{"id":"6e1eef61-b5b6-431c-82d3-ff9a9c9bfa29","slug":"nebius-independence-missouri","name":"Nebius Independence AI Factory Campus","aliases":["Nebius Kansas City campus","Eastgate Commerce Center data center","Nebius Jackson County MO"],"locationId":"12a0c7a6-fed0-48c9-b052-8d945a6a1867","lat":null,"lng":null,"locationPrecision":null,"landStatus":"greenfield","lifecycleState":"under_construction","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":null,"expectedEnergizationPrecision":null,"expectedEnergizationMilestone":null,"dedicatedSubstation":null,"gridOperator":"SPP","waterSourceNotes":"Municipal water via city Courtney Bend Water Treatment plant; closed-loop cooling; one-time fill ~1M gal per 200MW building; recurring ~400,000-640,000 gal/year (city FAQ).","servingUtility":null,"acreage":400,"totalBuildingSqft":null,"streetAddress":null,"notes":"Nebius greenfield campus of up to ten buildings on ~400 acres in the Eastgate Commerce Center, planned to reach 1.2 GW. Independence City Council approved a Chapter 100 incentive plan and Taxable Industrial Development Revenue Bonds in March 2026; Nebius broke ground May 12, 2026. Grid served by municipal Independence Power & Light within SPP. Initial energized MW and phasing beyond the first tranche are not disclosed.","keyFacts":[{"label":"Location","value":"About 400 acres in eastern Independence, Missouri; groundbreaking May 12 2026"},{"label":"Capacity (company-claimed)","value":"Up to 1.2 GW across four buildings over five to seven years"},{"label":"Power (company-claimed)","value":"Independence Power & Light (SPP); initial power H2 2026; Nebius pays full upgrade cost."},{"label":"Cooling (company-claimed)","value":"Closed loop; about 1M gallon fill per 200 MW; 400k to 640k gallons a year after"},{"label":"Incentives","value":"Chapter 100 incentive plan approved Mar 2026"},{"label":"Jobs (company-claimed)","value":"About 1,200 construction jobs and 130 permanent; $650M local taxes over 20 years"}],"reviewStatus":"reviewed","sources":[{"url":"https://www.sec.gov/Archives/edgar/data/0001513845/000110465926052948/nbis-20251231x20f.htm","date":"2026-03-31","title":"Nebius Group N.V. Form 20-F FY2025","publisher":"SEC EDGAR"},{"url":"https://www.datacenterdynamics.com/en/news/nebius-breaks-ground-on-400-acre-data-center-campus-in-independence-missouri/","date":"2026-05-12","title":"Nebius breaks ground on 400-acre data center campus in Independence, Missouri","publisher":"DataCenterDynamics"},{"url":"https://www.independencemo.gov/data-center-faqs","date":"2026-03-04","title":"Nebius Data Center FAQs","publisher":"City of Independence, MO"},{"url":"https://nebius.com/newsroom/nebius-breaks-ground-on-gigawatt-scale-ai-factory-in-independence-missouri","date":"2026-05-12","title":"Nebius breaks ground on gigawatt-scale AI factory in Independence, Missouri","publisher":"Nebius"},{"url":"https://nebius.com/independencemo","title":"Nebius x Independence, Missouri","publisher":"Nebius"}],"reviewNote":null,"createdAt":"2026-08-17T20:22:51.351Z","updatedAt":"2026-10-12T23:55:00.655Z","location":{"id":"12a0c7a6-fed0-48c9-b052-8d945a6a1867","name":"Independence","slug":"independence-missouri","kind":"city","parentLocationId":"20f6cd60-f644-412c-86f8-dc7d5d2368a3","region":"Missouri","lat":39.0924792,"lng":-94.4137923,"reviewStatus":"reviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-17T20:22:50.969Z","updatedAt":"2026-08-21T03:20:12.226Z"},"parties":[{"id":"debc2b59-a1f7-40a4-b0ef-e1156f6bcec1","dataCenterId":"6e1eef61-b5b6-431c-82d3-ff9a9c9bfa29","companyId":null,"externalName":"Nebius Group N.V.","role":"operator","structureNotes":"Ticker