{"id":"8c438a19-42ec-4710-8712-88d59bb1d05b","slug":"patmos-fairfield-technology-campus","name":"Patmos Fairfield Technology Campus","aliases":[],"locationId":"55b1dbb8-5aec-42ef-b3d7-aa9c56480d7a","lat":null,"lng":null,"locationPrecision":"region","landStatus":"owned","lifecycleState":"announced","powerSourceMix":null,"interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":null,"expectedEnergizationPrecision":null,"expectedEnergizationMilestone":null,"dedicatedSubstation":null,"gridOperator":null,"waterSourceNotes":null,"servingUtility":"Alabama Power","acreage":null,"totalBuildingSqft":205000,"streetAddress":"7201 Aaron Aronov Drive, Fairfield, Alabama","notes":"Patmos acquired the former Walmart property, a 205,000-square-foot building in Fairfield, Alabama, southwest of Birmingham in Jefferson County, and plans to redevelop it into a Technology Campus for AI, high-performance computing and colocation. The data center is projected to have an initial capacity of 20 MW, with up to 50 MW of utility capacity, and initial operations are expected to begin in May 2027. Patmos has agreed to terms with Alabama Power for electric service.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.patmos.tech/news/fairfield-technology-campus","title":"Patmos announces plans to transform former Fairfield Walmart into new Technology Campus","sourceName":"Patmos","publishedAt":"2026-11-12"}],"reviewNote":null,"createdAt":"2026-11-19T00:36:14.434Z","updatedAt":"2026-11-19T00:36:14.967Z","location":{"id":"55b1dbb8-5aec-42ef-b3d7-aa9c56480d7a","name":"Alabama","slug":"alabama","kind":"state","parentLocationId":"aa8b9c05-c836-4021-801f-59801970401e","region":"Southeast","lat":33.2588817,"lng":-86.8295337,"reviewStatus":"reviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-18T03:20:13.531Z","updatedAt":"2026-08-21T03:20:12.226Z"},"parties":[{"id":"792f6ff7-d1f1-48a6-a77b-b05f5dfe9aac","dataCenterId":"8c438a19-42ec-4710-8712-88d59bb1d05b","companyId":"429b18f3-41e9-4dd7-aab7-98d2992cd065","externalName":null,"role":"developer","structureNotes":null,"createdAt":"2026-11-19T00:36:17.445Z","company":{"id":"429b18f3-41e9-4dd7-aab7-98d2992cd065","name":"Patmos","slug":"patmos"}},{"id":"2aeb7ba7-c43a-4060-a5f2-83891d065f3d","dataCenterId":"8c438a19-42ec-4710-8712-88d59bb1d05b","companyId":null,"externalName":"Alabama Power","role":"utility","structureNotes":null,"createdAt":"2026-11-19T00:36:18.640Z","company":null}],"capacityClaims":[{"id":"140bd3f4-ab57-47cb-96e7-f289b96ffc99","dataCenterId":"8c438a19-42ec-4710-8712-88d59bb1d05b","series":"announced","valueGw":0.02,"asOf":"2026-11-12T00:00:00.000Z","sourceUrl":"https://www.patmos.tech/news/fairfield-technology-campus","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":"intake proposal 5d8627ff-3cec-44fe-b22d-029c77536fd9","createdAt":"2026-11-19T00:36:20.349Z"}],"financialClaims":[],"metricClaims":[],"powerProjects":[],"permits":[],"facilities":[],"incidents":[],"events":[{"id":"fe22ad5c-f592-47a9-b1e7-3779063638b2","dataCenterId":"8c438a19-42ec-4710-8712-88d59bb1d05b","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"0.02","claimId":"140bd3f4-ab57-47cb-96e7-f289b96ffc99","detail":null,"occurredAt":"2026-11-19T00:36:20.673Z","createdAt":"2026-11-19T00:36:20.673Z"},{"id":"b7c42c69-b70c-43c4-9d0e-0cdc3b6ad0a8","dataCenterId":"8c438a19-42ec-4710-8712-88d59bb1d05b","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"0.02","claimId":"140bd3f4-ab57-47cb-96e7-f289b96ffc99","detail":"claimed · press_release","occurredAt":"2026-11-19T00:36:20.521Z","createdAt":"2026-11-19T00:36:20.521Z"},{"id":"59a78010-0005-421d-9c3c-1abfa0653112","dataCenterId":"8c438a19-42ec-4710-8712-88d59bb1d05b","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: Alabama Power","occurredAt":"2026-11-19T00:36:19.099Z","createdAt":"2026-11-19T00:36:19.099Z"},{"id":"a792842f-c597-4919-956a-084f38370678","dataCenterId":"8c438a19-42ec-4710-8712-88d59bb1d05b","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: 429b18f3-41e9-4dd7-aab7-98d2992cd065","occurredAt":"2026-11-19T00:36:17.895Z","createdAt":"2026-11-19T00:36:17.895Z"}],"capacity_picture":{"announced_gw":0.02,"contracted_gw":null,"under_construction_gw":null,"energized_gw":null,"announced_minus_energized_gw":0.02,"by_series":{"announced":{"valueGw":0.02,"asOf":"2026-11-12T00:00:00.000Z","evidenceTier":"claimed","sourceUrl":"https://www.patmos.tech/news/fairfield-technology-campus"},"contracted":null,"under_construction":null,"energized":null}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Patmos Fairfield Technology Campus","url":"https://registry.deploy.report/datacenters/patmos-fairfield-technology-campus","address":{"@type":"PostalAddress","addressLocality":"Alabama"}}}