{"id":"8816a42d-177f-434d-9475-db84f39e535c","slug":"nscale-barstow-texas","name":"Nscale Barstow AI Data Center (Microsoft)","aliases":[],"locationId":"48f7f695-2b0f-4053-bc9f-0f147c1a158f","lat":null,"lng":null,"landStatus":null,"lifecycleState":"under_construction","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"gridOperator":"ERCOT","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Nscale, an Nvidia-backed AI infrastructure firm, is leasing a West Texas data center from Bitcoin miner Ionic Digital in Barstow to deliver 240 MW of Nvidia AI capacity to Microsoft, with phased delivery starting Q3 2026 and plans to scale to about 1.2 GW. Microsoft holds an option on a further 700 MW phase from late 2027, within a Nscale-Microsoft compute deal valued up to about $14 billion.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://tech.eu/2026/03/17/nscale-snaps-up-major-us-data-centre-site-inks-ai-compute-deal-with-microsoft/","title":"Tech.eu: Nscale US site and Microsoft compute deal"},{"url":"https://www.datacenterdynamics.com/en/news/nscale-to-supply-microsoft-with-additional-100000-nvidia-gpus-in-us-and-europe/","title":"DCD: Nscale to supply Microsoft with Nvidia GPUs"}],"reviewNote":null,"createdAt":"2026-08-19T00:48:37.676Z","updatedAt":"2026-08-19T00:48:38.052Z","location":{"id":"48f7f695-2b0f-4053-bc9f-0f147c1a158f","name":"Barstow","slug":"barstow-texas","kind":"city","parentLocationId":"45f67762-10f4-4255-be84-45c73efe25f9","region":null,"lat":31.4614691,"lng":-103.394632,"reviewStatus":"unreviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-19T00:48:37.292Z","updatedAt":"2026-08-19T01:24:24.610Z"},"parties":[{"id":"448c68b0-7ac7-43bb-b2d5-9e26ad6a6c33","dataCenterId":"8816a42d-177f-434d-9475-db84f39e535c","companyId":null,"externalName":"Nscale","role":"operator","structureNotes":"AI infrastructure operator leasing the site","createdAt":"2026-08-19T00:48:41.350Z","company":null},{"id":"897788aa-ac41-4baf-b29c-8af253b81429","dataCenterId":"8816a42d-177f-434d-9475-db84f39e535c","companyId":"b8670b58-67f2-4b87-9b46-9e16588dc1e6","externalName":null,"role":"tenant","structureNotes":"Offtaker of Nvidia AI capacity","createdAt":"2026-08-19T00:48:42.497Z","company":{"id":"b8670b58-67f2-4b87-9b46-9e16588dc1e6","name":"Microsoft","slug":"microsoft"}},{"id":"722b9d88-1dd6-41a2-b215-16e5de38bab3","dataCenterId":"8816a42d-177f-434d-9475-db84f39e535c","companyId":null,"externalName":"Ionic Digital","role":"land_owner","structureNotes":"Owner of the Barstow site leased to Nscale","createdAt":"2026-08-19T00:48:43.691Z","company":null},{"id":"64d5cf97-033d-4eb5-a58b-2a1772edd576","dataCenterId":"8816a42d-177f-434d-9475-db84f39e535c","companyId":"a9609061-00fd-4d9b-9b2d-ce2d772ab825","externalName":null,"role":"chip_supplier","structureNotes":"GB300 GPUs","createdAt":"2026-08-19T01:33:11.017Z","company":{"id":"a9609061-00fd-4d9b-9b2d-ce2d772ab825","name":"NVIDIA","slug":"nvidia"}}],"capacityClaims":[{"id":"d397bedc-36d7-445d-8c0f-d823a8bf3c85","dataCenterId":"8816a42d-177f-434d-9475-db84f39e535c","series":"announced","valueGw":1.2,"asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://tech.eu/2026/03/17/nscale-snaps-up-major-us-data-centre-site-inks-ai-compute-deal-with-microsoft/","sourceType":"journalist_report","evidenceTier":"claimed","supersedesId":null,"note":"Plan