ai-plan-14gw-paris-data-center-campus/"}],"reviewStatus":"reviewed","sources":[{"url":"https://www.polytechnique.edu/en/press-room/press-releases/mgx-bpifrance-mistral-ai-and-nvidia-launch-joint-venture-build-europes-largest-ai-campus-france","date":"2025-05-19","title":"MGX, Bpifrance, Mistral AI, and NVIDIA Launch Joint Venture to Build Europe's Largest AI Campus in France","publisher":"Ecole Polytechnique"},{"url":"https://www.datacenterdynamics.com/en/news/mgx-bpifrance-nvidia-and-mistral-ai-plan-14gw-paris-data-center-campus/","date":"2025-05-20","title":"MGX, Bpifrance, Nvidia, and Mistral AI plan 1.4GW Paris data center campus","publisher":"Data Center Dynamics"},{"url":"https://www.usine-digitale.fr/editorial/mistral-ai-va-ouvrir-son-premier-data-center-en-france.N2227191","date":"2025-02-06","title":"Mistral AI va ouvrir son premier data center en France (Eclairion, Bruyeres-le-Chatel)","publisher":"L'Usine Digitale"},{"url":"https://www.eclairion.com/en/","title":"Eclairion","sourceName":"Eclairion"}],"reviewNote":null,"createdAt":"2026-08-17T18:20:11.009Z","updatedAt":"2026-09-28T07:27:33.674Z","location":{"id":"4aee0440-710e-4ceb-86aa-b7a60ea2f255","name":"Bruyeres-le-Chatel","slug":"bruyeres-le-chatel-essonne","kind":"city","parentLocationId":"b6af81cf-c115-44fb-9c3d-a82533eb9721","region":null,"lat":48.5667,"lng":2.1667,"reviewStatus":"reviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-17T18:20:10.578Z","updatedAt":"2026-08-21T03:20:12.226Z"},"parties":[{"id":"80cad156-5e01-419e-a90e-068e6ea544e5","dataCenterId":"83d09a11-d7f1-4ca9-8ca2-19e9b7e4d17d","companyId":null,"externalName":"MGX","role":"financier","structureNotes":"UAE investment fund; JV partner","createdAt":"2026-08-17T18:20:15.859Z","company":null},{"id":"fa63ca19-2817-4d33-9474-1277ca6205f9","dataCenterId":"83d09a11-d7f1-4ca9-8ca2-19e9b7e4d17d","companyId":null,"externalName":"Bpifrance","role":"financier","structureNotes":"French national investment bank; JV partner","createdAt":"2026-08-17T18:20:16.904Z","company":null},{"id":"b7bf70ad-1bb5-4f4d-8b48-cdbfc1670c7a","dataCenterId":"83d09a11-d7f1-4ca9-8ca2-19e9b7e4d17d","companyId":null,"externalName":"NVIDIA","role":"chip_supplier","structureNotes":"GPU/technology partner; JV partner","createdAt":"2026-08-17T18:20:17.798Z","company":null},{"id":"a234e44b-828a-468b-980a-f02bd798e72e","dataCenterId":"83d09a11-d7f1-4ca9-8ca2-19e9b7e4d17d","companyId":null,"externalName":"Eclairion","role":"developer","structureNotes":"Hosts the Bruyeres-le-Chatel site / first 44MW facility","createdAt":"2026-08-17T18:20:18.757Z","company":null},{"id":"4c3ff089-ef42-4d34-af95-66fe33794ba6","dataCenterId":"83d09a11-d7f1-4ca9-8ca2-19e9b7e4d17d","companyId":"ad8428c3-9c72-4bd4-91b8-16ace0007c09","externalName":"Mistral AI","role":"operator","structureNotes":"Anchor tenant/operator; JV partner","createdAt":"2026-08-17T18:20:14.929Z","company":{"id":"ad8428c3-9c72-4bd4-91b8-16ace0007c09","name":"Mistral AI","slug":"mistral-ai"}},{"id":"04827abe-61fa-4879-bf79-fd62a5c9c1b0","dataCenterId":"83d09a11-d7f1-4ca9-8ca2-19e9b7e4d17d","companyId":null,"externalName":"Bouygues","role":"construction","structureNotes":"Construction partner named in the JV launch.","createdAt":"2026-08-19T00:28:14.373Z","company":null},{"id":"ae664059-61c4-4708-a323-a3cd736207b6","dataCenterId":"83d09a11-d7f1-4ca9-8ca2-19e9b7e4d17d","companyId":null,"externalName":"EDF Group","role":"utility","structureNotes":"Low-carbon energy supply partner for the Campus AI.","createdAt":"2026-08-19T00:28:15.509Z","company":null},{"id":"99b80ffd-f057-4519-8e44-c062ae7f9d6b","dataCenterId":"83d09a11-d7f1-4ca9-8ca2-19e9b7e4d17d","companyId":null,"externalName":"RTE","role":"grid_operator","structureNotes":"French