{"id":"79dc4d14-f2b6-4caf-b4d9-2620039c6a94","slug":"tract-tric-storey-county-nevada","name":"Tract Master-Planned Data Center Park (TRIC)","aliases":["Tract Storey County","Peru Shelf / South Valley"],"locationId":"d33b7fc1-4135-44b1-b1e9-186cf5efd9e9","lat":null,"lng":null,"locationPrecision":null,"landStatus":"greenfield","lifecycleState":"announced","powerSourceMix":"mixed","interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"WECC","waterSourceNotes":"Tract controls over 1,100 acre-feet of water rights at TRIC","servingUtility":null,"acreage":2200,"totalBuildingSqft":null,"streetAddress":null,"notes":"Tract has assembled 2,200+ acres (part of a broader ~8,590-acre position) at the Tahoe-Reno Industrial Center in Storey County, positioned as master-planned data center land for hyperscalers, with an NV Energy relationship framed around delivering 2 GW+ over time. In April 2026 Tract filed state energy-regulator and Nevada DEP air-quality applications for temporary on-site gas generation (144 MW South Valley + 218 MW Peru Ridge) to bridge 2-3 years until permanent NV Energy service. No vertical data center construction confirmed; end operators/offtakers not disclosed.","keyFacts":[{"label":"2,200+ acres Peru Shelf + South Valley (primary)","value":"On Oct 2, 2023, Tract announced via GlobeNewswire acquisition of more than 2,200 acres inside the Tahoe-Reno Industrial Center (TRI) in Storey County, Nevada, comprising areas commonly called Peru Shelf and South Valley, for master-planned data center park development ([GlobeNewswire / Tract, Oct 2 2023](https://www.globenewswire.com/news-release/2023/10/02/2752900/0/en/tract-completes-acquisition-of-2-200-acres-in-storey-county-nevada-and-partners-with-nv-energy-to-deliver-two-gigawatts-of-power-capacity.html))","sourceUrl":"https://www.globenewswire.com/news-release/2023/10/02/2752900/0/en/tract-completes-acquisition-of-2-200-acres-in-storey-county-nevada-and-partners-with-nv-energy-to-deliver-two-gigawatts-of-power-capacity.html"},{"label":"NV Energy 2 GW+ / power from 2026 (primary)","value":"Tract's Oct 2023 release states commitments from NV Energy to deliver over two gigawatts of power beginning in 2026, and quotes NV Energy President and CEO Doug Cannon on partnering for long-range planning so reliable power can be delivered to the two Tract sites. Treat the 2 GW+ figure as the stated utility commitment / planning target in that release, not as energized load ([GlobeNewswire / Tract, Oct 2 2023](https://www.globenewswire.com/news-release/2023/10/02/2752900/0/en/tract-completes-acquisition-of-2-200-acres-in-storey-county-nevada-and-partners-with-nv-energy-to-deliver-two-gigawatts-of-power-capacity.html))","sourceUrl":"https://www.globenewswire.com/news-release/2023/10/02/2752900/0/en/tract-completes-acquisition-of-2-200-acres-in-storey-county-nevada-and-partners-with-nv-energy-to-deliver-two-gigawatts-of-power-capacity.html"},{"label":"1,100+ acre-feet water rights (primary)","value":"Alongside the land purchase, Tract stated it controls over 1,100 acre-feet of water rights for the Storey County TRI sites ([GlobeNewswire / Tract, Oct 2 2023](https://www.globenewswire.com/news-release/2023/10/02/2752900/0/en/tract-completes-acquisition-of-2-200-acres-in-storey-county-nevada-and-partners-with-nv-energy-to-deliver-two-gigawatts-of-power-capacity.html))","sourceUrl":"https://www.globenewswire.com/news-release/2023/10/02/2752900/0/en/tract-completes-acquisition-of-2-200-acres-in-storey-county-nevada-and-partners-with-nv-energy-to-deliver-two-gigawatts-of-power-capacity.html"},{"label":"Master-planned shovel-ready framing (primary)","value":"Tract CEO Grant van Rooyen, quoted in the Oct 2023 release, frames the campuses as master-planned and shovel-ready so hyperscale customers can gain speed and certainty from Tract's entitlements and infrastructure investments at TRI. Named end tenants and vertical construction starts are not disclosed in this primary release ([GlobeNewswire / Tract, Oct 2 