{"id":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","slug":"vantage-tx1-san-antonio-bexar-texas","name":"Vantage TX1 San Antonio Campus","aliases":["Vantage TX1","Vantage San Antonio","TX12"],"locationId":"8c451bb9-eebd-4176-8769-5faee040cbc5","lat":29.44697655,"lng":-98.74359165,"locationPrecision":"exact","landStatus":"private","lifecycleState":"partially_energized","powerSourceMix":"mixed","interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":"2027-08-31T00:00:00.000Z","expectedEnergizationPrecision":"day","expectedEnergizationMilestone":"next_phase","dedicatedSubstation":null,"gridOperator":"ERCOT","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Vantage's San Antonio (Bexar County) campuses hold TCEQ minor air permits and are seeking to expand from 22 to 80+ generators; VoltaGrid is building ~423 MW of on-site natural-gas generation across two Vantage sites (near SH-151/Wiseman and on Omicron Drive). This is distinct from Vantage's Frontier campus in Shackelford County. Total IT capacity is reported in ranges (TX1 ~100-250 MW) and not firmly disclosed.","keyFacts":[{"label":"TX11 building","value":"14720 Omicron Dr; 242,667 sq ft; four 8 MW halls, 32 MW; about $95.8M; completion target Sep 2026."},{"label":"TX12 building (reported, Sep 2025)","value":"17420 Omicron Dr; up to 96 MW critical IT; about 432,800 sq ft; $276.8M; Oct 2025 to Aug 2027."},{"label":"Land","value":"Omicron Drive land bought Jul 2023 from the University of Texas System"},{"label":"Market context (reported)","value":"Near a large Microsoft campus on Lambda Drive in the Texas Research Park area"}],"reviewStatus":"reviewed","sources":[{"url":"https://www.datacenterdynamics.com/en/news/vantage-files-to-build-second-san-antonio-data-center-in-texas/","date":"2026-07-01","title":"Vantage files to build second San Antonio data center in Texas","publisher":"DCD"},{"url":"https://www.ksat.com/news/local/2026/07/10/air-quality-concerns-rise-as-data-center-company-seeks-approval-to-run-diesel-generators/","date":"2026-07-10","title":"Air quality concerns rise as data center company seeks approval to run diesel generators","publisher":"KSAT"},{"url":"https://www.tdlr.texas.gov/TABS/Search/Project/TABS2024007561","date":"2023-12-15","title":"TDLR TABS2024007561 — Data Center Building TX11","publisher":"Texas Department of Licensing and Regulation"},{"url":"https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026001234","title":"VANTAGE DATA CENTER (TX12) (TABS2026001234)","sourceName":"Texas Department of Licensing and Regulation","publishedAt":"2025-09-18"}],"reviewNote":null,"createdAt":"2026-08-17T20:24:09.801Z","updatedAt":"2026-11-18T03:24:31.393Z","location":{"id":"8c451bb9-eebd-4176-8769-5faee040cbc5","name":"San Antonio","slug":"san-antonio-texas","kind":"city","parentLocationId":"45f67762-10f4-4255-be84-45c73efe25f9","region":"Texas","lat":29.4246002,"lng":-98.4951405,"reviewStatus":"reviewed","aliases":["San Antonio, TX","San Antonio, Texas, USA"],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-17T20:24:09.429Z","updatedAt":"2026-11-02T18:32:15.604Z"},"parties":[{"id":"76bcc083-b732-477e-ba3d-9ad2920119dc","dataCenterId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","companyId":null,"externalName":"VoltaGrid","role":"utility","structureNotes":"On-site gas generation operator","createdAt":"2026-08-17T20:24:11.321Z","company":null},{"id":"89049fb1-5cfd-4897-8101-ad3f6659f691","dataCenterId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","companyId":"43c13a4e-5869-4ce0-8fb6-4b048fb7b5b2","externalName":"Vantage