transmission operator handling grid connection.","createdAt":"2026-08-19T00:28:16.619Z","company":null},{"id":"ce3aff97-dc0c-4f8c-9c58-8665898576e0","dataCenterId":"83d09a11-d7f1-4ca9-8ca2-19e9b7e4d17d","companyId":"6ab34159-5546-4815-8247-d4d5bd2b0e8a","externalName":"Fluidstack","role":"operator","structureNotes":"Reported to deliver Mistral's supercomputer at the site","createdAt":"2026-08-17T18:20:19.695Z","company":{"id":"6ab34159-5546-4815-8247-d4d5bd2b0e8a","name":"Fluidstack","slug":"fluidstack"}}],"capacityClaims":[{"id":"6ed26d65-8053-4ed6-baa2-8d2d803ea7fb","dataCenterId":"83d09a11-d7f1-4ca9-8ca2-19e9b7e4d17d","series":"announced","valueGw":1.4,"asOf":"2025-05-19T00:00:00.000Z","sourceUrl":"https://www.polytechnique.edu/en/press-room/press-releases/mgx-bpifrance-mistral-ai-and-nvidia-launch-joint-venture-build-europes-largest-ai-campus-france","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":"Ultimate campus capacity; construction to begin H2 2026, operations by 2028","createdAt":"2026-08-17T18:20:11.830Z"},{"id":"126b254c-ea02-43d1-b8da-6dfee374eeaa","dataCenterId":"83d09a11-d7f1-4ca9-8ca2-19e9b7e4d17d","series":"announced","valueGw":0.044,"asOf":"2025-02-06T00:00:00.000Z","sourceUrl":"https://www.usine-digitale.fr/editorial/mistral-ai-va-ouvrir-son-premier-data-center-en-france.N2227191","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Near-term ~44MW first data center with Eclairion; targeted in service Q2 2026","createdAt":"2026-08-17T18:20:12.736Z"},{"id":"e9ab816b-ddf6-455e-8171-6c329821dfbb","dataCenterId":"83d09a11-d7f1-4ca9-8ca2-19e9b7e4d17d","series":"energized","valueGw":0.044,"asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/mistral-ai-raises-830m-in-debt-financing-for-data-center-in-paris-france/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Operational 44MW Mistral compute node in the Eclairion facility at Bruyeres-le-Chatel, ~18,000 NVIDIA GB200; first node toward 200MW across Europe by 2027.","createdAt":"2026-08-19T00:28:12.293Z"},{"id":"e26f2686-e4ea-4276-ac25-9ac7099ee824","dataCenterId":"83d09a11-d7f1-4ca9-8ca2-19e9b7e4d17d","series":"energized","valueGw":0,"asOf":"2025-05-19T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/mgx-bpifrance-nvidia-and-mistral-ai-plan-14gw-paris-data-center-campus/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"No campus capacity energized at announcement","createdAt":"2026-08-17T18:20:13.589Z"}],"financialClaims":[{"id":"0c64229b-e721-4238-81c1-6cec3eef151c","dataCenterId":"83d09a11-d7f1-4ca9-8ca2-19e9b7e4d17d","kind":"capex","label":"Debt financing for Bruyeres-le-Chatel compute","valueUsd":"830000000","capUsd":null,"conditions":"Debt facility raised by Mistral AI (seven banks) to fund its Nvidia-powered data center near Paris.","asOf":"2026-03-01T00:00:00.000Z","sourceUrl":"https://thenextweb.com/news/mistral-ai-830m-debt-data-centre-paris","sourceType":"journalist_report","evidenceTier":"reported","createdAt":"2026-08-19T00:28:12.828Z"},{"id":"0a066ab2-72c2-4d8c-ab84-6d3956fd74a8","dataCenterId":"83d09a11-d7f1-4ca9-8ca2-19e9b7e4d17d","kind":"investment","label":"Mistral AI debt financing for Nvidia-chip data center near Paris","valueUsd":"830000000","capUsd":null,"conditions":"Compute/chip financing (reported), not full campus capex","asOf":"2025-05-19T00:00:00.000Z","sourceUrl":"https://mlq.ai/news/mistral-ai-raises-830m-debt-financing-for-nvidia-chip-data-center-near-paris/","sourceType":"journalist_report","evidenceTier":"reported","createdAt":"2026-08-17T18:20:14.119Z"}],"metricClaims":[{"id":"9dc12ad6-602b-4b9f-8391-9a3b4050da4a","dataCenterId":"83d09a11-d7f1-4ca9-8ca2-19e9b7e4d17d","metricType":"gpu_count","valueNumeric":18000,"valueText":"18,000 