{"id":"98aff169-e1ee-4c4c-8249-1c15ae228b25","slug":"rackbank-gigacampus-indore","name":"RackBank GigaCampus (Indore)","aliases":["NeevCloud AI Data Center","India's First Purpose-Built AI Datacenter"],"locationId":"ba316b6f-5c30-466e-8bc3-4287748c36e9","lat":22.61,"lng":75.69,"locationPrecision":"city","landStatus":null,"lifecycleState":"under_construction","powerSourceMix":null,"interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":null,"waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"The RackBank GigaCampus in the Pithampur Industrial Area near Indore, developed by RackBank Datacenters and home to the NeevCloud AI SuperCloud. Foundation stone laid Oct 2024; announced 80 MW total built in four 20 MW phases, targeting 60,000 GPUs at full build-out, using proprietary immersion plus refrigerant-free indirect-evaporative cooling. Site-level installed GPU model is not published.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.prnewswire.com/in/news-releases/chief-minister-dr-mohan-yadav-laid-the-foundation-stone-for-indias-first-purpose-built-ai-data-center-in-madhya-pradesh-302285576.html","title":"Foundation Stone for India's First Purpose-Built AI Data Center in Madhya Pradesh","sourceName":"PR Newswire"},{"url":"https://baxtel.com/data-center/rackbank-indore","title":"RackBank: Indore Data Center","sourceName":"Baxtel"}],"reviewNote":null,"createdAt":"2026-08-31T00:40:02.508Z","updatedAt":"2026-08-31T01:13:32.745Z","location":{"id":"ba316b6f-5c30-466e-8bc3-4287748c36e9","name":"Pithampur, Indore, Madhya Pradesh, India","slug":"pithampur-indore-mp","kind":"city","parentLocationId":null,"region":null,"lat":22.61,"lng":75.69,"reviewStatus":"unreviewed","aliases":["Pithampur","Indore","Madhya Pradesh"],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-31T00:40:01.748Z","updatedAt":"2026-08-31T00:40:01.748Z"},"parties":[{"id":"509deb01-c00f-421a-81b9-2944a4cc3ee5","dataCenterId":"98aff169-e1ee-4c4c-8249-1c15ae228b25","companyId":null,"externalName":"RackBank Datacenters","role":"developer","structureNotes":"Develops/operates the GigaCampus.","createdAt":"2026-08-31T00:40:04.114Z","company":null},{"id":"ef09a5a2-151c-444f-8e9f-0b94e524ee70","dataCenterId":"98aff169-e1ee-4c4c-8249-1c15ae228b25","companyId":"be5209af-ed26-4b9a-a5b4-d9169eb54a34","externalName":null,"role":"operator","structureNotes":"NeevCloud AI SuperCloud (same leadership as RackBank).","createdAt":"2026-08-31T00:40:04.880Z","company":{"id":"be5209af-ed26-4b9a-a5b4-d9169eb54a34","name":"NeevCloud","slug":"neevcloud"}},{"id":"9e358b3b-3654-4faf-b0b6-8741640ff3cf","dataCenterId":"98aff169-e1ee-4c4c-8249-1c15ae228b25","companyId":null,"externalName":"NVIDIA","role":"chip_supplier","structureNotes":"Blackwell-ready; H200/B200/B300 marketed.","createdAt":"2026-08-31T00:40:05.728Z","company":null}],"capacityClaims":[{"id":"226bf597-d348-4af5-ba1c-18457acb4c9f","dataCenterId":"98aff169-e1ee-4c4c-8249-1c15ae228b25","series":"announced","valueGw":0.08,"asOf":"2024-10-24T00:00:00.000Z","sourceUrl":"https://www.prnewswire.com/in/news-releases/chief-minister-dr-mohan-yadav-laid-the-foundation-stone-for-indias-first-purpose-built-ai-data-center-in-madhya-pradesh-302285576.html","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"80 MW total, built in four 20 MW phases.","createdAt":"2026-08-31T00:40:03.579Z"}],"financialClaims":[],"metricClaims":[],"powerProjects":[],"facilities":[],"incidents":[],"events":[{"id":"52c2b160-208e-4ed0-bec9-e2f2d43270b3","dataCenterId":"98aff169-e1ee-4c4c-8249-1c15ae228b25","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"chip_supplier: NVIDIA","occurredAt":"2026-08-31T00:40:06.115Z","createdAt":"2026-08-31T00:40:06.115Z"},{"id":"d7e7c2dc-783d-4165-9144-414fc30cc661","dataCenterId":"98aff169-e1ee-4c4c-8249-1c15ae228b25","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"operator: be5209af-ed26-4b9a-a5b4-d9169eb54a34","occurredAt":"2026-08-31T00:40:05.269Z","createdAt":"2026-08-31T00:40:05.269Z"},{"id":"1ef06d12-1f6a-4d00-abd4-91ae36fb7c42","dataCenterId":"98aff169-e1ee-4c4c-8249-1c15ae228b25","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: RackBank Datacenters","occurredAt":"2026-08-31T00:40:04.491Z","createdAt":"2026-08-31T00:40:04.491Z"},{"id":"2d12a67c-d6c5-4e63-9760-de651460e11c","dataCenterId":"98aff169-e1ee-4c4c-8249-1c15ae228b25","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"0.08","claimId":"226bf597-d348-4af5-ba1c-18457acb4c9f","detail":null,"occurredAt":"2026-08-31T00:40:03.886Z","createdAt":"2026-08-31T00:40:03.886Z"},{"id":"e0f176f5-0a2f-42a6-96f2-872cf70870e7","dataCenterId":"98aff169-e1ee-4c4c-8249-1c15ae228b25","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"0.08","claimId":"226bf597-d348-4af5-ba1c-18457acb4c9f","detail":"reported · journalist_report","occurredAt":"2026-08-31T00:40:03.733Z","createdAt":"2026-08-31T00:40:03.733Z"}],"capacity_picture":{"announced_gw":0.08,"contracted_gw":null,"under_construction_gw":null,"energized_gw":null,"announced_minus_energized_gw":0.08,"by_series":{"announced":{"valueGw":0.08,"asOf":"2024-10-24T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://www.prnewswire.com/in/news-releases/chief-minister-dr-mohan-yadav-laid-the-foundation-stone-for-indias-first-purpose-built-ai-data-center-in-madhya-pradesh-302285576.html"},"contracted":null,"under_construction":null,"energized":null}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"RackBank GigaCampus (Indore)","url":"https://registry.deploy.report/datacenters/rackbank-gigacampus-indore","geo":{"@type":"GeoCoordinates","latitude":22.61,"longitude":75.69},"address":{"@type":"PostalAddress","addressLocality":"Pithampur, Indore, Madhya Pradesh, India"}}}