Data Centers","role":"developer","structureNotes":"DigitalBridge-backed","createdAt":"2026-08-17T20:24:10.564Z","company":{"id":"43c13a4e-5869-4ce0-8fb6-4b048fb7b5b2","name":"Vantage Data Centers","slug":"vantage-data-centers"}},{"id":"f0bd8a4a-38ea-4e87-8493-7206ff58848a","dataCenterId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","companyId":null,"externalName":"Bandera Electric Cooperative","role":"utility","structureNotes":"Local electric distribution utility listed for the Rogers Rd (TX2) site (not CPS Energy).","createdAt":"2026-08-19T00:15:01.612Z","company":null}],"capacityClaims":[{"id":"746a9f40-5494-4c16-8b3d-04451f0d0b84","dataCenterId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","series":"under_construction","valueGw":0.096,"asOf":"2026-08-01T00:00:00.000Z","sourceUrl":"https://www.datacenters.com/vantage-tx12-san-antonio","sourceType":"tracker","evidenceTier":"claimed","supersedesId":null,"note":"Building TX12 (Omicron Dr campus): up to 96 MW critical IT, two-story, 432,800 sq ft.","createdAt":"2026-08-19T00:14:58.831Z"},{"id":"010a2a79-15dc-479a-9683-05c605372873","dataCenterId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","series":"under_construction","valueGw":0.032,"asOf":"2026-08-01T00:00:00.000Z","sourceUrl":"https://www.datacenters.com/vantage-tx11-san-antonio","sourceType":"tracker","evidenceTier":"claimed","supersedesId":null,"note":"Building TX11: 32 MW critical IT, 242,665 sq ft, go-live early 2026.","createdAt":"2026-08-19T00:14:59.684Z"}],"financialClaims":[{"id":"9aab56f4-e13c-4420-9cd0-81c06ee461ff","dataCenterId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","kind":"capex","label":"Omicron campus investment","valueUsd":"448000000","capUsd":null,"conditions":"Described as Vantage's record Bexar County investment; >$1B combined registered along the Omicron corridor since 2020 (corridor-level).","asOf":"2026-08-01T00:00:00.000Z","sourceUrl":"https://www.yahoo.com/news/articles/data-center-boom-across-san-120800855.html","sourceType":"journalist_report","evidenceTier":"reported","createdAt":"2026-08-19T00:15:00.063Z"}],"metricClaims":[],"powerProjects":[{"id":"c363a845-153f-45f6-9d53-df58d70f91fc","dataCenterId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","name":"VoltaGrid on-site gas generation (Vantage SA)","type":"gas","capacityGw":0.423,"lifecycleState":"under_construction","sourceUrl":"https://www.ksat.com/news/local/2026/07/10/air-quality-concerns-rise-as-data-center-company-seeks-approval-to-run-diesel-generators/","evidenceTier":"reported","note":"~423 MW dedicated generation across two Vantage SA sites","createdAt":"2026-08-17T20:24:10.182Z"},{"id":"1b54a486-a456-49f3-a09c-d0ebe8d90808","dataCenterId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","name":"VoltaGrid on-site natural-gas prime power (San Antonio)","type":"gas","capacityGw":0.423,"lifecycleState":"partially_energized","sourceUrl":"https://insideclimatenews.org/news/22072026/texas-data-center-air-pollution-lawsuit/","evidenceTier":"reported","note":"~423 MW dedicated prime natural-gas generation across two Vantage SA sites combined (one operating, one under construction); ~151 diesel backup generators; TCEQ minor-source permits expanding from 22 to 80+.","createdAt":"2026-08-19T00:15:00.826Z"}],"permits":[{"id":"a184e029-def0-41d1-ad69-33255cee62ce","dataCenterId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","agency":"TCEQ","jurisdiction":"Texas","kind":"air","permitType":"Air