2023](https://www.globenewswire.com/news-release/2023/10/02/2752900/0/en/tract-completes-acquisition-of-2-200-acres-in-storey-county-nevada-and-partners-with-nv-energy-to-deliver-two-gigawatts-of-power-capacity.html))","sourceUrl":"https://www.globenewswire.com/news-release/2023/10/02/2752900/0/en/tract-completes-acquisition-of-2-200-acres-in-storey-county-nevada-and-partners-with-nv-energy-to-deliver-two-gigawatts-of-power-capacity.html"}],"reviewStatus":"reviewed","sources":[{"url":"https://finance.yahoo.com/news/tract-completes-acquisition-2-200-140300590.html","date":"2023-10-02","title":"Tract Completes Acquisition of 2,200 Acres in Storey County, Nevada and Partners with NV Energy to Deliver Two Gigawatts of Power Capacity","publisher":"GlobeNewswire / Tract"},{"url":"https://thenevadaindependent.com/article/why-a-northern-nevada-data-center-wants-to-build-its-own-temporary-natural-gas-power-plant","date":"2026-05-03","title":"Why a Northern Nevada data center wants to build its own temporary natural gas power plant","publisher":"The Nevada Independent"},{"url":"https://www.globenewswire.com/news-release/2023/10/02/2752900/0/en/tract-completes-acquisition-of-2-200-acres-in-storey-county-nevada-and-partners-with-nv-energy-to-deliver-two-gigawatts-of-power-capacity.html","date":"2023-10-02","title":"Tract Completes Acquisition of 2,200 Acres in Storey County, Nevada and Partners with NV Energy to Deliver Two Gigawatts of Power Capacity","publisher":"GlobeNewswire / Tract"}],"reviewNote":null,"createdAt":"2026-08-17T20:25:38.750Z","updatedAt":"2026-09-28T13:43:08.165Z","location":{"id":"d33b7fc1-4135-44b1-b1e9-186cf5efd9e9","name":"Storey County","slug":"storey-county-nevada","kind":"city","parentLocationId":"06c29acd-073c-47f8-91cd-82f02cdaff32","region":"Nevada","lat":39.4572167,"lng":-119.5157991,"reviewStatus":"reviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-17T20:25:38.372Z","updatedAt":"2026-08-21T03:20:12.226Z"},"parties":[{"id":"498536b6-f4a9-4ba2-a98d-087ed8ba7fcf","dataCenterId":"79dc4d14-f2b6-4caf-b4d9-2620039c6a94","companyId":null,"externalName":"Tract (Tract Capital)","role":"developer","structureNotes":"Master-planned data center land developer","createdAt":"2026-08-17T20:25:40.727Z","company":null},{"id":"b3c190cb-e6fa-4205-895d-2b88d25dd893","dataCenterId":"79dc4d14-f2b6-4caf-b4d9-2620039c6a94","companyId":null,"externalName":"NV Energy","role":"utility","structureNotes":"WECC; permanent power provider","createdAt":"2026-08-17T20:25:41.490Z","company":null},{"id":"23c147d1-6d00-4c75-947d-f2359ccf24bc","dataCenterId":"79dc4d14-f2b6-4caf-b4d9-2620039c6a94","companyId":null,"externalName":"Fleet Data Centers","role":"developer","structureNotes":"Subsidiary of Tract Capital Management; developing South Valley and Peru Ridge campuses","createdAt":"2026-08-19T00:29:50.074Z","company":null}],"capacityClaims":[{"id":"216491b1-faaa-4a28-89a2-3beca194175f","dataCenterId":"79dc4d14-f2b6-4caf-b4d9-2620039c6a94","series":"contracted","valueGw":2,"asOf":"2023-10-02T00:00:00.000Z","sourceUrl":"https://finance.yahoo.com/news/tract-completes-acquisition-2-200-140300590.html","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":"2 GW+ NV Energy delivery framed as multi-year; not energized.","createdAt":"2026-08-17T20:25:39.424Z"},{"id":"f1b5de01-bf82-4444-a958-d5f657e3589f","dataCenterId":"79dc4d14-f2b6-4caf-b4d9-2620039c6a94","series":"under_construction","valueGw":0.4,"asOf":"2026-05-01T00:00:00.000Z","sourceUrl":"https://www.kolotv.com/2026/05/20/gov-lombardo-construction-companies-break-ground-2-million-sq-ft-data-center-storey-co/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Fleet Data Centers (Tract Capital subsidiary): South Valley + Peru Ridge combined 400 MW critical compute (plus 30 MW utility compute per campus), 769-acre footprint; groundbreaking May 2026.","createdAt":"2026-08-19T00:29:48.399Z"}],"financialClaims":[{"id":"1ea6376d-d13a-478c-960a-c71f4b896f55","dataCenterId":"79dc4d14-f2b6-4caf-b4d9-2620039c6a94","kind":"capex","label":"Fleet Data Centers construction (South Valley + Peru Ridge)","valueUsd":"10000000000","capUsd":null,"conditions":null,"asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://www.nevadaappeal.com/news/2026/jun/09/nevada-data-center-firm-working-on-two-campuses-at-tahoe-reno-industrial-center/","sourceType":"journalist_report","evidenceTier":"reported","createdAt":"2026-08-19T00:29:48.936Z"}],"metricClaims":[],"powerProjects":[{"id":"7ba5fc3d-da59-4828-942f-81d4f714eceb","dataCenterId":"79dc4d14-f2b6-4caf-b4d9-2620039c6a94","name":"South