{"id":"25b8834d-2433-4ff8-a6dd-87c57d598562","slug":"oleary-stratos-hansel-valley-box-elder","name":"Stratos Project (O'Leary Digital) AI Data Center & Energy Campus","aliases":["Stratos","O'Leary Digital Hansel Valley"],"locationId":"7a4f1b47-88f5-4ffe-87cc-d0b4088ffe9c","lat":null,"lng":null,"locationPrecision":null,"landStatus":"greenfield","lifecycleState":"announced","powerSourceMix":"behind_the_meter_gas","interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"WECC","waterSourceNotes":"Off-grid campus using closed-loop chilling plus dry (air-based) cooling with no continuous water draw; water only for one-time system fill and minor maintenance. Water purchased from private landowners' existing agricultural water rights, explicitly not from the Great Salt Lake (Utah Gov Office FAQ). A water-right change application was filed Mar 25, 2026 and withdrawn May 6, 2026 with intent to refile.","servingUtility":null,"acreage":40000,"totalBuildingSqft":null,"streetAddress":null,"notes":"Proposed ~40,000-acre self-powered AI campus in Hansel/Locomotive Valley (unincorporated Box Elder County) backed by Kevin O'Leary's O'Leary Digital and Utah's Military Installation Development Authority (MIDA); Box Elder commissioners approved the project area 2026-05-04. Phase 1 targets ~3 GW with a 9 GW full buildout, all from on-site natural gas fed by the Ruby Pipeline via a Tallgrass deal. Early stage: no air permit, financing close, or construction start confirmed, and water/environmental review remains contested.","keyFacts":[{"label":"MIDA + Box Elder project-area votes (primary Utah FAQ)","value":"A Utah Governor's Office FAQ states the Military Installation Development Authority (MIDA) Board approved creation of the Stratos Project Area in western Box Elder County on April 24 2026, and the Box Elder County Commission approved an interlocal agreement and resolution on May 4 2026. The FAQ stresses those votes create a project area and do not approve the full build ([Utah Governor FAQ, Stratos Project](https://governor.utah.gov/wp-content/uploads/FAQ-on-Stratos-Project.pdf))","sourceUrl":"https://governor.utah.gov/wp-content/uploads/FAQ-on-Stratos-Project.pdf"},{"label":"40,000-acre project area / on-site power (primary Utah FAQ)","value":"The same FAQ describes a roughly 40,000-acre project area where most acres would remain undeveloped, with the actual data-center footprint a fraction of that area, and states the development would produce all power on site rather than draw from the existing grid. Water-rights change applications and air-quality notices were still outstanding as of the FAQ text ([Utah Governor FAQ, Stratos Project](https://governor.utah.gov/wp-content/uploads/FAQ-on-Stratos-Project.pdf))","sourceUrl":"https://governor.utah.gov/wp-content/uploads/FAQ-on-Stratos-Project.pdf"},{"label":"Full-build electricity claim (reported CSMonitor)","value":"The Christian Science Monitor reported (Sep 1 2026) that at full build the Stratos Project estimates it would consume 9 gigawatts of electricity, more than twice the amount used to power the rest of Utah, and that O'Leary-backed plans renamed Hansel Valley as Wonder Valley. Frame the 9 GW figure as a project estimate reported by CSMonitor, not a utility interconnection award ([Christian Science Monitor, Sep 1 2026](https://www.csmonitor.com/Environment/2026/0901/utah-data-centers-stratos-project))","sourceUrl":"https://www.csmonitor.com/Environment/2026/0901/utah-data-centers-stratos-project"}],"reviewStatus":"reviewed","sources":[{"url":"https://utahnewsdispatch.com/2026/05/04/box-elder-commissioners-approve-data-center/","date":"2026-05-04","title":"Hundreds cry out as Box Elder commissioners wave in massive data