{"id":"f16e490e-0625-4aba-89cc-c734381df6fb","slug":"scala-ai-city-eldorado-do-sul","name":"Scala AI City","aliases":[],"locationId":"362591aa-a301-41e7-aafd-31a0f401dd23","lat":null,"lng":null,"locationPrecision":null,"landStatus":"private","lifecycleState":"announced","powerSourceMix":"grid","interconnectionQueueStatus":"Not published beyond a sourcing claim: Scala says the campus runs on 100 percent renewable certified energy and cites abundant local supply as a reason for choosing the site, but the announcement carries no grid connection, authorisation or interconnection detail. It opens at 54 MW against a 4,750 MW ambition.","interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"other","waterSourceNotes":"Zero water in cooling, per the operator. Scala says the campus uses refrigerant-based liquid cooling and targets a water usage effectiveness of zero, meaning no water in the cooling systems at all. That is a design target published at announcement, on a site of more than 1,730 acres opening at 54 MW.","servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"DigitalBridge-backed Scala Data Centers plans a gigawatt-scale AI data-center campus on a ~10 million m2 site near Porto Alegre, targeting 4.75 GW at full buildout. Brazil's Ministry of Mines and Energy authorized a 5 GW ramp-up connection to the national grid (SIN) in May 2025; an initial 54 MW phase is planned.","keyFacts":[{"label":"MME grid authorization (company)","value":"May 14 2025 Scala said Brazil's Ministry of Mines and Energy authorized a 5 GW ramp-up connection of Scala AI City to the National Interconnected System (SIN), described as one of the largest energy authorizations for a Brazilian data-center project ([Scala via PR Newswire, May 14 2025](https://www.prnewswire.com/news-releases/scala-ai-city-brazils-ministry-of-mines-and-energy-approves-5-gw-power-connection-for-data-center-city-in-rio-grande-do-sul-302455610.html))","sourceUrl":"https://www.prnewswire.com/news-releases/scala-ai-city-brazils-ministry-of-mines-and-energy-approves-5-gw-power-connection-for-data-center-city-in-rio-grande-do-sul-302455610.html"},{"label":"Full buildout capacity / site (company)","value":"Company says at full buildout the campus will provide 4.75 GW across a 10 million m2 site in Eldorado do Sul, Rio Grande do Sul, announced Sep 2024 at Palacio Piratini in Porto Alegre ([Scala via PR Newswire, May 14 2025](https://www.prnewswire.com/news-releases/scala-ai-city-brazils-ministry-of-mines-and-energy-approves-5-gw-power-connection-for-data-center-city-in-rio-grande-do-sul-302455610.html))","sourceUrl":"https://www.prnewswire.com/news-releases/scala-ai-city-brazils-ministry-of-mines-and-energy-approves-5-gw-power-connection-for-data-center-city-in-rio-grande-do-sul-302455610.html"},{"label":"Phase 1 IT / investment (company)","value":"Phase 1 planned at 54 MW initial IT capacity with about BRL 3 billion (USD 500 million) investment, and over 3,000 direct and indirect jobs cited. Fully built out, company says total investment could reach BRL 500 billion ([Scala via PR Newswire, May 14 2025](https://www.prnewswire.com/news-releases/scala-ai-city-brazils-ministry-of-mines-and-energy-approves-5-gw-power-connection-for-data-center-city-in-rio-grande-do-sul-302455610.html))","sourceUrl":"https://www.prnewswire.com/news-releases/scala-ai-city-brazils-ministry-of-mines-and-energy-approves-5-gw-power-connection-for-data-center-city-in-rio-grande-do-sul-302455610.html"},{"label":"Energy / latency pitch (company)","value":"Positioned on 100% renewable certified energy with PPAs through at least 2039, circular-economy design, and sub-80 ms latency to North America via powershoring / Malbec