NVIDIA GB200 systems operational at the Bruyeres-le-Chatel node","unit":null,"grantingJurisdiction":null,"asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/mistral-ai-raises-830m-in-debt-financing-for-data-center-in-paris-france/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":null,"createdAt":"2026-08-19T00:28:13.590Z"}],"powerProjects":[],"facilities":[],"incidents":[],"events":[{"id":"776d17c4-4f75-4132-a5bb-0d1a50853b47","dataCenterId":"83d09a11-d7f1-4ca9-8ca2-19e9b7e4d17d","eventType":"party_linked","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"operator: linked externalName \"Fluidstack\" to company fluidstack","occurredAt":"2026-08-31T01:15:10.592Z","createdAt":"2026-08-31T01:15:10.592Z"},{"id":"e8b6e66a-bacc-44da-acad-85d967b5cac5","dataCenterId":"83d09a11-d7f1-4ca9-8ca2-19e9b7e4d17d","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"grid_operator: RTE","occurredAt":"2026-08-19T00:28:16.998Z","createdAt":"2026-08-19T00:28:16.998Z"},{"id":"a8e771fa-d46b-4f2a-b2ed-8b909f92ee13","dataCenterId":"83d09a11-d7f1-4ca9-8ca2-19e9b7e4d17d","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: EDF Group","occurredAt":"2026-08-19T00:28:15.878Z","createdAt":"2026-08-19T00:28:15.878Z"},{"id":"06b2efc1-cddb-4456-9eed-e6c3fedd745e","dataCenterId":"83d09a11-d7f1-4ca9-8ca2-19e9b7e4d17d","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"construction: Bouygues","occurredAt":"2026-08-19T00:28:14.752Z","createdAt":"2026-08-19T00:28:14.752Z"},{"id":"b25328f8-2ea1-4d74-b161-54d29ae09229","dataCenterId":"83d09a11-d7f1-4ca9-8ca2-19e9b7e4d17d","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: Debt financing for Bruyeres-le-Chatel compute","occurredAt":"2026-08-19T00:28:13.210Z","createdAt":"2026-08-19T00:28:13.210Z"},{"id":"09cd1027-33da-471e-a882-64bdf0bc0f79","dataCenterId":"83d09a11-d7f1-4ca9-8ca2-19e9b7e4d17d","eventType":"capacity_changed","series":"energized","oldValue":"0","newValue":"0.044","claimId":"e9ab816b-ddf6-455e-8171-6c329821dfbb","detail":null,"occurredAt":"2026-08-19T00:28:12.599Z","createdAt":"2026-08-19T00:28:12.599Z"},{"id":"41cfd9b1-ac7c-49f0-9bba-2e172947d6b7","dataCenterId":"83d09a11-d7f1-4ca9-8ca2-19e9b7e4d17d","eventType":"claim_recorded","series":"energized","oldValue":null,"newValue":"0.044","claimId":"e9ab816b-ddf6-455e-8171-6c329821dfbb","detail":"reported · journalist_report","occurredAt":"2026-08-19T00:28:12.445Z","createdAt":"2026-08-19T00:28:12.445Z"},{"id":"f796d219-60b2-4376-8893-76c496e11320","dataCenterId":"83d09a11-d7f1-4ca9-8ca2-19e9b7e4d17d","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"operator: Fluidstack","occurredAt":"2026-08-17T18:20:20.094Z","createdAt":"2026-08-17T18:20:20.094Z"},{"id":"f18326c8-a8c7-4b6c-84df-0476c38cfee8","dataCenterId":"83d09a11-d7f1-4ca9-8ca2-19e9b7e4d17d","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: Eclairion","occurredAt":"2026-08-17T18:20:19.201Z","createdAt":"2026-08-17T18:20:19.201Z"},{"id":"d1e9ec37-50e6-481e-91a0-bacf16d86817","dataCenterId":"83d09a11-d7f1-4ca9-8ca2-19e9b7e4d17d","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"chip_supplier: NVIDIA","occurredAt":"2026-08-17T18:20:18.351Z","createdAt":"2026-08-17T18:20:18.351Z"},{"id":"6294ce73-406b-4aa8-830a-19ec7a6cf962","dataCenterId":"83d09a11-d7f1-4ca9-8ca2-19e9b7e4d17d","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"financier: Bpifrance","occurredAt":"2026-08-17T18:20:17.303Z","createdAt":"2026-08-17T18:20:17.303Z"},{"id":"b762569e-f7dc-4329-916c-cc607f5e7da6","dataCenterId":"83d09a11-d7f1-4ca9-8ca2-19e9b7e4d17d","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"financier: MGX","occurredAt":"2026-08-17T18:20:16.404Z","createdAt":"2026-08-17T18:20:16.404Z"},{"id":"c4eb9dfb-a5e2-4a08-a7ad-5fed4b3e9c16","dataCenterId":"83d09a11-d7f1-4ca9-8ca2-19e9b7e4d17d","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"operator: Mistral AI","occurredAt":"2026-08-17T18:20:15.338Z","createdAt":"2026-08-17T18:20:15.338Z"},{"id":"4b8f9467-8d13-4997-8113-e7ee10fa6867","dataCenterId":"83d09a11-d7f1-4ca9-8ca2-19e9b7e4d17d","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"investment: Mistral AI debt financing for Nvidia-chip data center near Paris","occurredAt":"2026-08-17T18:20:14.544Z","createdAt":"2026-08-17T18:20:14.544Z"},{"id":"9399ce79-37f4-4442-ac49-e9bf76a63dec","dataCenterId":"83d09a11-d7f1-4ca9-8ca2-19e9b7e4d17d","eventType":"capacity_changed","series":"energized","oldValue":null,"newValue":"0","claimId":"e26f2686-e4ea-4276-ac25-9ac7099ee824","detail":null,"occurredAt":"2026-08-17T18:20:13.893Z","createdAt":"2026-08-17T18:20:13.893Z"},{"id":"37e03eed-8bb9-4a6e-83e3-2ff09f862536","dataCenterId":"83d09a11-d7f1-4ca9-8ca2-19e9b7e4d17d","eventType":"claim_recorded","series":"energized","oldValue":null,"newValue":"0","claimId":"e26f2686-e4ea-4276-ac25-9ac7099ee824","detail":"reported · journalist_report","occurredAt":"2026-08-17T18:20:13.736Z","createdAt":"2026-08-17T18:20:13.736Z"},{"id":"876ae07f-f395-4926-ae81-89e3593f343b","dataCenterId":"83d09a11-d7f1-4ca9-8ca2-19e9b7e4d17d","eventType":"capacity_changed","series":"announced","oldValue":"1.4","newValue":"0.044","claimId":"126b254c-ea02-43d1-b8da-6dfee374eeaa","detail":null,"occurredAt":"2026-08-17T18:20:13.049Z","createdAt":"2026-08-17T18:20:13.049Z"},{"id":"19660609-4692-4d7b-acb9-470c0594e8f3","dataCenterId":"83d09a11-d7f1-4ca9-8ca2-19e9b7e4d17d","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"0.044","claimId":"126b254c-ea02-43d1-b8da-6dfee374eeaa","detail":"reported · journalist_report","occurredAt":"2026-08-17T18:20:12.893Z","createdAt":"2026-08-17T18:20:12.893Z"},{"id":"3388e35e-34da-4bc7-9631-e7314a3007bc","dataCenterId":"83d09a11-d7f1-4ca9-8ca2-19e9b7e4d17d","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"1.4","claimId":"6ed26d65-8053-4ed6-baa2-8d2d803ea7fb","detail":null,"occurredAt":"2026-08-17T18:20:12.183Z","createdAt":"2026-08-17T18:20:12.183Z"},{"id":"c04f2eb5-65f1-4036-ac5f-6627c9f9f2c2","dataCenterId":"83d09a11-d7f1-4ca9-8ca2-19e9b7e4d17d","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"1.4","claimId":"6ed26d65-8053-4ed6-baa2-8d2d803ea7fb","detail":"claimed · press_release","occurredAt":"2026-08-17T18:20:12.008Z","createdAt":"2026-08-17T18:20:12.008Z"}],"capacity_picture":{"announced_gw":0.044,"contracted_gw":null,"under_construction_gw":null,"energized_gw":0.044,"announced_minus_energized_gw":0,"by_series":{"announced":{"valueGw":0.044,"asOf":"2025-02-06T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://www.usine-digitale.fr/editorial/mistral-ai-va-ouvrir-son-premier-data-center-en-france.N2227191"},"contracted":null,"under_construction":null,"energized":{"valueGw":0.044,"asOf":"2026-06-01T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://www.datacenterdynamics.com/en/news/mistral-ai-raises-830m-in-debt-financing-for-data-center-in-paris-france/"}}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"MGX/Bpifrance/Nvidia/Mistral AI Campus (Bruyeres-le-Chatel)","url":"https://registry.deploy.report/datacenters/mistral-mgx-bruyeres-le-chatel","geo":{"@type":"GeoCoordinates","latitude":48.5667,"longitude":2.1667},"address":{"@type":"PostalAddress","addressLocality":"Bruyeres-le-Chatel"}}}