Valley temporary gas plant","type":"gas","capacityGw":0.144,"lifecycleState":"announced","sourceUrl":"https://thenevadaindependent.com/article/why-a-northern-nevada-data-center-wants-to-build-its-own-temporary-natural-gas-power-plant","evidenceTier":"reported","note":"Air-quality permit application filed ~2026-04-20; temporary 2-3 yr bridge.","createdAt":"2026-08-17T20:25:39.961Z"},{"id":"e7f4f3fb-30ab-4231-bb75-74bab7610726","dataCenterId":"79dc4d14-f2b6-4caf-b4d9-2620039c6a94","name":"Peru Ridge temporary gas plant","type":"gas","capacityGw":0.218,"lifecycleState":"announced","sourceUrl":"https://thenevadaindependent.com/article/why-a-northern-nevada-data-center-wants-to-build-its-own-temporary-natural-gas-power-plant","evidenceTier":"reported","note":"Air-quality/state energy-regulator application; construction targeted 2027.","createdAt":"2026-08-17T20:25:40.342Z"}],"facilities":[],"incidents":[],"events":[{"id":"0a137011-5ef1-432a-8b68-7b1620b97df5","dataCenterId":"79dc4d14-f2b6-4caf-b4d9-2620039c6a94","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: Fleet Data Centers","occurredAt":"2026-08-19T00:29:50.507Z","createdAt":"2026-08-19T00:29:50.507Z"},{"id":"2fc2d069-8bfc-4dcb-b791-2ab821a93e6a","dataCenterId":"79dc4d14-f2b6-4caf-b4d9-2620039c6a94","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: Fleet Data Centers construction (South Valley + Peru Ridge)","occurredAt":"2026-08-19T00:29:49.318Z","createdAt":"2026-08-19T00:29:49.318Z"},{"id":"250673f8-5888-4c19-859a-ee304b65f040","dataCenterId":"79dc4d14-f2b6-4caf-b4d9-2620039c6a94","eventType":"capacity_changed","series":"under_construction","oldValue":null,"newValue":"0.4","claimId":"f1b5de01-bf82-4444-a958-d5f657e3589f","detail":null,"occurredAt":"2026-08-19T00:29:48.708Z","createdAt":"2026-08-19T00:29:48.708Z"},{"id":"43280a2d-f83a-4e05-808b-71e4e30f88dd","dataCenterId":"79dc4d14-f2b6-4caf-b4d9-2620039c6a94","eventType":"claim_recorded","series":"under_construction","oldValue":null,"newValue":"0.4","claimId":"f1b5de01-bf82-4444-a958-d5f657e3589f","detail":"reported · journalist_report","occurredAt":"2026-08-19T00:29:48.553Z","createdAt":"2026-08-19T00:29:48.553Z"},{"id":"1e0774c2-9681-48f1-9f9b-c626b49b1a51","dataCenterId":"79dc4d14-f2b6-4caf-b4d9-2620039c6a94","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: NV Energy","occurredAt":"2026-08-17T20:25:41.871Z","createdAt":"2026-08-17T20:25:41.871Z"},{"id":"c1eb9b35-ee85-48b5-8d33-056916302ea9","dataCenterId":"79dc4d14-f2b6-4caf-b4d9-2620039c6a94","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: Tract (Tract Capital)","occurredAt":"2026-08-17T20:25:41.108Z","createdAt":"2026-08-17T20:25:41.108Z"},{"id":"1c029114-5973-4962-bae1-e6880587bb0d","dataCenterId":"79dc4d14-f2b6-4caf-b4d9-2620039c6a94","eventType":"capacity_changed","series":"contracted","oldValue":null,"newValue":"2","claimId":"216491b1-faaa-4a28-89a2-3beca194175f","detail":null,"occurredAt":"2026-08-17T20:25:39.727Z","createdAt":"2026-08-17T20:25:39.727Z"},{"id":"bd18b27d-d0e6-4dfa-b2ac-02ca892884df","dataCenterId":"79dc4d14-f2b6-4caf-b4d9-2620039c6a94","eventType":"claim_recorded","series":"contracted","oldValue":null,"newValue":"2","claimId":"216491b1-faaa-4a28-89a2-3beca194175f","detail":"claimed · press_release","occurredAt":"2026-08-17T20:25:39.577Z","createdAt":"2026-08-17T20:25:39.577Z"}],"capacity_picture":{"announced_gw":null,"contracted_gw":2,"under_construction_gw":0.4,"energized_gw":null,"announced_minus_energized_gw":null,"by_series":{"announced":null,"contracted":{"valueGw":2,"asOf":"2023-10-02T00:00:00.000Z","evidenceTier":"claimed","sourceUrl":"https://finance.yahoo.com/news/tract-completes-acquisition-2-200-140300590.html"},"under_construction":{"valueGw":0.4,"asOf":"2026-05-01T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://www.kolotv.com/2026/05/20/gov-lombardo-construction-companies-break-ground-2-million-sq-ft-data-center-storey-co/"},"energized":null}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Tract Master-Planned Data Center Park (TRIC)","url":"https://registry.deploy.report/datacenters/tract-tric-storey-county-nevada","address":{"@type":"PostalAddress","addressLocality":"Storey County"}}}