cable context in company materials ([Scala via PR Newswire, May 14 2025](https://www.prnewswire.com/news-releases/scala-ai-city-brazils-ministry-of-mines-and-energy-approves-5-gw-power-connection-for-data-center-city-in-rio-grande-do-sul-302455610.html))","sourceUrl":"https://www.prnewswire.com/news-releases/scala-ai-city-brazils-ministry-of-mines-and-energy-approves-5-gw-power-connection-for-data-center-city-in-rio-grande-do-sul-302455610.html"},{"label":"Sponsor / backer (company)","value":"Scala Data Centers is backed by DigitalBridge; company cites over BRL 12 billion invested and roughly 200 MW installed/in-development plus a landbank exceeding 12 million m2 across four countries ([Scala via PR Newswire, May 14 2025](https://www.prnewswire.com/news-releases/scala-ai-city-brazils-ministry-of-mines-and-energy-approves-5-gw-power-connection-for-data-center-city-in-rio-grande-do-sul-302455610.html))","sourceUrl":"https://www.prnewswire.com/news-releases/scala-ai-city-brazils-ministry-of-mines-and-energy-approves-5-gw-power-connection-for-data-center-city-in-rio-grande-do-sul-302455610.html"}],"reviewStatus":"reviewed","sources":[{"url":"https://www.prnewswire.com/news-releases/scala-ai-city-brazils-ministry-of-mines-and-energy-approves-5-gw-power-connection-for-data-center-city-in-rio-grande-do-sul-302455610.html","title":"Scala AI City: Brazil's MME Approves 5 GW Power Connection (PR Newswire)"},{"url":"https://www.datacenterdynamics.com/en/news/scala-ai-city-scala-pitches-50bn-brazil-data-center-campus-of-up-to-47gw/","title":"Scala pitches $50bn Brazil data center campus of up to 4.7GW (DCD)"},{"url":"https://www.intelligentcio.com/latam/2025/05/15/scala-ai-city-brazils-ministry-of-mines-and-energy-approves-5-gw-power-connection-for-data-center-city-in-rio-grande-do-sul/","title":"Brazil's MME approves 5 GW power connection (Intelligent CIO LATAM)"},{"url":"https://scaladatacenters.com/en/with-an-initial-investment-of-usd-500-million-scala-data-centers-and-rio-grande-do-sul-government-sign-agreement-for-largest-digital-infrastructure-project-in-the-state-of-southern-brazil/","title":"Scala Data Centers and Rio Grande do Sul Government Sign Agreement","sourceName":"Scala Data Centers"}],"reviewNote":null,"createdAt":"2026-08-19T00:50:43.378Z","updatedAt":"2026-09-28T08:30:01.694Z","location":{"id":"362591aa-a301-41e7-aafd-31a0f401dd23","name":"Eldorado do Sul","slug":"eldorado-do-sul-rio-grande-do-sul","kind":"city","parentLocationId":"acf49b57-10a4-465c-8e27-aec4f3f1ca47","region":"Rhode Island","lat":-29.9976311,"lng":-51.3063965,"reviewStatus":"reviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-19T00:50:42.993Z","updatedAt":"2026-08-21T03:20:12.226Z"},"parties":[{"id":"d7a28683-5536-4a71-8cba-1ec12d662980","dataCenterId":"f16e490e-0625-4aba-89cc-c734381df6fb","companyId":null,"externalName":"DigitalBridge","role":"financier","structureNotes":"Owner/backer of Scala Data Centers","createdAt":"2026-08-19T00:50:51.397Z","company":null},{"id":"27f8f867-309a-4dde-bb01-be449fc9b0ed","dataCenterId":"f16e490e-0625-4aba-89cc-c734381df6fb","companyId":null,"externalName":"Scala Data Centers","role":"developer","structureNotes":null,"createdAt":"2026-08-19T00:50:49.006Z","company":null},{"id":"07178aea-3307-4c06-8ecf-dc235806938c","dataCenterId":"f16e490e-0625-4aba-89cc-c734381df6fb","companyId":null,"externalName":"Scala Data Centers","role":"operator","structureNotes":null,"createdAt":"2026-08-19T00:50:50.243Z","company":null}],"capacityClaims":[{"id":"2e296472-e685-4424-8909-c917e36d08ff","dataCenterId":"f16e490e-0625-4aba-89cc-c734381df6fb","series":"announced","valueGw":4.75,"asOf":"2025-05-01T00:00:00.000Z","sourceUrl":"https://www.prnewswire.com/news-releases/scala-ai-city-brazils-ministry-of-mines-and-energy-approves-5-gw-power-connection-for-data-center-city-in-rio-grande-do-sul-302455610.html","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":"Full