registration (standard permit or permit by rule)","number":"175523","applicant":"Vantage Data Centers TX11 LLC","status":"active","filedDate":null,"decidedDate":null,"docket":null,"regulatedEntityId":"RN111852240","sourceUrl":"https://www15.tceq.texas.gov/crpub/index.cfm?fuseaction=regent.showSingleRN&re_id=272583872023332","reviewStatus":"reviewed","reviewNote":"Campus link confirmed 2026-11-18: TCEQ lists this regulated entity as VANTAGE TX 11 at 14720 Omicron Dr, San Antonio, owned by Vantage Data Centers TX11 LLC, and the TX11 building at that address is the first building on Vantage's TX1 campus. https://baxtel.com/campus/vantage-san-antonio-tx1-campus \"Vantage Data Centers' TX1 campus sits on Omicron Drive in west San Antonio, Texas. Vantage bought the land from the University of Texas System in July 2023. TX11: a two-story, 242,667 sq ft data center at 14720 Omicron Dr, the first building on the campus.\"","lastCheckedAt":"2026-11-17T21:27:16.770Z","createdAt":"2026-11-17T21:14:20.681Z","updatedAt":"2026-11-18T18:51:16.316Z"},{"id":"b87a7607-9ad6-414b-a6ba-0aed58866f70","dataCenterId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","agency":"TCEQ","jurisdiction":"Texas","kind":"air","permitType":"Title V operating permit","number":"4791","applicant":"Vantage Data Centers TX11 LLC","status":"pending","filedDate":null,"decidedDate":null,"docket":null,"regulatedEntityId":"RN111852240","sourceUrl":"https://www15.tceq.texas.gov/crpub/index.cfm?fuseaction=regent.showSingleRN&re_id=272583872023332","reviewStatus":"reviewed","reviewNote":"Campus link confirmed 2026-11-18: TCEQ lists this regulated entity as VANTAGE TX 11 at 14720 Omicron Dr, San Antonio, owned by Vantage Data Centers TX11 LLC, and the TX11 building at that address is the first building on Vantage's TX1 campus. https://baxtel.com/campus/vantage-san-antonio-tx1-campus \"Vantage Data Centers' TX1 campus sits on Omicron Drive in west San Antonio, Texas. Vantage bought the land from the University of Texas System in July 2023. TX11: a two-story, 242,667 sq ft data center at 14720 Omicron Dr, the first building on the campus.\"","lastCheckedAt":"2026-11-17T21:27:16.770Z","createdAt":"2026-11-17T21:14:20.964Z","updatedAt":"2026-11-18T18:51:16.601Z"},{"id":"e4fbe90f-1fa2-4204-9043-988e8318ee3f","dataCenterId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","agency":"TCEQ","jurisdiction":"Texas","kind":"stormwater","permitType":"Construction stormwater authorization","number":"TXR1511PF","applicant":null,"status":"cancelled","filedDate":null,"decidedDate":null,"docket":null,"regulatedEntityId":"RN111852240","sourceUrl":"https://www15.tceq.texas.gov/crpub/index.cfm?fuseaction=regent.showSingleRN&re_id=272583872023332","reviewStatus":"reviewed","reviewNote":"Campus link confirmed 2026-11-18: TCEQ lists this regulated entity as VANTAGE TX 11 at 14720 Omicron Dr, San Antonio, owned by Vantage Data Centers TX11 LLC, and the TX11 building at that address is the first building on Vantage's TX1 campus. This authorization is cancelled. https://baxtel.com/campus/vantage-san-antonio-tx1-campus \"Vantage Data Centers' TX1 campus sits on Omicron Drive in west San Antonio, Texas. Vantage bought the land from the University of Texas System in July 2023. TX11: a two-story, 242,667 sq ft data center at 14720 Omicron Dr, the first building on the campus.