to scale site footprint to ~1.2 GW; Microsoft option on +700 MW from late 2027","createdAt":"2026-08-19T00:48:39.648Z"},{"id":"2f7a8edd-e64f-4048-aa70-33f605358511","dataCenterId":"8816a42d-177f-434d-9475-db84f39e535c","series":"announced","valueGw":0.7,"asOf":"2025-10-01T00:00:00.000Z","sourceUrl":"https://www.nscale.com/press-releases/nscale-microsoft-2025","sourceType":"company_filing","evidenceTier":"reported","supersedesId":null,"note":"Microsoft option on a second phase of 700 MW starting late 2027; Nscale targets scaling footprint to 1.2 GW over time.","createdAt":"2026-08-19T01:33:09.733Z"},{"id":"783c207f-6260-439e-806d-cebca82be7fc","dataCenterId":"8816a42d-177f-434d-9475-db84f39e535c","series":"contracted","valueGw":0.24,"asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://tech.eu/2026/03/17/nscale-snaps-up-major-us-data-centre-site-inks-ai-compute-deal-with-microsoft/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"240 MW phased delivery to Microsoft starting Q3 2026","createdAt":"2026-08-19T00:48:38.739Z"}],"financialClaims":[{"id":"2646c291-7833-45c7-b173-565d9da1525c","dataCenterId":"8816a42d-177f-434d-9475-db84f39e535c","kind":"capex","label":"Nscale-Microsoft AI compute contract (up to)","valueUsd":"14000000000","capUsd":"14000000000","conditions":"Contract value stated up to ~$14B; not campus construction cost","asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://tech.eu/2026/03/17/nscale-snaps-up-major-us-data-centre-site-inks-ai-compute-deal-with-microsoft/","sourceType":"journalist_report","evidenceTier":"reported","createdAt":"2026-08-19T00:48:40.199Z"}],"metricClaims":[{"id":"a509e813-64c2-4aa5-a1c5-b488606887ba","dataCenterId":"8816a42d-177f-434d-9475-db84f39e535c","metricType":"gpu_count","valueNumeric":104000,"valueText":"Approximately 104,000 NVIDIA GB300 GPUs at the Texas campus","unit":null,"grantingJurisdiction":null,"asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://www.nscale.com/press-releases/nscale-microsoft-2025","sourceType":"company_filing","evidenceTier":"verified","supersedesId":null,"note":null,"createdAt":"2026-08-19T01:33:10.266Z"}],"powerProjects":[],"facilities":[],"incidents":[],"events":[{"id":"ae964f2b-a4f9-4858-a658-a8094057e4d8","dataCenterId":"8816a42d-177f-434d-9475-db84f39e535c","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"chip_supplier: a9609061-00fd-4d9b-9b2d-ce2d772ab825","occurredAt":"2026-08-19T01:33:11.389Z","createdAt":"2026-08-19T01:33:11.389Z"},{"id":"7e8377ab-f4cf-4ddd-bc50-e55fe488e67d","dataCenterId":"8816a42d-177f-434d-9475-db84f39e535c","eventType":"capacity_changed","series":"announced","oldValue":"1.2","newValue":"0.7","claimId":"2f7a8edd-e64f-4048-aa70-33f605358511","detail":null,"occurredAt":"2026-08-19T01:33:10.038Z","createdAt":"2026-08-19T01:33:10.038Z"},{"id":"d4f87521-e2ef-425c-a352-acda9f01fd3e","dataCenterId":"8816a42d-177f-434d-9475-db84f39e535c","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"0.7","claimId":"2f7a8edd-e64f-4048-aa70-33f605358511","detail":"reported · company_filing","occurredAt":"2026-08-19T01:33:09.884Z","createdAt":"2026-08-19T01:33:09.884Z"},{"id":"de3aa159-34e7-4d67-87af-870fb8e71b0e","dataCenterId":"8816a42d-177f-434d-9475-db84f39e535c","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"land_owner: Ionic Digital","occurredAt":"2026-08-19T00:48:44.084Z","createdAt":"2026-08-19T00:48:44.084Z"},{"id":"ea3686c4-ce33-4a02-8b37-3032b53dcf5b","dataCenterId":"8816a42d-177f-434d-9475-db84f39e535c","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"tenant: b8670b58-67f2-4b87-9b46-9e16588dc1e6","occurredAt":"2026-08-19T00:48:42.880Z","createdAt":"2026-08-19T00:48:42.880Z"},{"id":"8706358a-9cfe-4992-918f-5884476f9183","dataCenterId":"8816a42d-177f-434d-9475-db84f39e535c","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"operator: Nscale","occurredAt":"2026-08-19T00:48:41.736Z","createdAt":"2026-08-19T00:48:41.736Z"},{"id":"7b34e1c4-c36b-4767-a887-1343a0be0203","dataCenterId":"8816a42d-177f-434d-9475-db84f39e535c","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: Nscale-Microsoft AI compute contract (up to)","occurredAt":"2026-08-19T00:48:40.580Z","createdAt":"2026-08-19T00:48:40.580Z"},{"id":"6580be02-c5b8-4e29-9d79-da6672c79e59","dataCenterId":"8816a42d-177f-434d-9475-db84f39e535c","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"1.2","claimId":"d397bedc-36d7-445d-8c0f-d823a8bf3c85","detail":null,"occurredAt":"2026-08-19T00:48:39.961Z","createdAt":"2026-08-19T00:48:39.961Z"},{"id":"df18d67b-a848-4c21-8fb6-5d710c2d0c6c","dataCenterId":"8816a42d-177f-434d-9475-db84f39e535c","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"1.2","claimId":"d397bedc-36d7-445d-8c0f-d823a8bf3c85","detail":"claimed · journalist_report","occurredAt":"2026-08-19T00:48:39.801Z","createdAt":"2026-08-19T00:48:39.801Z"},{"id":"c03c16a2-cb5c-4c24-9873-16bdc68cf5f0","dataCenterId":"8816a42d-177f-434d-9475-db84f39e535c","eventType":"capacity_changed","series":"contracted","oldValue":null,"newValue":"0.24","claimId":"783c207f-6260-439e-806d-cebca82be7fc","detail":null,"occurredAt":"2026-08-19T00:48:39.045Z","createdAt":"2026-08-19T00:48:39.045Z"},{"id":"ad57db4a-9367-4e1a-9e59-279067a3c2fc","dataCenterId":"8816a42d-177f-434d-9475-db84f39e535c","eventType":"claim_recorded","series":"contracted","oldValue":null,"newValue":"0.24","claimId":"783c207f-6260-439e-806d-cebca82be7fc","detail":"reported · journalist_report","occurredAt":"2026-08-19T00:48:38.894Z","createdAt":"2026-08-19T00:48:38.894Z"}],"capacity_picture":{"announced_gw":0.7,"contracted_gw":0.24,"under_construction_gw":null,"energized_gw":null,"announced_minus_energized_gw":0.7,"by_series":{"announced":{"valueGw":0.7,"asOf":"2025-10-01T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://www.nscale.com/press-releases/nscale-microsoft-2025"},"contracted":{"valueGw":0.24,"asOf":"2026-06-01T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://tech.eu/2026/03/17/nscale-snaps-up-major-us-data-centre-site-inks-ai-compute-deal-with-microsoft/"},"under_construction":null,"energized":null}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Nscale Barstow AI Data Center (Microsoft)","url":"https://registry.deploy.report/datacenters/nscale-barstow-texas","address":{"@type":"PostalAddress","addressLocality":"Barstow"}}}