buildout target across a 10 million m2 site.","createdAt":"2026-08-19T00:50:44.468Z"},{"id":"ab84e830-fd49-4d67-80c6-c8c12e177abb","dataCenterId":"f16e490e-0625-4aba-89cc-c734381df6fb","series":"contracted","valueGw":5,"asOf":"2025-05-01T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/scala-ai-city-scala-pitches-50bn-brazil-data-center-campus-of-up-to-47gw/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"MME-authorized 5 GW ramp-up connection to the SIN grid.","createdAt":"2026-08-19T00:50:45.311Z"},{"id":"a3f9bd30-b672-49d8-aad3-dd89ea793645","dataCenterId":"f16e490e-0625-4aba-89cc-c734381df6fb","series":"under_construction","valueGw":0.054,"asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://www.prnewswire.com/news-releases/scala-ai-city-brazils-ministry-of-mines-and-energy-approves-5-gw-power-connection-for-data-center-city-in-rio-grande-do-sul-302455610.html","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":"Initial 54 MW Phase 1 IT capacity.","createdAt":"2026-08-19T00:50:46.163Z"}],"financialClaims":[{"id":"961d8b03-0251-4e35-a3cd-0aac8b81bca2","dataCenterId":"f16e490e-0625-4aba-89cc-c734381df6fb","kind":"capex","label":"Full campus pitched investment (R$300bn)","valueUsd":"50000000000","capUsd":null,"conditions":null,"asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/scala-ai-city-scala-pitches-50bn-brazil-data-center-campus-of-up-to-47gw/","sourceType":"journalist_report","evidenceTier":"reported","createdAt":"2026-08-19T00:50:46.703Z"},{"id":"c39fbb1d-ae3f-4c3c-bcf9-fb78dd9ef75b","dataCenterId":"f16e490e-0625-4aba-89cc-c734381df6fb","kind":"capex","label":"Phase 1 investment (R$3bn)","valueUsd":"500000000","capUsd":null,"conditions":null,"asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://www.prnewswire.com/news-releases/scala-ai-city-brazils-ministry-of-mines-and-energy-approves-5-gw-power-connection-for-data-center-city-in-rio-grande-do-sul-302455610.html","sourceType":"press_release","evidenceTier":"claimed","createdAt":"2026-08-19T00:50:47.463Z"}],"metricClaims":[{"id":"bcad1867-1609-4f20-be6b-266dba8e213d","dataCenterId":"f16e490e-0625-4aba-89cc-c734381df6fb","metricType":"jobs_construction","valueNumeric":3000,"valueText":"over 3,000 direct and indirect jobs from Phase 1","unit":null,"grantingJurisdiction":null,"asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://www.prnewswire.com/news-releases/scala-ai-city-brazils-ministry-of-mines-and-energy-approves-5-gw-power-connection-for-data-center-city-in-rio-grande-do-sul-302455610.html","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":null,"createdAt":"2026-08-19T00:50:48.236Z"}],"powerProjects":[],"facilities":[],"incidents":[],"events":[{"id":"5d2e4bcd-8051-4d62-b7d5-d4fa4e78c35b","dataCenterId":"f16e490e-0625-4aba-89cc-c734381df6fb","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"financier: DigitalBridge","occurredAt":"2026-08-19T00:50:51.783Z","createdAt":"2026-08-19T00:50:51.783Z"},{"id":"edb95390-24f3-4e30-8139-0909e9d0049d","dataCenterId":"f16e490e-0625-4aba-89cc-c734381df6fb","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"operator: Scala Data Centers","occurredAt":"2026-08-19T00:50:50.633Z","createdAt":"2026-08-19T00:50:50.633Z"},{"id":"ed5b9ede-db46-4800-a3d9-63d90fec8cac","dataCenterId":"f16e490e-0625-4aba-89cc-c734381df6fb","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: Scala Data