\"","lastCheckedAt":"2026-11-17T21:27:16.770Z","createdAt":"2026-11-17T21:14:21.275Z","updatedAt":"2026-11-18T18:51:16.988Z"},{"id":"dc10286d-b48d-4d18-9f8d-b0c5215e9f59","dataCenterId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","agency":"TCEQ","jurisdiction":"Texas","kind":"stormwater","permitType":"Construction stormwater authorization","number":"TXR1535PD","applicant":null,"status":"active","filedDate":null,"decidedDate":null,"docket":null,"regulatedEntityId":"RN111852240","sourceUrl":"https://www15.tceq.texas.gov/crpub/index.cfm?fuseaction=regent.showSingleRN&re_id=272583872023332","reviewStatus":"reviewed","reviewNote":"Campus link confirmed 2026-11-18: TCEQ lists this regulated entity as VANTAGE TX 11 at 14720 Omicron Dr, San Antonio, owned by Vantage Data Centers TX11 LLC, and the TX11 building at that address is the first building on Vantage's TX1 campus. https://baxtel.com/campus/vantage-san-antonio-tx1-campus \"Vantage Data Centers' TX1 campus sits on Omicron Drive in west San Antonio, Texas. Vantage bought the land from the University of Texas System in July 2023. TX11: a two-story, 242,667 sq ft data center at 14720 Omicron Dr, the first building on the campus.\"","lastCheckedAt":"2026-11-17T21:27:16.770Z","createdAt":"2026-11-17T21:14:21.555Z","updatedAt":"2026-11-18T18:51:17.366Z"}],"facilities":[{"slug":"vantage-tx22-san-antonio-bexar-tx","name":"Vantage Data Centers TX22","status":"planned","criticalItMw":null,"facilityType":"hyperscale"},{"slug":"vantage-tx22-san-antonio-bexar-county-tx","name":"Vantage TX22 (San Antonio)","status":"under_construction","criticalItMw":null,"facilityType":"hyperscale"},{"slug":"vantage-tx12-san-antonio-bexar-tx","name":"Vantage Data Centers TX12","status":"under_construction","criticalItMw":96,"facilityType":"hyperscale"},{"slug":"vantage-tx12-san-antonio-tx1-campus-bexar-county-tx","name":"Vantage TX12 (San Antonio TX1 campus)","status":"under_construction","criticalItMw":96,"facilityType":"hyperscale"}],"incidents":[],"events":[{"id":"8ffde1ee-9cfc-41be-b800-ec5f60cfbf3c","dataCenterId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","eventType":"energization_date_changed","series":null,"oldValue":null,"newValue":"2027-08-31|day","claimId":null,"detail":"intake proposal 1c9d923c-7064-4fdd-a4e7-c6141557bad0","occurredAt":"2026-11-18T03:24:31.989Z","createdAt":"2026-11-18T03:24:31.989Z"},{"id":"1e8808d2-caba-426d-b77f-4df68e6f7613","dataCenterId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","eventType":"permit_recorded","series":null,"oldValue":null,"newValue":"TCEQ TXR1535PD: active","claimId":null,"detail":"Construction stormwater authorization TXR1535PD recorded from https://www15.tceq.texas.gov/crpub/index.cfm?fuseaction=regent.showSingleRN&re_id=272583872023332","occurredAt":"2026-11-17T21:14:21.730Z","createdAt":"2026-11-17T21:14:21.730Z"},{"id":"90c13fae-c15f-43ea-bfef-61906e5461ee","dataCenterId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","eventType":"permit_recorded","series":null,"oldValue":null,"newValue":"TCEQ TXR1511PF: cancelled","claimId":null,"detail":"Construction stormwater authorization TXR1511PF recorded from https://www15.tceq.texas.gov/crpub/index.cfm?fuseaction=regent.showSingleRN&re_id=272583872023332","occurredAt":"2026-11-17T21:14:21.415Z","createdAt":"2026-11-17T21:14:21.415Z"},{"id":"b298a123-f9e9-4b47-a2f4-023eec574b3d","dataCenterId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","eventType":"permit_recorded","series":null,"oldValue":null,"newValue":"TCEQ 