{"id":"dee2544a-dedc-4d29-9109-1e969a496373","slug":"nebius-mantsala","name":"Nebius Mäntsälä Data Center","aliases":[],"locationId":"b5f05b0b-6878-45de-9b98-610721565fa7","lat":null,"lng":null,"landStatus":null,"lifecycleState":"partially_energized","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"other","waterSourceNotes":"Free cooling; heat-recovery system recovers ~20,000 MWh/yr, heating equivalent of ~2,500 Finnish homes","servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Nebius's operational Mäntsälä facility is being tripled from about 25 MW to 75 MW to host up to 60,000 GPUs (NVIDIA H100/H200 and Blackwell). It runs at a PUE as low as 1.1 with a heat-recovery system feeding local district heating.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://nebius.com/newsroom/nebius-to-triple-capacity-at-finland-data-center-to-75-mw","title":"Nebius to triple capacity at Finland data center to 75 MW"},{"url":"https://www.datacenter-forum.com/datacenter-forum/nebius-to-triple-capacity-at-finland-data-center-to-75-mw","title":"Nebius to triple capacity at Finland data center to 75 MW"}],"reviewNote":null,"createdAt":"2026-08-19T00:49:38.116Z","updatedAt":"2026-08-19T01:32:36.418Z","location":{"id":"b5f05b0b-6878-45de-9b98-610721565fa7","name":"Mäntsälä","slug":"mantsala-uusimaa","kind":"city","parentLocationId":"b8f7d99e-79e2-4250-af3a-a46c46cba899","region":null,"lat":null,"lng":null,"reviewStatus":"unreviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-19T00:49:37.733Z","updatedAt":"2026-08-19T00:49:37.733Z"},"parties":[{"id":"f2ef899c-205b-4d81-bb02-121f04512a7e","dataCenterId":"dee2544a-dedc-4d29-9109-1e969a496373","companyId":null,"externalName":"Nebius","role":"developer","structureNotes":"AI cloud company (Nasdaq: NBIS); developer and operator","createdAt":"2026-08-19T00:49:41.864Z","company":null},{"id":"212ba279-14cf-466c-9a27-79910f9b9f7d","dataCenterId":"dee2544a-dedc-4d29-9109-1e969a496373","companyId":"a9609061-00fd-4d9b-9b2d-ce2d772ab825","externalName":null,"role":"chip_supplier","structureNotes":"H100/H200 and Blackwell GPUs","createdAt":"2026-08-19T00:49:43.056Z","company":{"id":"a9609061-00fd-4d9b-9b2d-ce2d772ab825","name":"NVIDIA","slug":"nvidia"}}],"capacityClaims":[{"id":"6d565f5b-2dba-4089-98c0-926a09f89e22","dataCenterId":"dee2544a-dedc-4d29-9109-1e969a496373","series":"announced","valueGw":0.075,"asOf":"2024-10-01T00:00:00.000Z","sourceUrl":"https://nebius.com/newsroom/nebius-to-triple-capacity-at-finland-data-center-to-75-mw","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":"Tripling target to 75 MW","createdAt":"2026-08-19T00:49:40.088Z"},{"id":"cdb4b8b9-90fb-4bdf-8cdb-ddef4be89d56","dataCenterId":"dee2544a-dedc-4d29-9109-1e969a496373","series":"energized","valueGw":0.025,"asOf":"2024-06-01T00:00:00.000Z","sourceUrl":"https://nebius.com/newsroom/nebius-to-triple-capacity-at-finland-data-center-to-75-mw","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"Existing operational capacity prior to expansion (~25 MW implied)","createdAt":"2026-08-19T00:49:39.239Z"}],"financialClaims":[{"id":"8f69f28c-4382-45dd-a03d-e28f4e581eb0","dataCenterId":"dee2544a-dedc-4d29-9109-1e969a496373","kind":"capex","label":"European AI infrastructure program (not Mäntsälä-specific)","valueUsd":"1000000000","capUsd":null,"conditions":"More than USD 1B across Europe by mid-2025; not site-specific","asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://nebius.com/newsroom/nebius-to-triple-capacity-at-finland-data-center-to-75-mw","sourceType":"company_filing","evidenceTier":"reported","createdAt":"2026-08-19T01:32:36.798Z"}],"metricClaims":[{"id":"b2d8d76a-fee3-46e0-9618-472a8d5d2778","dataCenterId":"dee2544a-dedc-4d29-9109-1e969a496373","metricType":"cooling_type","valueNumeric":null,"valueText":"liquid cooling with heat recovery (~20,000 MWh/yr); PUE ~1.1","unit":null,"grantingJurisdiction":null,"asOf":"2024-06-01T00:00:00.000Z","sourceUrl":"https://nebius.com/newsroom/nebius-to-triple-capacity-at-finland-data-center-to-75-mw","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":null,"createdAt":"2026-08-19T00:49:41.091Z"},{"id":"4b24c76d-d427-4a00-a737-3bd0c03e5a5b","dataCenterId":"dee2544a-dedc-4d29-9109-1e969a496373","metricType":"gpu_count","valueNumeric":60000,"valueText":"up to 60,000 GPUs (H100/H200/Blackwell)","unit":null,"grantingJurisdiction":null,"asOf":"2024-06-01T00:00:00.000Z","sourceUrl":"https://www.datacenter-forum.com/datacenter-forum/nebius-to-triple-capacity-at-finland-data-center-to-75-mw","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":null,"createdAt":"2026-08-19T00:49:40.708Z"},{"id":"3d569334-e06a-4e12-b66a-0fabd443bfd8","dataCenterId":"dee2544a-dedc-4d29-9109-1e969a496373","metricType":"gpu_count","valueNumeric":60000,"valueText":"Up to 60,000 GPUs (NVIDIA H100/H200, Blackwell)","unit":null,"grantingJurisdiction":null,"asOf":"2024-06-01T00:00:00.000Z","sourceUrl":"https://nebius.com/newsroom/nebius-to-triple-capacity-at-finland-data-center-to-75-mw","sourceType":"company_filing","evidenceTier":"verified","supersedesId":null,"note":null,"createdAt":"2026-08-19T01:32:37.554Z"}],"powerProjects":[],"facilities":[],"incidents":[],"events":[{"id":"c29b6d53-c884-4769-8efd-5f5c5c26dfaf","dataCenterId":"dee2544a-dedc-4d29-9109-1e969a496373","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: European AI infrastructure program (not Mäntsälä-specific)","occurredAt":"2026-08-19T01:32:37.175Z","createdAt":"2026-08-19T01:32:37.175Z"},{"id":"d1330020-84e4-419b-a1d7-260436fe8839","dataCenterId":"dee2544a-dedc-4d29-9109-1e969a496373","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"chip_supplier: a9609061-00fd-4d9b-9b2d-ce2d772ab825","occurredAt":"2026-08-19T00:49:43.451Z","createdAt":"2026-08-19T00:49:43.451Z"},{"id":"54c23536-4d1b-4d25-8c2d-7f0cd5520932","dataCenterId":"dee2544a-dedc-4d29-9109-1e969a496373","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: Nebius","occurredAt":"2026-08-19T00:49:42.268Z","createdAt":"2026-08-19T00:49:42.268Z"},{"id":"28fd2ec6-6d4b-4810-aab1-9218bb1e43ed","dataCenterId":"dee2544a-dedc-4d29-9109-1e969a496373","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"0.075","claimId":"6d565f5b-2dba-4089-98c0-926a09f89e22","detail":null,"occurredAt":"2026-08-19T00:49:40.401Z","createdAt":"2026-08-19T00:49:40.401Z"},{"id":"53e53f33-6062-448d-a706-3da7435befef","dataCenterId":"dee2544a-dedc-4d29-9109-1e969a496373","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"0.075","claimId":"6d565f5b-2dba-4089-98c0-926a09f89e22","detail":"claimed · press_release","occurredAt":"2026-08-19T00:49:40.247Z","createdAt":"2026-08-19T00:49:40.247Z"},{"id":"5538003e-52a4-4150-8d47-1b40e5c06451","dataCenterId":"dee2544a-dedc-4d29-9109-1e969a496373","eventType":"capacity_changed","series":"energized","oldValue":null,"newValue":"0.025","claimId":"cdb4b8b9-90fb-4bdf-8cdb-ddef4be89d56","detail":null,"occurredAt":"2026-08-19T00:49:39.554Z","createdAt":"2026-08-19T00:49:39.554Z"},{"id":"a08ac5e5-9b20-4f60-8005-ebbb5d9bda34","dataCenterId":"dee2544a-dedc-4d29-9109-1e969a496373","eventType":"claim_recorded","series":"energized","oldValue":null,"newValue":"0.025","claimId":"cdb4b8b9-90fb-4bdf-8cdb-ddef4be89d56","detail":"reported · press_release","occurredAt":"2026-08-19T00:49:39.403Z","createdAt":"2026-08-19T00:49:39.403Z"}],"capacity_picture":{"announced_gw":0.075,"contracted_gw":null,"under_construction_gw":null,"energized_gw":0.025,"announced_minus_energized_gw":0.049999999999999996,"by_series":{"announced":{"valueGw":0.075,"asOf":"2024-10-01T00:00:00.000Z","evidenceTier":"claimed","sourceUrl":"https://nebius.com/newsroom/nebius-to-triple-capacity-at-finland-data-center-to-75-mw"},"contracted":null,"under_construction":null,"energized":{"valueGw":0.025,"asOf":"2024-06-01T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://nebius.com/newsroom/nebius-to-triple-capacity-at-finland-data-center-to-75-mw"}}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Nebius Mäntsälä Data Center","url":"https://registry.deploy.report/datacenters/nebius-mantsala","address":{"@type":"PostalAddress","addressLocality":"Mäntsälä"}}}