{"id":"5455c475-e688-4e47-b8a6-70b2a6f6c5aa","slug":"nscale-texas-campus","name":"Nscale Texas AI Campus (Microsoft)","aliases":["Nscale Texas","Nscale Ionic Digital Texas campus"],"locationId":"0a3b2422-6634-4ddd-a8f7-ed9402f2249f","lat":null,"lng":null,"locationPrecision":null,"landStatus":null,"lifecycleState":"energized","powerSourceMix":null,"interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":null,"waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Nscale Texas hyperscale AI campus for Microsoft: ~240 MW / ~104,000 NVIDIA GB300 GPUs from Q3 2026 per Nscale Oct 15 2025 release; leased from Ionic Digital with a claimed path to 1.2 GW and a Microsoft option on a further 700 MW from late 2027. Specific city not named in that release; registry also tracks [nscale-barstow-texas](/datacenters/nscale-barstow-texas) for the Barstow/Ward County Ionic Digital site (likely the same campus; merge held).","keyFacts":[{"label":"IT capacity (announced)","value":"Approximately 240 MW hyperscale AI campus in Texas delivering ~104,000 NVIDIA GB300 GPUs to Microsoft from Q3 2026 ([Nscale, Oct 15 2025](https://www.nscale.com/press-releases/nscale-microsoft-2025))","sourceUrl":"https://www.nscale.com/press-releases/nscale-microsoft-2025"},{"label":"Landlord","value":"Site leased from Ionic Digital; Nscale plans to scale footprint to 1.2 GW over time, with Microsoft option on a second 700 MW phase from late 2027 ([Nscale](https://www.nscale.com/press-releases/nscale-microsoft-2025))","sourceUrl":"https://www.nscale.com/press-releases/nscale-microsoft-2025"},{"label":"Overlap HOLD","value":"Likely the same campus as [nscale-barstow-texas](/datacenters/nscale-barstow-texas) (Barstow / Ward County, Ionic Digital). Merge held for Ben pending confirmation they are one site vs two."}],"reviewStatus":"reviewed","sources":[{"url":"https://www.nscale.com/","title":"Texas campus — nscale facility"},{"url":"https://www.nscale.com/press-releases/nscale-microsoft-2025","date":"2025-10-15","title":"Nscale Contracts ~200,000 NVIDIA GB300 GPUs with Microsoft","publisher":"Nscale"}],"reviewNote":null,"createdAt":"2026-08-28T02:09:44.163Z","updatedAt":"2026-09-28T03:10:28.020Z","location":{"id":"0a3b2422-6634-4ddd-a8f7-ed9402f2249f","name":"Naval Air Station Corpus Christi, Texas","slug":"nas-corpus-christi-texas-usa","kind":"city","parentLocationId":null,"region":"Southwest","lat":27.6631193,"lng":-97.2874205,"reviewStatus":"reviewed","aliases":["Naval Air Station Corpus Christi"],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-08T22:29:21.304Z","updatedAt":"2026-10-10T01:26:31.289Z"},"parties":[{"id":"8d176c39-c9f1-4b4e-b8eb-475d38e4eecf","dataCenterId":"5455c475-e688-4e47-b8a6-70b2a6f6c5aa","companyId":"51b8d117-30f7-458b-a25a-119184c9cc05","externalName":null,"role":"developer","structureNotes":null,"createdAt":"2026-08-28T02:09:44.564Z","company":{"id":"51b8d117-30f7-458b-a25a-119184c9cc05","name":"Nscale","slug":"nscale"}}],"capacityClaims":[],"financialClaims":[],"metricClaims":[],"powerProjects":[],"facilities":[],"incidents":[],"events":[],"capacity_picture":{"announced_gw":null,"contracted_gw":null,"under_construction_gw":null,"energized_gw":null,"announced_minus_energized_gw":null,"by_series":{"announced":null,"contracted":null,"under_construction":null,"energized":null}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Nscale Texas AI Campus (Microsoft)","url":"https://registry.deploy.report/datacenters/nscale-texas-campus","address":{"@type":"PostalAddress","addressLocality":"Naval Air Station Corpus Christi, Texas"}}}