center","publisher":"Utah News Dispatch"},{"url":"https://www.sltrib.com/news/2026/05/04/hyperscale-data-center-project/","date":"2026-05-04","title":"Hyperscale data center project in Utah: Here's what we know ahead of the Box Elder County vote","publisher":"Salt Lake Tribune"},{"url":"https://governor.utah.gov/wp-content/uploads/FAQ-on-Stratos-Project.pdf","date":"2026-05-01","title":"FAQ on Stratos Project","publisher":"Utah Governor's Office"},{"url":"https://www.csmonitor.com/Environment/2026/0901/utah-data-centers-stratos-project","date":"2026-09-01","title":"Utah planned the world's biggest data center. Then came the bipartisan pushback.","publisher":"Christian Science Monitor"}],"reviewNote":null,"createdAt":"2026-08-17T20:25:32.933Z","updatedAt":"2026-09-29T07:44:43.570Z","location":{"id":"7a4f1b47-88f5-4ffe-87cc-d0b4088ffe9c","name":"Hansel Valley","slug":"hansel-valley-utah","kind":"city","parentLocationId":"d4c6c7ee-123a-4e8a-b272-47962ebad057","region":"Utah","lat":41.8421103,"lng":-112.6193566,"reviewStatus":"reviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-17T20:25:32.554Z","updatedAt":"2026-08-21T03:20:12.226Z"},"parties":[{"id":"a04b4c40-4121-4cb7-b58e-a4f1e88dc105","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","companyId":null,"externalName":"O'Leary Digital","role":"developer","structureNotes":"Kevin O'Leary-backed; partnered with Utah MIDA project area","createdAt":"2026-08-17T20:25:34.597Z","company":null},{"id":"161bed80-fbbb-4eac-a41c-bdc79b6e2f42","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","companyId":null,"externalName":"Military Installation Development Authority (MIDA)","role":"developer","structureNotes":"Utah state agency sponsoring the project area","createdAt":"2026-08-17T20:25:35.359Z","company":null},{"id":"38829e97-e782-4476-bc9c-99e40f9585f9","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","companyId":null,"externalName":"Tallgrass Energy","role":"utility","structureNotes":"Prospective natural gas service via Ruby Pipeline connection","createdAt":"2026-08-17T20:25:36.110Z","company":null},{"id":"011f9e07-b00c-4171-afcb-e31816e9aa45","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","companyId":null,"externalName":"O'Leary Ventures","role":"developer","structureNotes":"Kevin O'Leary's investment firm and parent of O'Leary Digital; CEO Paul Palandjian publicly stated the >$4B Phase 1 and ~$20B early-phase capex figures. Kevin O'Leary (person) is the public backer making the larger multi-GW / $100B verbal claims.","createdAt":"2026-08-19T00:16:22.056Z","company":null}],"capacityClaims":[{"id":"817d8de2-3e71-47c6-b291-dfeab7fd5579","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","series":"announced","valueGw":9,"asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://www.midaut.org/stratos","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"Approximate full-buildout on-site generation per MIDA Stratos Project Area page. Journalism (SLTrib) cites a 7.5-9 GW full-buildout range; more than double Utah's ~4 GW average statewide demand.","createdAt":"2026-08-19T00:16:13.878Z"},{"id":"c418f8e0-d841-46f6-b796-ebf13fb3b981","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","series":"announced","valueGw":0.5,"asOf":"2026-05-07T00:00:00.000Z","sourceUrl":"https://www.utahmoneywatch.com/the-real-money-behind-stratos-oleary-ventures-pegs-phase-1-at-more-than-4-billion-with-20-billion-of-expenditures-in-its-early-phases/","sourceType":"journalist_report","evidenceTier":"claimed","supersedesId":null,"note":"Initial Phase 1 sized at ~500 MW per O'Leary Ventures CEO Paul Palandjian, scaling toward 3 GW in early