NBIS","createdAt":"2026-08-17T20:22:52.631Z","company":null},{"id":"fa7ef8b7-fcca-45c2-b17b-0f678a30ace1","dataCenterId":"6e1eef61-b5b6-431c-82d3-ff9a9c9bfa29","companyId":null,"externalName":"Independence Power & Light","role":"utility","structureNotes":"Municipal utility, SPP","createdAt":"2026-08-17T20:22:53.388Z","company":null},{"id":"b07d7ecc-ce2b-4e9b-9503-f056f646022b","dataCenterId":"6e1eef61-b5b6-431c-82d3-ff9a9c9bfa29","companyId":null,"externalName":"Independence Power Partners LP","role":"financier","structureNotes":"Developer/financier of the on-site Blue Valley natural-gas plant.","createdAt":"2026-08-19T00:14:33.284Z","company":null},{"id":"a983612a-c0ed-4b56-9110-6ca5a059e334","dataCenterId":"6e1eef61-b5b6-431c-82d3-ff9a9c9bfa29","companyId":null,"externalName":"United Energy Trading","role":"developer","structureNotes":"Joint-venture partner in Independence Power Partners.","createdAt":"2026-08-19T00:14:34.427Z","company":null},{"id":"36968643-e278-475d-8541-8c51d39a4c28","dataCenterId":"6e1eef61-b5b6-431c-82d3-ff9a9c9bfa29","companyId":null,"externalName":"Exigent Energy","role":"developer","structureNotes":"Joint-venture partner in Independence Power Partners.","createdAt":"2026-08-19T00:14:35.596Z","company":null},{"id":"3104562f-5bb2-46d5-b864-387f5dbe077f","dataCenterId":"6e1eef61-b5b6-431c-82d3-ff9a9c9bfa29","companyId":null,"externalName":"ARCO National Construction","role":"construction","structureNotes":"Named construction partner (groundbreaking release).","createdAt":"2026-08-19T00:14:36.764Z","company":null},{"id":"7db90d46-e471-44c0-bcb7-9ef5ed934874","dataCenterId":"6e1eef61-b5b6-431c-82d3-ff9a9c9bfa29","companyId":"a9609061-00fd-4d9b-9b2d-ce2d772ab825","externalName":null,"role":"chip_supplier","structureNotes":"Named supporter; chip-supply role not quantified.","createdAt":"2026-08-19T00:14:37.930Z","company":{"id":"a9609061-00fd-4d9b-9b2d-ce2d772ab825","name":"NVIDIA","slug":"nvidia"}},{"id":"4621cdb6-0a47-4dc0-bd88-edaea1276217","dataCenterId":"6e1eef61-b5b6-431c-82d3-ff9a9c9bfa29","companyId":null,"externalName":"NextEra Energy","role":"utility","structureNotes":"Interim power supply (~$10.7M contract, Jun 2026-May 2027).","createdAt":"2026-08-19T00:14:39.090Z","company":null},{"id":"2d8d245a-64da-41f4-996a-b598e7a9f85a","dataCenterId":"6e1eef61-b5b6-431c-82d3-ff9a9c9bfa29","companyId":null,"externalName":"Evergy","role":"utility","structureNotes":"Interim power supply (~$5.6M, Jun-Nov 2027).","createdAt":"2026-08-19T00:14:40.269Z","company":null}],"capacityClaims":[{"id":"72a6dfa2-ac30-4ff1-97ad-8ca713dc6cd5","dataCenterId":"6e1eef61-b5b6-431c-82d3-ff9a9c9bfa29","series":"announced","valueGw":1.2,"asOf":"2026-03-04T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/nebius-breaks-ground-on-400-acre-data-center-campus-in-independence-missouri/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Up to 1.2 GW at full buildout; earlier reporting cited ~800 MW. City Council Chapter 100 + IDRB approval is a municipal-docket signal","createdAt":"2026-08-17T20:22:52.081Z"},{"id":"5765cd55-45f1-469e-adf0-a980a9f34499","dataCenterId":"6e1eef61-b5b6-431c-82d3-ff9a9c9bfa29","series":"under_construction","valueGw":0.25,"asOf":"2027-06-01T00:00:00.000Z","sourceUrl":"https://www.govtech.com/artificial-intelligence/independence-mo-to-reopen-old-power-plant-for-ai-data-center","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"First-phase on-site power ~250 MW targeted ~Oct 2027, ramping to ~1.1 GW by 2029 (Blue Valley plant redevelopment).","createdAt":"2026-08-19T00:14:28.539Z"}],"financialClaims":[{"id":"83c3aa79-5dda-4aab-bcb7-426e3708f926","dataCenterId":"6e1eef61-b5b6-431c-82d3-ff9a9c9bfa29","kind":"incentive","label":"PILOT (payments in lieu of taxes)","valueUsd":"651500000","capUsd":null,"conditions":"Projected >$650M over 20-year term to city, school districts and other jurisdictions.","asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://nebius.com/independencemo","sourceType":"company_filing","evidenceTier":"verified","createdAt":"2026-08-19T00:14:30.597Z"},{"id":"87209f62-f2fd-48ce-a96f-c74b68e02280","dataCenterId":"6e1eef61-b5b6-431c-82d3-ff9a9c9bfa29","kind":"capex","label":"Total campus investment","valueUsd":"6600000000","capUsd":null,"conditions":"Nebius's own page says only 'multi-billion-dollar'; $6.6B is journalism-tier.","asOf":"2026-03-01T00:00:00.000Z","sourceUrl":"https://www.kcur.org/politics-elections-and-government/2026-03-03/independence-gives-billions-in-tax-breaks-for-a-massive-data-center-despite-outcry-from-residents","sourceType":"journalist_report","evidenceTier":"reported","createdAt":"2026-08-19T00:14:29.069Z"},{"id":"4640459f-0cd4-42bf-ac19-7dfba59619b8","dataCenterId":"6e1eef61-b5b6-431c-82d3-ff9a9c9bfa29","kind":"tax_abatement","label":"Chapter 100 industrial development incentive","valueUsd":null,"capUsd":null,"conditions":"~20-year abatement on real + personal property with sales-tax exemption on construction materials/equipment; approved by City Council 5-2 on Mar 2-3 2026; ~90% abatement.","asOf":"2026-03-01T00:00:00.000Z","sourceUrl":"https://nebius.com/independencemo","sourceType":"company_filing","evidenceTier":"verified","createdAt":"2026-08-19T00:14:29.836Z"}],"metricClaims":[{"id":"1e4e890b-50ec-4b17-b153-4c52199678b2","dataCenterId":"6e1eef61-b5b6-431c-82d3-ff9a9c9bfa29","metricType":"cooling_type","valueNumeric":null,"valueText":"Closed-loop cooling","unit":null,"grantingJurisdiction":null,"asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://www.independencemo.gov/community-faqs/nebius-data-center-faqs","sourceType":"permit_filing","evidenceTier":"verified","supersedesId":null,"note":null,"createdAt":"2026-08-19T00:14:32.513Z"},{"id":"240de315-6c85-4e56-b706-27a2610bbee0","dataCenterId":"6e1eef61-b5b6-431c-82d3-ff9a9c9bfa29","metricType":"jobs_construction","valueNumeric":1200,"valueText":"~1,200 construction jobs","unit":null,"grantingJurisdiction":null,"asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://nebius.com/newsroom/nebius-breaks-ground-on-gigawatt-scale-ai-factory-in-independence-missouri","sourceType":"press_release","evidenceTier":"verified","supersedesId":null,"note":null,"createdAt":"2026-08-19T00:14:31.750Z"},{"id":"5980c5e6-2de4-4193-89b9-57f9198a6b48","dataCenterId":"6e1eef61-b5b6-431c-82d3-ff9a9c9bfa29","metricType":"jobs_permanent","valueNumeric":130,"valueText":"~130 permanent jobs at full operation","unit":null,"grantingJurisdiction":null,"asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://nebius.com/newsroom/nebius-breaks-ground-on-gigawatt-scale-ai-factory-in-independence-missouri","sourceType":"press_release","evidenceTier":"verified","supersedesId":null,"note":null,"createdAt":"2026-08-19T00:14:32.125Z"}],"powerProjects":[{"id":"4e0d49f7-79c2-4de4-a308-99b040b81061","dataCenterId":"6e1eef61-b5b6-431c-82d3-ff9a9c9bfa29","name":"Blue Valley Power Plant redevelopment","type":"gas","capacityGw":0.4,"lifecycleState":"under_construction","sourceUrl":"https://www.govtech.com/artificial-intelligence/independence-mo-to-reopen-old-power-plant-for-ai-data-center","evidenceTier":"reported","note":"Privately financed natural-gas facility on the retired municipal Blue Valley site; ~15 turbines first phase; ~250 MW by ~Oct 2027, ~1.1 GW by 