Centers","occurredAt":"2026-08-19T00:50:49.472Z","createdAt":"2026-08-19T00:50:49.472Z"},{"id":"4f6c3bca-b915-4537-9c5f-bd0d0a52c8eb","dataCenterId":"f16e490e-0625-4aba-89cc-c734381df6fb","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: Phase 1 investment (R$3bn)","occurredAt":"2026-08-19T00:50:47.847Z","createdAt":"2026-08-19T00:50:47.847Z"},{"id":"c2bacb07-cb82-4288-9e75-df469502c57c","dataCenterId":"f16e490e-0625-4aba-89cc-c734381df6fb","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: Full campus pitched investment (R$300bn)","occurredAt":"2026-08-19T00:50:47.082Z","createdAt":"2026-08-19T00:50:47.082Z"},{"id":"030fd90d-c4fd-4f91-8290-d640ab63c745","dataCenterId":"f16e490e-0625-4aba-89cc-c734381df6fb","eventType":"capacity_changed","series":"under_construction","oldValue":null,"newValue":"0.054","claimId":"a3f9bd30-b672-49d8-aad3-dd89ea793645","detail":null,"occurredAt":"2026-08-19T00:50:46.476Z","createdAt":"2026-08-19T00:50:46.476Z"},{"id":"f3e1f69c-edf0-452b-9a0b-edd55330bd30","dataCenterId":"f16e490e-0625-4aba-89cc-c734381df6fb","eventType":"claim_recorded","series":"under_construction","oldValue":null,"newValue":"0.054","claimId":"a3f9bd30-b672-49d8-aad3-dd89ea793645","detail":"claimed · press_release","occurredAt":"2026-08-19T00:50:46.323Z","createdAt":"2026-08-19T00:50:46.323Z"},{"id":"5967b23b-6934-4e00-bae4-044a9acdab45","dataCenterId":"f16e490e-0625-4aba-89cc-c734381df6fb","eventType":"capacity_changed","series":"contracted","oldValue":null,"newValue":"5","claimId":"ab84e830-fd49-4d67-80c6-c8c12e177abb","detail":null,"occurredAt":"2026-08-19T00:50:45.621Z","createdAt":"2026-08-19T00:50:45.621Z"},{"id":"a6c264c8-ac75-4c54-ba46-79b32f5a1fdc","dataCenterId":"f16e490e-0625-4aba-89cc-c734381df6fb","eventType":"claim_recorded","series":"contracted","oldValue":null,"newValue":"5","claimId":"ab84e830-fd49-4d67-80c6-c8c12e177abb","detail":"reported · journalist_report","occurredAt":"2026-08-19T00:50:45.468Z","createdAt":"2026-08-19T00:50:45.468Z"},{"id":"817ef637-b5d8-412b-8597-91f1bd6b1ee8","dataCenterId":"f16e490e-0625-4aba-89cc-c734381df6fb","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"4.75","claimId":"2e296472-e685-4424-8909-c917e36d08ff","detail":null,"occurredAt":"2026-08-19T00:50:44.778Z","createdAt":"2026-08-19T00:50:44.778Z"},{"id":"2ef6c140-2368-4f28-9b25-deb73801c3df","dataCenterId":"f16e490e-0625-4aba-89cc-c734381df6fb","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"4.75","claimId":"2e296472-e685-4424-8909-c917e36d08ff","detail":"claimed · press_release","occurredAt":"2026-08-19T00:50:44.625Z","createdAt":"2026-08-19T00:50:44.625Z"}],"capacity_picture":{"announced_gw":4.75,"contracted_gw":5,"under_construction_gw":0.054,"energized_gw":null,"announced_minus_energized_gw":4.75,"by_series":{"announced":{"valueGw":4.75,"asOf":"2025-05-01T00:00:00.000Z","evidenceTier":"claimed","sourceUrl":"https://www.prnewswire.com/news-releases/scala-ai-city-brazils-ministry-of-mines-and-energy-approves-5-gw-power-connection-for-data-center-city-in-rio-grande-do-sul-302455610.html"},"contracted":{"valueGw":5,"asOf":"2025-05-01T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://www.datacenterdynamics.com/en/news/scala-ai-city-scala-pitches-50bn-brazil-data-center-campus-of-up-to-47gw/"},"under_construction":{"valueGw":0.054,"asOf":"2025-06-01T00:00:00.000Z","evidenceTier":"claimed","sourceUrl":"https://www.prnewswire.com/news-releases/scala-ai-city-brazils-ministry-of-mines-and-energy-approves-5-gw-power-connection-for-data-center-city-in-rio-grande-do-sul-302455610.html"},"energized":null}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Scala AI City","url":"https://registry.deploy.report/datacenters/scala-ai-city-eldorado-do-sul","address":{"@type":"PostalAddress","addressLocality":"Eldorado do Sul"}}}