phases.","createdAt":"2026-08-19T00:16:14.716Z"},{"id":"1b013380-f525-486c-87b0-c1d2aefeafa3","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","series":"announced","valueGw":3,"asOf":"2026-05-04T00:00:00.000Z","sourceUrl":"https://utahnewsdispatch.com/2026/05/04/box-elder-commissioners-approve-data-center/","sourceType":"county_docket","evidenceTier":"claimed","supersedesId":null,"note":"Phase 1 commitment ~3 GW; 9 GW full Utah buildout claimed.","createdAt":"2026-08-17T20:25:33.630Z"},{"id":"3d11c7db-9304-4c53-8d39-7bdd04f582a1","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","series":"announced","valueGw":1,"asOf":"2026-05-01T00:00:00.000Z","sourceUrl":"https://www.sltrib.com/news/2026/05/04/hyperscale-data-center-project/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Interim regulatory ceiling: Gov. Spencer Cox requested the current/first phase be capped at ~1 GW pending review; not a build commitment.","createdAt":"2026-08-19T00:16:15.401Z"}],"financialClaims":[{"id":"fdd63aee-2774-4b20-9ffe-448702a6bffd","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","kind":"capex","label":"Full buildout total","valueUsd":"100000000000","capUsd":null,"conditions":"'Could exceed $100 billion' at full buildout; aspirational full-scale figure.","asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://www.sltrib.com/news/2026/05/04/hyperscale-data-center-project/","sourceType":"journalist_report","evidenceTier":"reported","createdAt":"2026-08-19T00:16:17.319Z"},{"id":"79a334e4-3c44-4ed0-9b4d-1689774691a6","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","kind":"incentive","label":"Upfront county impact funding","valueUsd":"16200000","capUsd":null,"conditions":"Developer commitment TO Box Elder County (not an incentive to the developer) to offset initial impacts on the county budget for essential services such as law enforcement and fire.","asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://www.midaut.org/stratos","sourceType":"press_release","evidenceTier":"verified","createdAt":"2026-08-19T00:16:18.152Z"},{"id":"ab98e8af-6130-4ef5-a90c-3921d4327a8e","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","kind":"tax_abatement","label":"MIDA property tax relief","valueUsd":null,"capUsd":null,"conditions":"MIDA approved property tax relief for the developers on Apr 24, 2026; specific abatement terms unspecified in sourcing.","asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://www.sltrib.com/news/2026/05/04/hyperscale-data-center-project/","sourceType":"journalist_report","evidenceTier":"reported","createdAt":"2026-08-19T00:16:18.940Z"},{"id":"2d95d74a-0348-4241-86b5-8970e8cb3d97","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","kind":"capex","label":"Phase 1 (~500 MW) investment","valueUsd":"4000000000","capUsd":null,"conditions":"Stated as 'more than $4 billion'; floor figure.","asOf":"2026-05-07T00:00:00.000Z","sourceUrl":"https://www.utahmoneywatch.com/the-real-money-behind-stratos-oleary-ventures-pegs-phase-1-at-more-than-4-billion-with-20-billion-of-expenditures-in-its-early-phases/","sourceType":"journalist_report","evidenceTier":"claimed","createdAt":"2026-08-19T00:16:15.784Z"},{"id":"0cc7b34e-3bb6-4aa4-94ec-ee8bb123e395","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","kind":"capex","label":"Early phases (scaling to 3 GW)","valueUsd":"20000000000","capUsd":null,"conditions":"Cumulative early-phase expenditures per O'Leary Ventures.","asOf":"2026-05-07T00:00:00.000Z","sourceUrl":"https://www.utahmoneywatch.com/the-real-money-behind-stratos-oleary-ventures-pegs-phase-1-at-more-than-4-billion-with-20-billion-of-expenditures-in-its-early-phases/","sourceType":"journalist_report","evidenceTier":"claimed","createdAt":"2026-08-19T00:16:16.550Z"}],"metricClaims":[{"id":"b6298d6c-6b94-4c9e-977f-de5460d0b4ac","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","metricType":"cooling_type","valueNumeric":null,"valueText":"Closed-loop