4791: pending","claimId":null,"detail":"Title V operating permit 4791 recorded from https://www15.tceq.texas.gov/crpub/index.cfm?fuseaction=regent.showSingleRN&re_id=272583872023332","occurredAt":"2026-11-17T21:14:21.102Z","createdAt":"2026-11-17T21:14:21.102Z"},{"id":"2edb98e9-cd0e-4536-9d04-0b0f037d265b","dataCenterId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","eventType":"permit_recorded","series":null,"oldValue":null,"newValue":"TCEQ 175523: active","claimId":null,"detail":"Air registration (standard permit or permit by rule) 175523 recorded from https://www15.tceq.texas.gov/crpub/index.cfm?fuseaction=regent.showSingleRN&re_id=272583872023332","occurredAt":"2026-11-17T21:14:20.822Z","createdAt":"2026-11-17T21:14:20.822Z"},{"id":"ab5633a1-6e3a-4884-bb66-f70e6b1cacc0","dataCenterId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: Bandera Electric Cooperative","occurredAt":"2026-08-19T00:15:01.996Z","createdAt":"2026-08-19T00:15:01.996Z"},{"id":"e2582843-25fd-410e-838b-65e22406d602","dataCenterId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: Omicron campus investment","occurredAt":"2026-08-19T00:15:00.443Z","createdAt":"2026-08-19T00:15:00.443Z"},{"id":"65a6a432-6811-446e-9175-66cd5bbe620f","dataCenterId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","eventType":"claim_recorded","series":"under_construction","oldValue":null,"newValue":"0.032","claimId":"010a2a79-15dc-479a-9683-05c605372873","detail":"claimed · tracker","occurredAt":"2026-08-19T00:14:59.837Z","createdAt":"2026-08-19T00:14:59.837Z"},{"id":"7fc90eb0-c82f-495b-b1ae-707c200d3462","dataCenterId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","eventType":"capacity_changed","series":"under_construction","oldValue":null,"newValue":"0.096","claimId":"746a9f40-5494-4c16-8b3d-04451f0d0b84","detail":null,"occurredAt":"2026-08-19T00:14:59.133Z","createdAt":"2026-08-19T00:14:59.133Z"},{"id":"edc4e251-ebbd-4fa4-ba9d-7a1a78c0890c","dataCenterId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","eventType":"claim_recorded","series":"under_construction","oldValue":null,"newValue":"0.096","claimId":"746a9f40-5494-4c16-8b3d-04451f0d0b84","detail":"claimed · tracker","occurredAt":"2026-08-19T00:14:58.983Z","createdAt":"2026-08-19T00:14:58.983Z"},{"id":"54a1db1f-d2da-4d4d-904f-c3b0dce18a54","dataCenterId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: VoltaGrid","occurredAt":"2026-08-17T20:24:11.710Z","createdAt":"2026-08-17T20:24:11.710Z"},{"id":"00799191-0db6-45dc-937e-a56518820d49","dataCenterId":"b2469bd8-21e1-4d69-bee0-c5ca76ccf3ce","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: Vantage Data Centers","occurredAt":"2026-08-17T20:24:10.948Z","createdAt":"2026-08-17T20:24:10.948Z"}],"capacity_picture":{"announced_gw":null,"contracted_gw":null,"under_construction_gw":0.096,"energized_gw":null,"announced_minus_energized_gw":null,"by_series":{"announced":null,"contracted":null,"under_construction":{"valueGw":0.096,"asOf":"2026-08-01T00:00:00.000Z","evidenceTier":"claimed","sourceUrl":"https://www.datacenters.com/vantage-tx12-san-antonio"},"energized":null}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Vantage TX1 San Antonio Campus","url":"https://registry.deploy.report/datacenters/vantage-tx1-san-antonio-bexar-texas","geo":{"@type":"GeoCoordinates","latitude":29.44697655,"longitude":-98.74359165},"address":{"@type":"PostalAddress","addressLocality":"San Antonio"}}}