{"id":"3bee5e2d-5a19-429a-aa8a-f7c0def619f5","slug":"nscale-monarch-compute-campus","name":"Monarch Compute Campus","aliases":[],"locationId":"0c575b20-f40f-4601-80e6-e968e0e5065c","lat":null,"lng":null,"locationPrecision":null,"landStatus":null,"lifecycleState":"announced","powerSourceMix":null,"interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":null,"waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Acquired by nscale for US expansion per Wikipedia. Site is listed as coming online on the nscale data-centers page.","keyFacts":[{"label":"Mason County scale / Phase 1 framing (primary Nscale)","value":"Nscale's Monarch page places the campus in Mason County, West Virginia on more than 2,250 acres, describes Phase 1 as engineered to host 1.35 GW of AI computing capacity with delivery targeted by early 2028, and states a multi-phase expansion path to 8 GW+ with more than $20 billion in planned capital investment. Frame GW and dollar figures as developer-stated plans, not energized capacity ([Nscale Monarch](https://www.nscale.com/ai-infrastructure/monarch))","sourceUrl":"https://www.nscale.com/ai-infrastructure/monarch"},{"label":"On-site AI microgrid / closed-loop cooling (primary Nscale)","value":"Nscale says Monarch is the first-ever state-certified Artificial Intelligence (AI) Microgrid in the United States, developed with NVIDIA and Caterpillar, generates all of its own power on-site independent of the public grid, and cools with closed-loop systems that do not use municipal drinking water. Treat microgrid certification and water claims as operator statements ([Nscale Monarch](https://www.nscale.com/ai-infrastructure/monarch))","sourceUrl":"https://www.nscale.com/ai-infrastructure/monarch"},{"label":"AIPCorp acquisition / Microsoft LOI (reported DCD)","value":"Data Center Dynamics reported (Mar 17 2026) that Nscale agreed to acquire American Intelligence & Power Corporation including the up to 8 GW Monarch campus, and signed a letter of intent with Microsoft for 1.35 GW of AI compute on Nvidia Vera Rubin NVL72 GPUs in multiple tranches beginning late 2027. DCD notes LOIs are generally not legally binding. The same report says first-phase power of 2 GW is expected online by 2028 with Caterpillar G3500 gas gen-sets. Frame as reported deal and LOI terms, not a completed offtake ([DCD, Mar 17 2026](https://www.datacenterdynamics.com/en/news/nscale-acquires-8gw-monarch-compute-campus-microsoft-signs-on-for-135gw-of-compute/))","sourceUrl":"https://www.datacenterdynamics.com/en/news/nscale-acquires-8gw-monarch-compute-campus-microsoft-signs-on-for-135gw-of-compute/"}],"reviewStatus":"reviewed","sources":[{"url":"https://en.wikipedia.org/wiki/Nscale","title":"Monarch Compute Campus — nscale facility"},{"url":"https://www.nscale.com/ai-infrastructure/monarch","title":"Monarch Compute Campus West Virginia","publisher":"Nscale"},{"url":"https://www.datacenterdynamics.com/en/news/nscale-acquires-8gw-monarch-compute-campus-microsoft-signs-on-for-135gw-of-compute/","date":"2026-03-17","title":"Nscale acquires 8GW Monarch Compute Campus, Microsoft signs on for 1.35GW of compute","publisher":"Data Center Dynamics"}],"reviewNote":null,"createdAt":"2026-08-28T02:09:43.352Z","updatedAt":"2026-09-29T09:50:47.649Z","location":{"id":"0c575b20-f40f-4601-80e6-e968e0e5065c","name":"Wharncliffe","slug":"wharncliffe-west-virginia","kind":"city","parentLocationId":"c1dbd649-7913-4a14-8ec6-7669d3951a5a","region":"Virginia","lat":37.5553869,"lng":-81.9656769,"reviewStatus":"reviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-19T23:21:24.395Z","updatedAt":"2026-08-21T03:20:12.226Z"},"parties":[{"id":"5e55713a-fcdb-4040-b5ee-4818a2e0bb85","dataCenterId":"3bee5e2d-5a19-429a-aa8a-f7c0def619f5","companyId":"51b8d117-30f7-458b-a25a-119184c9cc05","externalName":null,"role":"developer","structureNotes":null,"createdAt":"2026-08-28T02:09:43.759Z","company":{"id":"51b8d117-30f7-458b-a25a-119184c9cc05","name":"Nscale","slug":"nscale"}}],"capacityClaims":[],"financialClaims":[],"metricClaims":[],"powerProjects":[],"facilities":[],"incidents":[],"events":[],"capacity_picture":{"announced_gw":null,"contracted_gw":null,"under_construction_gw":null,"energized_gw":null,"announced_minus_energized_gw":null,"by_series":{"announced":null,"contracted":null,"under_construction":null,"energized":null}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Monarch Compute Campus","url":"https://registry.deploy.report/datacenters/nscale-monarch-compute-campus","address":{"@type":"PostalAddress","addressLocality":"Wharncliffe"}}}