chilling system combined with dry (air-based) cooling; no continuous water draw","unit":null,"grantingJurisdiction":null,"asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://governor.utah.gov/wp-content/uploads/FAQ-on-Stratos-Project.pdf","sourceType":"permit_filing","evidenceTier":"verified","supersedesId":null,"note":null,"createdAt":"2026-08-19T00:16:21.294Z"},{"id":"c9169d2d-36fc-46de-a934-b887ef96136b","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","metricType":"jobs_construction","valueNumeric":null,"valueText":"Thousands of construction jobs over an approximately ten-year period","unit":null,"grantingJurisdiction":null,"asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://governor.utah.gov/wp-content/uploads/FAQ-on-Stratos-Project.pdf","sourceType":"permit_filing","evidenceTier":"verified","supersedesId":null,"note":null,"createdAt":"2026-08-19T00:16:20.907Z"},{"id":"fd2588c0-337c-448b-a31c-f3331a2ebf7c","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","metricType":"jobs_permanent","valueNumeric":2000,"valueText":"~2,000 permanent jobs at full buildout (skilled trade, logistics, IT, administrative)","unit":null,"grantingJurisdiction":null,"asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://governor.utah.gov/wp-content/uploads/FAQ-on-Stratos-Project.pdf","sourceType":"permit_filing","evidenceTier":"verified","supersedesId":null,"note":null,"createdAt":"2026-08-19T00:16:20.523Z"}],"powerProjects":[{"id":"0349f2c3-bc77-430d-8c65-4cee846f58e2","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","name":"On-site natural gas generation (Ruby Pipeline supply)","type":"gas","capacityGw":9,"lifecycleState":"announced","sourceUrl":"https://utahnewsdispatch.com/2026/05/04/box-elder-commissioners-approve-data-center/","evidenceTier":"claimed","note":"Self-generated gas plant claimed up to 9 GW; gas via Ruby Pipeline through Tallgrass; no air permit yet.","createdAt":"2026-08-17T20:25:34.196Z"},{"id":"601a6da7-8963-4dbc-8782-cc912fe342c6","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","name":"Stratos on-site natural gas generation","type":"gas","capacityGw":9,"lifecycleState":"announced","sourceUrl":"https://finance.yahoo.com/sectors/technology/articles/kevin-oleary-plans-9-gigawatt-133729333.html","evidenceTier":"reported","note":"Behind-the-meter, off-grid; mostly natural gas fed via a direct connection to the interstate Ruby Pipeline (owned by Tallgrass Energy). Starts ~3 GW, scales toward ~9 GW. As of the state FAQ no Air Quality Notice of Intent had been submitted; nothing energized or permitted.","createdAt":"2026-08-19T00:16:19.741Z"},{"id":"3c177529-7da3-4060-b91b-a9ed77ac6e65","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","name":"Stratos on-site solar (contemplated)","type":"solar","capacityGw":null,"lifecycleState":"announced","sourceUrl":"https://governor.utah.gov/wp-content/uploads/FAQ-on-Stratos-Project.pdf","evidenceTier":"verified","note":"State FAQ notes solar is among on-site generation types contemplated (larger footprint than gas); no capacity specified.","createdAt":"2026-08-19T00:16:20.132Z"}],"facilities":[],"incidents":[],"events":[{"id":"94e01c27-4758-472e-a0d9-ff8675b41a8e","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: O'Leary Ventures","occurredAt":"2026-08-19T00:16:22.437Z","createdAt":"2026-08-19T00:16:22.437Z"},{"id":"bd83d7ac-a5e7-4143-8fa3-638115ad0c61","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"tax_abatement: MIDA property tax relief","occurredAt":"2026-08-19T00:16:19.350Z","createdAt":"2026-08-19T00:16:19.350Z"},{"id":"63ca8c41-e2e6-4021-8682-f49ad7198ef3","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"incentive: Upfront county impact funding","occurredAt":"2026-08-19T00:16:18.563Z","createdAt":"2026-08-19T00:16:18.563Z"},{"id":"9a5cbc28-9ea9-4829-b342-1f8329db3eb5","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: Full buildout total","occurredAt":"2026-08-19T00:16:17.772Z","createdAt":"2026-08-19T00:16:17.772Z"},{"id":"b64c1037-ab6e-41d9-874c-864e65f0ddeb","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: Early phases (scaling to 3 GW)","occurredAt":"2026-08-19T00:16:16.933Z","createdAt":"2026-08-19T00:16:16.933Z"},{"id":"3bd5d49a-9b7e-44f5-85cb-1919e816814e","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: Phase 1 (~500 MW) investment","occurredAt":"2026-08-19T00:16:16.164Z","createdAt":"2026-08-19T00:16:16.164Z"},{"id":"f93910d3-741e-457d-bfa7-043d61aada5c","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"1","claimId":"3d11c7db-9304-4c53-8d39-7bdd04f582a1","detail":"reported · journalist_report","occurredAt":"2026-08-19T00:16:15.549Z","createdAt":"2026-08-19T00:16:15.549Z"},{"id":"ea2f3dff-d45b-4ad7-8b09-ddd978b46172","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"0.5","claimId":"c418f8e0-d841-46f6-b796-ebf13fb3b981","detail":"claimed · journalist_report","occurredAt":"2026-08-19T00:16:14.874Z","createdAt":"2026-08-19T00:16:14.874Z"},{"id":"e4cfdbaa-9215-41e8-9604-cf6c4b126182","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","eventType":"capacity_changed","series":"announced","oldValue":"3","newValue":"9","claimId":"817d8de2-3e71-47c6-b291-dfeab7fd5579","detail":null,"occurredAt":"2026-08-19T00:16:14.175Z","createdAt":"2026-08-19T00:16:14.175Z"},{"id":"cf310839-7ca8-44cc-854f-b88fee180899","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"9","claimId":"817d8de2-3e71-47c6-b291-dfeab7fd5579","detail":"reported · press_release","occurredAt":"2026-08-19T00:16:14.026Z","createdAt":"2026-08-19T00:16:14.026Z"},{"id":"cb44010b-56db-49b9-b618-dd55e4f84374","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: Tallgrass Energy","occurredAt":"2026-08-17T20:25:36.485Z","createdAt":"2026-08-17T20:25:36.485Z"},{"id":"c8ad1d23-67ff-48f7-b79e-94b16a6d4780","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: Military Installation Development Authority (MIDA)","occurredAt":"2026-08-17T20:25:35.734Z","createdAt":"2026-08-17T20:25:35.734Z"},{"id":"f88194af-247a-4a96-bc37-77ffd377694c","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: O'Leary Digital","occurredAt":"2026-08-17T20:25:34.981Z","createdAt":"2026-08-17T20:25:34.981Z"},{"id":"09ba6332-f463-4b29-953a-59c4dd8d09a8","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"3","claimId":"1b013380-f525-486c-87b0-c1d2aefeafa3","detail":null,"occurredAt":"2026-08-17T20:25:33.938Z","createdAt":"2026-08-17T20:25:33.938Z"},{"id":"d2d254d4-8950-4700-83b2-410f4e12ead4","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"3","claimId":"1b013380-f525-486c-87b0-c1d2aefeafa3","detail":"claimed · county_docket","occurredAt":"2026-08-17T20:25:33.783Z","createdAt":"2026-08-17T20:25:33.783Z"}],"capacity_picture":{"announced_gw":9,"contracted_gw":null,"under_construction_gw":null,"energized_gw":null,"announced_minus_energized_gw":9,"by_series":{"announced":{"valueGw":9,"asOf":"2026-06-01T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://www.midaut.org/stratos"},"contracted":null,"under_construction":null,"energized":null}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Stratos Project (O'Leary Digital) AI Data Center & Energy Campus","url":"https://registry.deploy.report/datacenters/oleary-stratos-hansel-valley-box-elder","address":{"@type":"PostalAddress","addressLocality":"Hansel Valley"}}}