2029.","createdAt":"2026-08-19T00:14:31.373Z"}],"permits":[{"id":"d5fb58b0-3a2d-4fd7-acc1-15998bd29408","dataCenterId":"6e1eef61-b5b6-431c-82d3-ff9a9c9bfa29","agency":"MoDNR","jurisdiction":"Missouri","kind":"air","permitType":"Construction permit, de minimis (Station 1)","number":"072026-012","applicant":"Independence Power Partners","status":"active","filedDate":null,"decidedDate":"2026-07-31T00:00:00.000Z","docket":null,"regulatedEntityId":null,"sourceUrl":"https://dnr.mo.gov/air/business-industry/air-permits/independence-power-partners-station-1-072026-012","reviewStatus":"reviewed","reviewNote":"Campus link confirmed 2026-11-18: The state issued this air construction permit to Independence Power Partners on July 31, 2026. The City of Independence names that company as the developer of the power plant that will supply the Nebius campus. https://dnr.mo.gov/air/business-industry/air-permits/independence-power-partners-station-1-072026-012 \"City FAQ: \"This project will require at least 800 megawatts (MW) of power, which will be supplied by a new, privately financed facility developed by Independence Power Partners (IPP) at the City's retired Blue Valley Power Plant site.\" MoDNR: \"Independence Power Partners-Station 1, 072026-012\", issued 07/31/2026, Independence, Jackson County, Construction Permit: De Minimis, status Issued.\"","lastCheckedAt":"2026-11-17T00:00:00.000Z","createdAt":"2026-11-18T02:56:41.753Z","updatedAt":"2026-11-18T18:53:18.037Z"}],"facilities":[],"incidents":[],"events":[{"id":"e9512090-77a1-4d19-9c5e-6cb0a11e1b0a","dataCenterId":"6e1eef61-b5b6-431c-82d3-ff9a9c9bfa29","eventType":"permit_recorded","series":null,"oldValue":null,"newValue":"MoDNR 072026-012: active","claimId":null,"detail":"Construction permit, de minimis (Station 1) 072026-012 recorded from https://dnr.mo.gov/air/business-industry/air-permits/independence-power-partners-station-1-072026-012","occurredAt":"2026-11-18T02:56:41.977Z","createdAt":"2026-11-18T02:56:41.977Z"},{"id":"f8d2724c-c982-4aeb-9862-da966337870e","dataCenterId":"6e1eef61-b5b6-431c-82d3-ff9a9c9bfa29","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: Evergy","occurredAt":"2026-08-19T00:14:40.662Z","createdAt":"2026-08-19T00:14:40.662Z"},{"id":"d2e0611a-08ed-461c-ae35-a301daf19eec","dataCenterId":"6e1eef61-b5b6-431c-82d3-ff9a9c9bfa29","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: NextEra Energy","occurredAt":"2026-08-19T00:14:39.475Z","createdAt":"2026-08-19T00:14:39.475Z"},{"id":"aae33517-5142-4031-83bc-a360802eb5db","dataCenterId":"6e1eef61-b5b6-431c-82d3-ff9a9c9bfa29","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"chip_supplier: a9609061-00fd-4d9b-9b2d-ce2d772ab825","occurredAt":"2026-08-19T00:14:38.321Z","createdAt":"2026-08-19T00:14:38.321Z"},{"id":"e023a0c3-5bc5-4b22-bfd0-b0383ea07447","dataCenterId":"6e1eef61-b5b6-431c-82d3-ff9a9c9bfa29","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"construction: ARCO National Construction","occurredAt":"2026-08-19T00:14:37.159Z","createdAt":"2026-08-19T00:14:37.159Z"},{"id":"1d87fdb1-cee6-4cf5-bb32-5776202f41ae","dataCenterId":"6e1eef61-b5b6-431c-82d3-ff9a9c9bfa29","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: Exigent Energy","occurredAt":"2026-08-19T00:14:35.977Z","createdAt":"2026-08-19T00:14:35.977Z"},{"id":"db206269-b33c-41af-b330-9ba3a9f0f0e0","dataCenterId":"6e1eef61-b5b6-431c-82d3-ff9a9c9bfa29","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: United Energy Trading","occurredAt":"2026-08-19T00:14:34.805Z","createdAt":"2026-08-19T00:14:34.805Z"},{"id":"070bcc1e-6630-4082-a2f0-2630eed8e575","dataCenterId":"6e1eef61-b5b6-431c-82d3-ff9a9c9bfa29","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"financier: Independence Power Partners LP","occurredAt":"2026-08-19T00:14:33.660Z","createdAt":"2026-08-19T00:14:33.660Z"},{"id":"79b45e9d-d0eb-4b0e-87e1-56c87760ed2e","dataCenterId":"6e1eef61-b5b6-431c-82d3-ff9a9c9bfa29","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"incentive: PILOT (payments in lieu of taxes)","occurredAt":"2026-08-19T00:14:30.987Z","createdAt":"2026-08-19T00:14:30.987Z"},{"id":"d97f0763-2bf8-4d63-a1f4-70dcdde95156","dataCenterId":"6e1eef61-b5b6-431c-82d3-ff9a9c9bfa29","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"tax_abatement: Chapter 100 industrial development incentive","occurredAt":"2026-08-19T00:14:30.215Z","createdAt":"2026-08-19T00:14:30.215Z"},{"id":"57b83741-18e6-4b86-bbc9-694c0697f6ae","dataCenterId":"6e1eef61-b5b6-431c-82d3-ff9a9c9bfa29","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: Total campus investment","occurredAt":"2026-08-19T00:14:29.450Z","createdAt":"2026-08-19T00:14:29.450Z"},{"id":"0f9d1b73-44f0-43d6-9724-4d4caf5f025e","dataCenterId":"6e1eef61-b5b6-431c-82d3-ff9a9c9bfa29","eventType":"capacity_changed","series":"under_construction","oldValue":null,"newValue":"0.25","claimId":"5765cd55-45f1-469e-adf0-a980a9f34499","detail":null,"occurredAt":"2026-08-19T00:14:28.840Z","createdAt":"2026-08-19T00:14:28.840Z"},{"id":"0a632f3e-dba3-4fe5-b320-60c3cde3dd1d","dataCenterId":"6e1eef61-b5b6-431c-82d3-ff9a9c9bfa29","eventType":"claim_recorded","series":"under_construction","oldValue":null,"newValue":"0.25","claimId":"5765cd55-45f1-469e-adf0-a980a9f34499","detail":"reported · journalist_report","occurredAt":"2026-08-19T00:14:28.690Z","createdAt":"2026-08-19T00:14:28.690Z"},{"id":"90d6f288-ce6e-4cf6-9a4c-5a114ebb2520","dataCenterId":"6e1eef61-b5b6-431c-82d3-ff9a9c9bfa29","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: Independence Power & Light","occurredAt":"2026-08-17T20:22:53.771Z","createdAt":"2026-08-17T20:22:53.771Z"},{"id":"d762821f-1ab1-4fff-a01a-c481b8663054","dataCenterId":"6e1eef61-b5b6-431c-82d3-ff9a9c9bfa29","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"operator: Nebius Group N.V.","occurredAt":"2026-08-17T20:22:53.003Z","createdAt":"2026-08-17T20:22:53.003Z"},{"id":"949fa450-d8b1-428b-8174-21fa79e11605","dataCenterId":"6e1eef61-b5b6-431c-82d3-ff9a9c9bfa29","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"1.2","claimId":"72a6dfa2-ac30-4ff1-97ad-8ca713dc6cd5","detail":null,"occurredAt":"2026-08-17T20:22:52.402Z","createdAt":"2026-08-17T20:22:52.402Z"},{"id":"4c30c4bc-39e9-4f0c-9837-2415c0f6795a","dataCenterId":"6e1eef61-b5b6-431c-82d3-ff9a9c9bfa29","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"1.2","claimId":"72a6dfa2-ac30-4ff1-97ad-8ca713dc6cd5","detail":"reported · journalist_report","occurredAt":"2026-08-17T20:22:52.243Z","createdAt":"2026-08-17T20:22:52.243Z"}],"capacity_picture":{"announced_gw":1.2,"contracted_gw":null,"under_construction_gw":0.25,"energized_gw":null,"announced_minus_energized_gw":1.2,"by_series":{"announced":{"valueGw":1.2,"asOf":"2026-03-04T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://www.datacenterdynamics.com/en/news/nebius-breaks-ground-on-400-acre-data-center-campus-in-independence-missouri/"},"contracted":null,"under_construction":{"valueGw":0.25,"asOf":"2027-06-01T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://www.govtech.com/artificial-intelligence/independence-mo-to-reopen-old-power-plant-for-ai-data-center"},"energized":null}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Nebius Independence AI Factory Campus","url":"https://registry.deploy.report/datacenters/nebius-independence-missouri","address":{"@type":"PostalAddress","addressLocality":"Independence"}}}